New York City commercial construction projects
62,113 commercial and multifamily projects from New York City’s building permit records (11,363 of them permitted in the last 90 days), newest first, each with its address, scope, value and permits. The contractor is named once a project’s first permit is 30 days old (first permit on or before October 8, 2026); Pro shows it, with the phone number, the day the permit is issued.
Source: building permit records from New York City's Socrata open-data portal, checked daily. Data through . How we count
Page 876 of 1243
- 66 Frankfort Street ManhattanJOB FILED HEREWITH FOR INTERIOR RENOVATION OF APT. UNIT 2G, INCL. INTERIOR NON-LOADBEARING WALLS, NEW FINISHES, AND NEW BUILT-IN MILLWORK AS PER PLANS. NO CHANGE IN USE, EGRESS,…multifamilyBuilding· Cube Builders Group Inc$112KMay 20
- 15 West 72 Street ManhattanFILING FOR INTERIOR RENOVATION OF 36TH FLOOR APT# 36B AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY.multifamilyBuilding, Plumbing· Ceko Contracting Inc$365KJun 18
- 350 First Avenue ManhattanGeneral construction for interior renovation of Apartment 14C on the 15th floor as shown on drawings filed herewith. No change in use, egress or occupancy.multifamilyBuilding, Plumbing· Super G Construction Corp$70.3KJul 1
- 900 Third Avenue ManhattanStructural modification as per plans filed herewith.commercialBuilding· Gannon Contracting LLC$60KMay 20
- 176 Broadway ManhattanINTERIOR RENOVATION OF APARTMENT 9BC INCLUDING MINOR LAYOUT MODIFICATIONS, RELOCATION OF PLUMBING FIXTURES, NEW LIGHTING, NEW FINISHES. NO CHANGE IN USE, EGRESS AND/OROCCUPANCY.multifamilyBuilding, Plumbing· Elite Home Interiors Inc$29.2KJun 16
- 511 West 143 Street ManhattanExisting multi-family house interior renovation with partition work only at partial 4th floor within apartment #46 only. No change in use, egress and certificate of occupancy.multifamilyBuilding, Plumbing· Bocaj Construction LLC$34.8KJun 25
- 401 West 24 Street ManhattanPropose to perform a interior renovation work in apt 6 on 3rd floor such as repair and replace damaged plaster, replace cosmetic work of painting and flooring. No change in the…multifamilyBuilding, Plumbing· S & Jas Builder Inc$117KAug 18
- 101 Central Park West ManhattanEXISTING APT. # 17-18G, ERECT MINOR INTERIOR PARTITIONS, NEW FINISHES. REPLACE PLUMBING FIXTURES WITH NEW. REPLACE EXISTING PTAC UNITS AND EXISTING CENTRAL AIR ZONE WITH NEW. NO…multifamilyBuilding, Plumbing· Hite Construction Inc$220KMay 21
- 55 West 13 Street ManhattanApplication filed for facade renovation. No change in use, egress or occupancy (Remove and replace sealants, remove and repair bricks, repoint brick joints)commercialBuilding· Viking Restoration Svce$600KMay 20
- 5 Lispenard Street ManhattanThis application is being filed for plumbing work at the subject premises per plans submitted herewith. No change in use, egress or occupancy in this building.multifamilyPlumbing· Clean Tech Mechanical Inc$50KMay 20
- 420 Lexington Avenue ManhattanMechanical changes as indicated on plans.commercialFire protection, HVAC / Mechanical, Plumbing· Nucor Construction Corp$219KJun 11
- 145 East 15 Street ManhattanGAS INFRASTRUCTURE REPLACEMENT IN CELLAR, AND INSTALLATION OF APPLICABLE VALVES AT ALL STOVES IN APARTMENTS. NO CHANGE IN EGRESS OR OCCUPANCY. WORK TO BE COMPLETED IN CONJUNCTION…multifamilyBuilding, Plumbing· Adriatic PLBG & HTG Corp$470KMay 22
- 65 Bleecker Street Manhattan4TH FLOOR DUCTWORK AND AIR OUTLET MODIFICATIONAND ADDITION. NEW TRANSFER DUCTWORK FOR OFFICES ARE PROVIDE OR RETURN AIR TO GETBACK TO EXISTING AIR HANDLING UNIT.commercialHVAC / Mechanical· Vanguard Construction And$30KMay 20
