Commercial General Building, Demolition, Electrical, Fire Protection, Hvac/Mechanical work permitted November 4, 2024, with 9 permits through October 30, 2026, declaring $1,483,495 of work.
101 Performance Drive - The Sports House: ********* Interior fit-out in the existing Under Armour TMB2 building includes ******* SCOPE OF WORK: ---- INTERIOR ALTERATIONS ----- - minor demolition of some interior partitions, - New work includes, interior partitions, and finishes --- TRADES --- - lighting, mechanical and electrical. mechanical, electrical . AS PER PLANS AND AS PER CODE ******** Approved For Work only. Subject to the permitted uses and regulations under the provisions of the Zoning Ordinance. *********
Baltimore’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
9 permits issued Nov 4 – Oct 30, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#BCCM-26-004368 Demolition UNDER ARMOUR FUEL AND INNOVATION: Scope of Work ----- Level II Interior Alterations ---- - MINOR DEMOLITION AND INTERIOR ALTERATION TO NON-LOAD BEARING PARTITIONS IN EXISTING UNOCCUPIED SPACE (NO STRUCTURAL MODIFICATIONS REQUIRED) As Per Plans and as Per Code. |
| Not published |
| $500K |
#BCCM-26-004292 Fire protection UA Brand Studio: EXPEDITED FIRE REVIEW: Relocate 39 and add 4-sprinklers form an existing wet pipe sprinkler system located on the 1st Floor of the existing Under Amour TMB2 Building. Largest pipe size is 1 inch. Total sprinklers is 43. | Not published | $17K |
#BCCM-26-002782 Electrical 101 Performance Drive - The Sports House: ********* Interior fit-out in the existing Under Armour TMB2 building includes ******* SCOPE OF WORK: ---- INTERIOR ALTERATIONS ----- - minor demolition of some interior partitions, - New work includes, interior partitions, and finishes --- TRADES --- -… | Not published | $850K |
#BCCM-25-001908 HVAC / Mechanical UA Sports House Executive Office: SCOPE OF WORK: ------ INTERIOR ALTERATIONS (EQUIPMENT) --------- Interior renovation only for added mechanical exhaust in executive office on Level 05. No modification to existing occupancy or egress. AS PER PLAN AND AS PER CODE. | Not published | $5K |
#BCCM-25-003946 Building 101 Performance Center Drive Loading Dock Office: Supply and install (1) new ductless Split system as showin in provided plans. | Not published | $11.5K |
#BCCM-25-002257 Building UA Sports House Loading Dock Office: Interior renovation only for added office space in existing loading dock at Level 01. No modification to existing occupancy or egress. | Not published | $100K |
#BUSE-25-000516 Other UA Smoothie Bar: Use Rear Portion of 1st Floor as Smoothie Bar and Cafe. | Not published | — |
#USE2024-54634 Building for ka 101 performance drive: use 2nd floor portion of building as cafeteria (for employee use) and offices. | Not published | — |