Get ProEvery project in every city · from $79/mo
Get Promultifamily project · Baltimore, MD
Multifamily General Building, Fire Protection work permitted October 24, 2025, with 4 permits through September 28, 2026, declaring $313,589 of work.
Park Charles Loading Dock: SCOPE OF WORK: -------- EXTERIOR ALTERATIONS ------- Concrete repairs at loading lock. AS PER PLANS AND AS PER CODE.
Baltimore’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
4 permits issued Oct 24 – Sep 28, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#BCCM-26-003166 Fire protection 218 N Charles St Pump Replacement: Feed new fire pump from existing controller. Feed jockey pump from new jockey pump controller. | Not published | $8K | |
#BCCM-26-003066 Fire protection 218 North Charles Street Pump, Jockey Pump and Jockey Pump Controller Replacement: Relay Fire & Safety dba Advanced Fire Protection will replace the existing fire pump and jockey pump assemblies with new UL/FM-approved fire pump equipment and associated controls in the existing fire pump room… |
| Not published |
| $53.6K |
#BCCM-25-003496 Other Center Plaza: This property is in a Urban Renewal Plan Area and must follow URP guidelines. For more information visit, https://planning.baltimorecity.gov/planning-plans/urban-renewalinformation Install one dedicated circuit and low voltage enclosure, connected to added circuit. Enclosure to be… | Not published | $4.4K |
#BCCM-25-002256 Building Park Charles Loading Dock: SCOPE OF WORK: -------- EXTERIOR ALTERATIONS ------- Concrete repairs at loading lock. AS PER PLANS AND AS PER CODE. | Not published | $248K |