Get ProEvery project in every city · from $79/mo
Get Procommercial project · Baltimore, MD
Commercial General Building, Electrical, Fire Protection work permitted May 6, 2025, with 28 permits through August 12, 2026, declaring $6,078,938 of work.
Get new commercial permits in Baltimore, free weekly email
JHHS ZB3 ENIS 316 BI-PLANE REPLACEMENT: The project includes the removal of existing imaging equipment and the installation of new Siemens imaging equipment (Model CS14098) in Room ZB 316 (3251), along with associated Siemens control workstations located in the Control Room (3262). The work also includes widening the opening of Equipment Room (3249) to meet the clearance requirements necessary for the installation of the new Siemens equipment. A new Equipment Closet (3253) will be constructed to house the Karl Storz A/V equipment rack (NEO-IP). In addition, new wall-mounted control panels…
Baltimore’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
28 permits issued May 6 – Aug 12, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#BCCM-26-002247 Building |
ZB4 4110 CT (FLASH) REPLACEMENT: The scope of work consists of the replacement of the existing CT imaging equipment with a newer CT imaging equipment also by Siemens. New scope of work includes re-painting of the imaging room and replacement of the finish flooring and ceiling, light fixtures and…
| Not published |
| $775K |
#BCCM-26-003209 Fire protection 26-125 JHHS BiPlane Replacement: THIS PROJECT IS GOING THROUGH THE 3RD PARTY REVIEW FAST TRACK PROCESS. ALL DOCUMENTS HAVE A 3RD PARTY REVIEW STAMP. ADD (1) AND RELOCATE (6) PENDENT SPRINKLERS TO PROVIDE PROPER FIRE PROTECTION PER NFPA 13 (2019) AND THE CITY OF BALTIMORE FIRE MARSHAL REQUIREMENTS. | Not published | $4K |
#BCCM-26-000634 Electrical CENTRAL STERILE PROCESSING EQUIPMENT REPLACEMENT: SCOPE OF WORK: --- LEVEL II ALTERATIONS (EQUIPMENT) ------ - EQUIPMENT REMOVAL AND NEW EQUIPMENT REPLACEMENT FOR CART WASHER, STERILIZERS, INSTRUMENT WASHERS, SINKS, LOW TEMP STERILIZERS, DRYING CABINET, AND SONIC CLEANERS. THIS PROJECT HAS… | Not published | $525K |
#BCCM-26-000225 Electrical Zayed Bloomberg Donor Site Enhancements: New lighting, lit signage, stone routing, site blade sign relocation and associated electrical work. | Not published | $1.3M |
#BCCM-26-001267 Building JHHS ZB3 ENIS 316 BI-PLANE REPLACEMENT: The project includes the removal of existing imaging equipment and the installation of new Siemens imaging equipment (Model CS14098) in Room ZB 316 (3251), along with associated Siemens control workstations located in the Control Room (3262). The work also… | Not published | $2.5M |
#BCCM-26-001594 Fire protection JHHS Bendann RODI Fire Alarm: adding 1 device to existing system. as per plans as per code. | Not published | $2.5K |
#BCCM-26-002436 Other 18270 - JHM ZB3 IR: Provide and install six (6) flush mount 2-data locations Provide and install one (1) flush mount 1-data wall phone location Provide and install one (1) flush mount 2-data wireless access point Install one (1) customer-provided wireless access point | Not published | $11.5K |
#BCCM-26-002212 Electrical C260120 - Johns Hopkins: Disconnect and make safe existing electrical equipment, furnish and install a new electrical panel, and install new lighting and power circuits throughout the project area. Temporary power and temporary lighting will be provided as needed during construction to support… | Not published | $50K |
#BCCM-25-002526 Building JHHS - ZB 3 IR 10 REPLACEMENT: SCOPE OF WORK: PLEASE AMEND THIS PERMIT TO ADD ALL REQUIRE LICENSED PROFESSIONALS BEFORE ANY WORK CAN BEGIN ------- INTEROR ALTERATIONS (EQUIMENT INSTALLATION) -------- -THE PROJECT SCOPE CONSISTS OF REPLACING THE CURRENT IMAGING EQUIPMENT WITH A NEW SIEMENS XCITE… | Not published | $50K |
#BCCM-25-003021 Building JOHN HOPKINS HOSPITAL - HELIPAD: The scope of work includes, BFPE removing the existing foam monitor nozzles and foam tanks that protect the existing helipads. BFPE will install a new one hundred and fifty gallon foam tank and twelve fixed nozzles to provide the proper foam protection for the… | Not published | $213K |
