Get Promultifamily project · Baltimore, MD
Multifamily General Building, Fire Protection work permitted May 15, 2026, with 5 permits through May 26, 2026, declaring $39,700,000 of work.
PERKINS 5B: ************ DEVELOPMENT IS PART OF THE OVERALL PERKINS REDEVELOPMENT UNDER PHASE VB ON BLOCK C AND INCLUDES ONE MULTI-FAMILY ELEVATOR BUILDING. MULTI-FAMILY BUILDING E IS LOCATED ON THE SOUTHERN PORTION OF BLOCK C, FRONTING CAROLINE AND BANK STREET. *********** SCOPE OF WORK: -------- NEW BUILDING -------- BUILDING E IS A 90 UNIT 4-STORY MULTI-FAMILY ELEVATOR BUILDING WITH PARKING LOCATED BELOW A PORTION OF THE FIRST FLOOR. AS PER PLANS AS PER CODE. ******* SEPARATE PERMIT REQUIRED FOR NEW/ALTERATION FIRE ALARM SYSTEM.DRAWINGS PROVIDED IN THIS PERMIT WILL BE REFERENCE ONLY.…
Baltimore’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
5 permits issued May 15 – May 26, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#COM2024-00811 Fire protection PERKINS 5B: ************ DEVELOPMENT IS PART OF THE OVERALL PERKINS REDEVELOPMENT UNDER PHASE VB ON BLOCK C AND INCLUDES ONE MULTI-FAMILY ELEVATOR BUILDING. MULTI-FAMILY BUILDING E IS LOCATED ON THE SOUTHERN PORTION OF BLOCK C, FRONTING CAROLINE AND BANK STREET. *********** SCOPE OF WORK: --------… |
| Not published |
| $23M |
#COM2024-00810 Building PERKINS PHASE 5A, BUILDING D: DEVELOPMENT INCLUDES 5 TOWNHOMES IN A SINGLE BUILDING, EACH TOWNHOME IS A 3 STORY WOOD FRAME TOWNHOME BUILDING THAT SITS ON SLAB ON GRADE. AS PER PLANS AS PER CODE. | Not published | $2M |
#COM2024-00808 Building PERKINS 5A, BUILDING B: DEVELOPMENT INCLUDES 4 TOWNHOMES IN A SINGLE BUILDING, EACH TOWNHOME IS A 3 STORY WOOD FRAME TOWNHOME BUILDING THAT SITS ON SLAB ON GRADE. AS PER PLANS AS PER CODE. | Not published | $1.7M |
#COM2024-00809 Building PERKINS 5A, BUILDING C: DEVELOPMENT INCLUDES 5 TOWNHOMES IN A SINGLE BUILDING, EACH TOWNHOME IS A 3 STORY WOOD FRAME TOWNHOME BUILDING THAT SITS ON SLAB ON GRADE. AS PER PLANS AS PER CODE. | Not published | $2M |
#COM2024-00807 Fire protection PERKINS 5A, BUILDING A: ************* PROPOSED DEVELOPMENT IS PART OF THE OVERALL PERKINS REDEVELOPMENT UNDER PHASE VA ON BLOCK C AND INCLUDES ONE MULTI-FAMILY ELEVATOR BUILDING. MULTI-FAMILY BUILDING A IS LOCATED ON THE NORTHEASTERN PORTION OF BLOCK C, FRONTING ON GOUGH STREET AND CAROLINE… | Not published | $13M |