Commercial General Building, Electrical, Fire Protection, Mep work permitted June 16, 2025, with 8 permits through October 1, 2026, declaring $45,000 of work.
Mast Labs Fit-Out: SCOPE OF WORK: ------ LEVEL II INTERIOR ALTERATIONS ------- The structure is located in the regulatory floodplain. Natural grade near the site is 8 FT and the Flood Protection Elevation (FPE) is 9.4 FT NAVD 88. All MEP components must be located above the FPE (1.4 ft above grade) or be made watertight according to ASCE 24. - INTERIOR TENANT BUILDOUT IN EXISTING BUILDING FOR NEW TENANT AS PER PLANS AS PER CODE. PLEASE AMEND THIS PERMIT APPLICATION TO ADD ALL REQUIRED LICENSED PROFESSIONALS BEFORE ANY WORK CAN BEGIN.
Baltimore’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
8 permits issued Jun 16 – Oct 1, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#BCCM-26-004008 |
Fire protection
Kinderhealth Expansion Fire Alarm: Extend fire alarm into adjacent expansion space in existing building. Work will include adding additional devices onto an existing system.
| Not published |
| $5K |
#BUSE-26-002513 Building Mast Labs U&O: Use Suite 140 as office space in an existing building | Not published | — |
#BCCM-25-004177 Fire protection Mast Labs - Fire Alarm: INSTALL FIRE ALARM SYSTEM FOR NEW TENANT IN AN EXISTING BUILDING. THE FIRE ALARM SYSTEM WILL INCLUDE ADDING DEVICES ON TO AN EXISTING SYSTEM WITHIN THE EXISTING BUILDING AS PER PLANS AS PER CODE. | Not published | $5K |
#BCCM-26-001227 Fire protection MAST: Relocate 34 sprinklers and add 19 sprinklers for a new tenant space build out. Approved For Work only. Subject to the permitted uses and regulations under the provisions of the Zoning Ordinance. | Not published | $17.5K |
#BCCM-25-003345 MEP Mast Labs Fit-Out: SCOPE OF WORK: ------ LEVEL II INTERIOR ALTERATIONS ------- The structure is located in the regulatory floodplain. Natural grade near the site is 8 FT and the Flood Protection Elevation (FPE) is 9.4 FT NAVD 88. All MEP components must be located above the FPE (1.4 ft above… | Not published | $20K |
#BCCM-25-004180 Electrical Mast Location Low Voltage network install: This project involves the installation of a low-voltage network system consisting of seventeen (17) network-connected devices, including data ports, access points, and associated cabling infrastructure. All cabling will be Category 6 (Cat6) or equivalent,… | Not published | — |
#BUSE-25-002670 Other Helping Hands U&O: Use of portion k/a Suite 150 as a health-care clinic. | Not published | — |
#BCCM-25-001284 Fire protection Helping Hands - Fire Alarm: INSTALL FIRE ALARM SYSTEM FOR NEW TENANT IN AN EXISTING BUILDING. THE FIRE ALARM SYSTEM WILL INCLUDE ADDING DEVICES ON TO AN EXISTING SYSTEM WITHIN THE EXISTING BUILDING AS PER PLANS AS PER CODE. | Not published | $2.5K |