- 375 West End Avenue ManhattanINTERIOR RENOVATION OF 12TH FLOOR APARTMENT UNIT 12AB. PARTITION CHANGES, RELOCATE PLUMBING FIXTURES AND APPLIANCES, NEW FINISHES. NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS.multifamilyBuilding, HVAC / Mechanical, Plumbing· Lucas Construction NY Inc$315KJun 30
- 292 Madison Avenue ManhattanHerewith filing for modifications to existing mechanical systems of the 4th, 5th, and 6th floors as indicated on plans. No change in use, occupancy, or egress.commercialHVAC / Mechanical· Alba Group Inc$700KMay 20
- 292 Madison Avenue ManhattanHerewith filing for removal and installation of walls, doors, floor finishes, and ceilings of 4th, 5th, and 6th floors as indicated on plans. No change in use, occupancy, or…commercialBuilding· Alba Group Inc$2.9MMay 20
- 10 East End Avenue ManhattanInterior renovation of existing class A apartment. No change of use, egress or occupancy under this application.multifamilyBuilding· RK Design Inc$100KMay 20
- 50 West 44 Street ManhattanMISCELLANEOUS LOADING DOCK AND VAULT REPAIRS AS PER THE PLANS FILED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.commercialBuilding· Tower Services Inc$150KMay 20
- 425 Park Avenue ManhattanGENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 35TH FLOOR AND 36TH FLOOR (41ST FLOOR MARKETING AND 42ND FLOOR MARKETING) AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE,…commercialBuilding· Clune Construction Co LP$2.8MMay 20
- 148 Lafayette Street ManhattanPlumbing fixture modifications related to 8th floor tenant space office renovation.commercialPlumbing· CM Plumbing Inc$28KMay 20
- 148 Lafayette Street ManhattanMODIFICATIONS TO THE EXISTING WET, AUTOMATIC FIRE SPRINKLER SYSTEM AS REQUIRED BY CODE IN CONJUNCTION WITH THE INTERIOR TENANT RENOVATION/FIT-OUT AT THE 8TH FLOOR OFFICE SPACE.commercialFire protection· CMP Piping Inc$151KMay 20
- 224 12 Avenue ManhattanSprinkler modifications associated with Block C bathrooms on floors 3-7 as per plans filed herewith. No changes in use, egress or occupancy. Associated jobs: M01179386 M01179394.commercialFire protection· KG Sprinkler Corp$50KMay 20
- 227 West 27 Street ManhattanC Bldg. 8fl: Modification of interior finishes and ceilings as indicated on plans filed herewith. No change to use, egress or occupancy.commercialBuilding· Hellman Construction Co$50KMay 20
- 20 East 84 Street ManhattanDecommissioning of existing oil fired boiler. Installation of new heat pump heating/cooling system with associated ducts, piping and controls as shown on plans.multifamilyHVAC / Mechanical· VRF Solutions LLC$158KMay 20
- 81 Spring Street ManhattanStructural modifications for partial infill of existing stair opening.multifamilyBuilding· Structure Tone, LLC$75KMay 20
- 902 Broadway ManhattanMECHANICAL MODIFICATIONS TO 14TH AND 15TH FLOOR AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.commercialHVAC / Mechanical· Wolf Construction Corp 20$60KMay 20
- 257 Park Avenue South ManhattanINTERIOR RENOVATION OF THE 11th & 12th FLOORS APPROXIMATELY 17,133 S.F.AS PER DRAWINGS HEREIN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Firequest Corp$1.5MJun 5
- 75 9 Avenue ManhattanERECT NON-ILLUMINATED ACCESSORY BUSINESS D/F BLADE SIGN FOR MUJI.commercialSigns· Neptune Signs & Awnings—May 20
- 413 West 14 Street ManhattanMINOR INTERIOR PARTITION CHANGES AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY FILED UNDER THIS APPLICATION.commercialBuilding· Aore Operations LLC$250KMay 20
- 413 West 14 Street ManhattanINSTALLATION OF MECHANICAL EQUIPMENT WITH RELATED DUCT WORK FOR COMMERCIAL KITCHEN/EATING AND DRINKING ESTABLISHMENT INCLUDING MODIFICATION EXISTING KITCHEN RANGEHOOD VENTILATION…commercialHVAC / Mechanical· Aore Operations LLC$50KMay 20
- 2105 1 Avenue Manhattanordinary facade repairs as per plans herewith filed.multifamilyBuilding· M.C.P Restoration Corp$250KMay 20
