Issued Dec 16 · 13 permits
$25.3M
Hitachi HQ Interior alteration of Full 5 floor building
Get ProEvery project in every city · from $79/mo
Get ProMonthly permit report
By declared value.
Issued Dec 16 · 13 permits
$25.3M
Hitachi HQ Interior alteration of Full 5 floor building
Issued Dec 2 · 7 permits
$8.5M
1- CONST R-2 OCC 90342 SF Antifreeze loops: drain and properly dispose of all antifreeze within the
Issued Dec 3 · 8 permits
Source: building permit records from official city open-data portals, checked daily. Data through . How we count
$3.3M
RAVEN RIDGE CONDO BLDG # 6 10 UNITS SPR-0191-2023 10 units
Issued Dec 10 · 4 permits
$1.7M
replace existing non working HVAC units, add 2x new units. Add 3x new offices and IT room
Issued Dec 22 · 8 permits
$885K
Installation of a modular building for existing private school SPR-0040-2024
Issued Dec 18 · 4 permits
$779K
Interior renovation of existing space - II-B CONST, B OCC, 6,867 SF BUILDING IS 1 STORY MIXED OCC 2
Issued Dec 19 · 18 permits
$552K
MAIN CASE BLDNR-042723-2024-BLDNR-045935-2024 DUMPSTER ENCLOSURE; FUEL CANOPY-BLDNR-050245-2024 -Con
Issued Dec 17 · 6 permits
$542K
Remove the existing EPDM membrane and replace it with new 60mil EPDM membrane system
Issued Dec 15 · 6 permits
$496K
Spec Bay Renovation Interior Alteration of existing tenant space within multi-tenant building to pro
Issued Dec 17 · 6 permits
$492K
3860 sf B OCCC Separate existing tenant suite into two smaller suites. Demo of existing walls and a
Other months: September 2026 · August 2026 · July 2026 · June 2026 · May 2026 · April 2026