Get Procommercial project · Baltimore, MD
Commercial General Building, Fire Protection work permitted October 1, 2025, with 4 permits through January 13, 2026, declaring $1,060,006 of work.
Baltimore Museum of Art - Amend Permit COM2024-03631: ********* Amend Permit COM2024-03631 issued on 4/2/2025 to revise design of 1392 sq ft Textile Center space shown as******** SCOPE OF WORK: --------- INTERIOR ALTERATIONS --------- - Add-alternate 1 into an open Caplan Gallery that connects to the adjacent 1886 sq ft NW Cone gallery as per plans and as per code. ********** Revisions from the original permit documents are clouded and referred to as Add-alternate 2. Add-alternate 1 was not accepted by the client. **********
Baltimore’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
4 permits issued Oct 1 – Jan 13, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#BCCM-25-001448 Fire protection BMA - PHASE 5: BFPE International has been contracted to provide a new clean agent fire suppression system for the BMA Phase 5 project located in Baltimore, MD. The system will protect the Paintings Vault, Objects Vault, AAAPI Vault and the Workroom. The systems will be a main only. Clean Agent… |
| Not published |
| $304K |
#BCCM-25-001863 Fire protection BMA - Interior Renovations Project - Phase 5: Fire Alarm and Vesda system installation - Furnish Fire Alarm System equipment & devices - Furnish VESDA System adequate for coverage area - Furnish Suppression Release Control and associated equipment - Fire Alarm shop drawings and device… | Not published | $100K |
#BCCM-25-002293 Building Baltimore Museum of Art - Amend Permit COM2024-03631: ********* Amend Permit COM2024-03631 issued on 4/2/2025 to revise design of 1392 sq ft Textile Center space shown as******** SCOPE OF WORK: --------- INTERIOR ALTERATIONS --------- - Add-alternate 1 into an open Caplan Gallery that connects to… | Not published | $616K |
#BCCM-25-001463 Building BMA PHASE 5: BFPE to modify the existing pre-action system feeding the NW cone to provide new coverage for the remodel. Additionally, on the same system, all piping feeding into the Caplan Gallery is to be replaced and modified to feed the remodel of that room as well. | Not published | $39.8K |