#BCCM-26-001163 Fire protection JH ZB3 IR10: BFPE WILL RELOCATE SPRINKLER HEADS WHILE MAINTAINING PROPER COVERAGE IN THE AREA OF WORK | Not published | $10.2K |
#BCCM-26-000982 Fire protection JH BEDNAN RODI: BFPE will add and relocate sprinkler heads in order to accommodate the renovations while still maintaining proper coverage. | Not published | $9.3K |
#BCCM-25-003335 Fire protection JHH ZB 4106 CT: EXISTING SPRINKLER SYSTE RELOCAT 5 SPRINKLER HEADS 3RD PARTY REVIEW. | Not published | $11.6K |
#BCCM-25-004099 Fire protection JHH ZAYED BLOOMBERG 4TH FL PEDS PACU: WORK CONSISTS OF MODIFYING EXISTING WET FIRE SPRINKLER SYSTEM BY ADDING / RELOCATING SPRINKLERS TO ACCOMODATE THE NEW INT. ALT. DESIGN AND INSTALLATION OF COMPONENTS SHALL BE IN ACCORDANCE WITH NFPA 13-2019 EDT. AND BALTIMORE CITY FIRE CODE. MATCH EXISTING… | Not published | $9.9K |
#BCCM-25-002903 Building 18216 - JHH Endoscopy Cleaning and Storage: Provide and install thirteen (13) flush mount 2-data locations. Provide and install faceplates and modular jacks as required for the termination of the new 4-pair cables at the workstation location. Provide and install one (1) Category 6a 48-port patch… | Not published | $18.8K |
#BCCM-25-002498 Other JHH ZB ROOM 204: The scope of work includes BFPE adding and relocating quick response pendents to provide the proper coverage. | Not published | $15.6K |
#BCCM-25-002461 Other 18215 - JHH ZB Room: Install 13 Data locations | Not published | $22.2K |
#BCCM-25-001125 Other CT SCANNER (ZB 4106) EQUIPMENT REPLACEMENT: CT SCANNER EQUIPMENT REPLACEMENT AND INTERIOR FINISH UPGRADES | Not published | — |
#BCCM-25-000321 Electrical ZB Endoscope Cleaning & Storage: *********** Renovation of existing storage room within the Sheik Zayed tower of the Johns Hopkins Main Campus. *********** SCOPE OF WORK: -------- INTERIOR ALTERATIONS (equipment) ----------- includes the replacement of existing disinfection/sterilization cabinets… | Not published | $100K |
#BRCM-25-013753 Building JHH 2nd Floor Renovation: Removal and Installation of Single VAV, Adjustment of Ductwork, Insulation, Balancing. | Not published | $35K |
#BCCM-25-000318 Electrical ZB Endoscopy Room 204 Renovation: Renovation of existing Endoscopy room within the Sheik Zayed tower of the Johns Hopkins Main Campus. Scope includes replacement/relocation of equipment, casework, sinks, finishes, lighting fixtures and upgrades/modifications to existing mechanical, electrical,… | Not published | $300K |
#BCCM-25-000320 Electrical ZB Endoscopy Room 204 - DEMO ONLY: DEMO ONLY Renovation of existing Endoscopy room within the Sheik Zayed tower of the Johns Hopkins Hospital. Scope includes demolition/removal of equipment, casework, sinks, finishes, lighting fixtures, electrical and mechanical devices as identified in the… | Not published | $30K |
#BCCM-25-001184 Fire protection JHHS CE FLUORO IR-11: BFPE to relocate 5 sprinkler heads within the new X-Ray room to accommodate the new layout. Per JHHS specs new heads are to be hard piped, replacing the existing flex hoses. 2 outlets are to be plugged off. | Not published | $16.9K |
#BCCM-25-001607 Building 251061 - DAVIS - JHHS MRI: LOW VOLTAGE ONLY - INSTALLATION OF 12 DATA CABLES IN SUPPORT OF BUILDING PERMIT COM2024-03775 | Not published | $8K |
#BCCM-25-001606 Building 251061 - DAVIS - JHHS FLOUROSCOPY: LOW VOLTAGE ONLY - INSTALLATION OF 16 LOW VOLT DATA CABLES IN SUPPORT OF BUILDING PERMIT COM2024-03774 | Not published | $10K |
#BCCM-25-000226 Building Bendann L1 CSP RO/DI System: SCOPE OF WORK: -------- INTERIOR ALTERATIONS (EQUIPMENT INSTALL) -------- Water purification RO/DI system for existing cart washer, instrument washers, sink, and sonic cleaner. AS PER PLANS AND AS PER CODE. | Not published | $124K |
#BCCM-25-001278 Other Johns Hopkins Hospital ZB3 ENIS Bi-Plane Siemens Equipment Cables: Install Eleven (11) low voltage and equipment cables for Siemens Medical Equipment in existing raceways and medical trough. | Not published | — |
#BCCM-25-000262 Building JHH: The scope of work includes 13 heads. BFPE removing the existing main and branchline inside of the area of work. We will run new main and branchlines to provide the proper coverage in the newly renovated OR room. | Not published | $21.9K |