- 53 East 77 Street ManhattanNew 1 story rear yard extension w/skylight. Remove partial facade, PH terrace, stairs, fire escape and elevator. New interior partitions, floors, egress stairs, elevator and…commercialBuilding, Elevator, Fire protection, HVAC / Mechanical, Plumbing· KG Sprinkler Corp$6.9MJun 24
- 375 Hudson Street ManhattanModifications to existing HVAC system; Removal ductwork and install new ductwork, diffusers, water cooled VRF condensing units and piping on the 10th & 13th Floor as per plans…commercialHVAC / Mechanical· Tri-Star Construction Cor$915KMay 20
- 375 Hudson Street ManhattanStructural Modifications: Structural Steel reinforcement for openings and install load bearing walls on the 10th Floor and 11th Floor framing as per plans (Harbor Picture Co -…commercialBuilding· Tri-Star Construction Cor$108KMay 20
- 375 Hudson Street ManhattanMinor interior demolition. Install new interior drywall partitions, doors, suspended ceilings, flooring and finishes on the 10th Floor as per plans (Harbor Picture Co - Office…commercialBuilding· Tri-Star Construction Cor$3.5MMay 20
- 375 Hudson Street ManhattanStructural Modifications: Infill of existing ramp, interior CMU wall reinforcement and install load bearing walls on the 1st Floor as per plans (Harbor Picture Co.) No change to…commercialBuilding· Tri-Star Construction Cor$148KMay 20
- 375 Hudson Street ManhattanMinor interior demolition. Install new interior drywall partitions, doors, suspended ceilings, flooring and finishes on the 1st Floor as per plans (Harbor Picture Co.) No change…commercialBuilding· Tri-Star Construction Cor$1.3MMay 20
- 150 5 Avenue ManhattanStructural modifications to take place First floor and Cellar as per drawings filed herewith. No change in use, egress, or occupancy.commercialBuilding· Malatesta Paladino, Inc$4MMay 20
- 41 Union Square West ManhattanInstallation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.commercialBuilding· Colgate Restoration Corp—May 20
- 478 West 130 Street ManhattanPropose removal of existing remnant foundations and retaining wall ; SOE work for new footings, caissons, and mat slab for a 9-STORY building filed in conjunction with NB #…commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Archstone Builders LLC—Jan 26
- 40 West 23 Street ManhattanGeneral construction work to include demolition of existing atrium skylight and partial re-building of East and South walls above 5th floor roof and 7th floor parapet. A new…commercialBuilding, Fire protection, HVAC / Mechanical· Aggressive Fire Prot LLC$825KJun 27
- 142 Fifth Avenue ManhattanRENOVATIONS TO APT. 9 INCLUDING PARTITION WORK, DOORS, BATHROOM EXHAUST CONNECTIONS, CABINETRY, LIGHTING, FINISHES. PLUMBING UNDER SUBSEQUENT APPLICATION. NO CHANGE TO USE,…commercialBuilding, Plumbing· SMD Construction Group In$225KOct 29
- 140 Cabrini Boulevard ManhattanThis application is filed for the Architectural scope associated with the apt.78 interior renovation. No change in use, egress, or occupancy.multifamilyBuilding· SMD Construction Group In$97.5KMay 20
- 118 Avenue D ManhattanCONCRETE REPAIRS IN CELLARmultifamilyBuilding· Jemco Electrical Cont Inc$105KMay 20
- 465 East 10 Street ManhattanCONCRETE REPAIRS IN CELLARmultifamilyBuilding· Jemco Electrical Cont Inc$144KMay 20
- 170 Avenue D ManhattanCONCRETE REPAIRS IN CELLARmultifamilyBuilding· Jemco Electrical Cont Inc$60KMay 20
- 118 Avenue D ManhattanCONCRETE REPAIRS IN CRAWL SPACEmultifamilyBuilding· Jemco Electrical Cont Inc$128KMay 20
- 465 East 10 Street ManhattanCONCRETE REPAIRS IN CELLARmultifamilyBuilding· Jemco Electrical Cont Inc$535KMay 20
- 170 Avenue D ManhattanPATCHING AND REPAIRING CONCRETE ELEMENTS IN CELLARmultifamilyBuilding· Jemco Electrical Cont Inc$84.7KMay 20
- 93 Nagle Avenue ManhattanDrinking FountainscommercialBuilding, Plumbing· Empire Control Abatement$35.2KJun 3