New York City commercial construction projects
62,113 commercial and multifamily projects from New York City’s building permit records (11,363 of them permitted in the last 90 days), newest first, each with its address, scope, value and permits. The contractor is named once a project’s first permit is 30 days old (first permit on or before October 8, 2026); Pro shows it, with the phone number, the day the permit is issued.
Source: building permit records from New York City's Socrata open-data portal, checked daily. Data through . How we count
Page 873 of 1243
- 575 Park Avenue ManhattanInstallation of suspended scaffold for facade work or inspection. Amend #1 change in tieback and lifeline and added outrigger beam detailmultifamily· Preserv Bldng RST Mngmt I—May 21
- 2300 Frederick Douglas Boulevard ManhattanSUSPENDED SCAFFOLD FOR FACADE RESTORATION AS SHOWN ON PLANSmultifamily· M & L Signs, Inc—May 21
- 630 West 160 Street ManhattanInstallation of suspended scaffold for facade work or inspection. AMEND #1 ADDED CHOOK OPTIONScommercial· Dna Contracting LLC—May 21
- 133 Greenwich Street ManhattanInstallation of suspended scaffold for facade work or inspection.commercial· Skyline Restoration Inc—May 21
- 325 Lafayette Street ManhattanFiling for installation of new plumbing and sprinkler systems for commercial bakery. No change in use, egress, or occupancy.multifamilyFire protection, Plumbing· Cobot Plumbing And Heatin$50KMay 21
- 400 East 51 Street ManhattanAPARTMENT RENOVATION AND INSTALLATION OF NEW FINISHES (20TH FLOOR, APT. 20C). NO CHANGE IN USE, EGRESS, OR OCCUPANCY.multifamilyBuilding, Plumbing· Pepaj Construction Corp$73KJun 2
- 313 5 Avenue ManhattanPropose interior demolition of existing commercial and office building as per plan. No change in use, egress, or occupancy.commercialBuilding· Nan Tong Jin Yi Construct$50KMay 21
- 840 Broadway ManhattanInstallation of suspended scaffold for facade work and/or inspection. Amend #1, added anchor to wall tiebackmultifamily· Lawrence Exterior Rest Co—May 21
- 201 West 16 Street Manhattaninterior renovation of apt 10g, no change of use , egress or occupancymultifamilyBuilding· Structural Preservation$33.4KMay 21
- 579 West 204 Street ManhattanEXTERIOR REPAIRS: REPOINT DETERIORATED MORTAR JOINTS, REPLACE DETERIORATED BRICK, REPAIR PRECAST CONCRETE WINDOWSILLS, REPLACE LINTELS, AND REPAIR EXTERIOR COATING AS PER…multifamilyBuilding· New Pace Contracting Corp$51KMay 21
- 150 West 30 Street ManhattanAPPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 16TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR…commercialBuilding· Brace Construction LLC$210KMay 21
- 415 10 Avenue ManhattanINTERIOR RENOVATION TO FIT OUT AN OFFICE SPACE AS PER PLANS FILED HEREWITH. NO CHANGEIN USE, EGRESS OR OCCUPANCY.commercialBuilding, HVAC / Mechanical, Plumbing· Cross Management Corp$400KMay 27
- 545 West 158 Street ManhattanREPLACE OIL BURNER WITH GAS/OIL BURNER ON EXISITNG BOILER. CHANGE GRADE OF FUEL OIL FROM #4 TO #2.multifamilyBuilding, HVAC / Mechanical, Plumbing· E.K. Combustion LLC$134KJul 14
- 111 Varick Street ManhattanHEREWITH FILING ARCHITECTURAL WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCYmultifamilyBuilding, Fire protection, Plumbing· Global Design Concept Cor$55KMay 30
- 601 Lexington Avenue ManhattanINTERIOR DEMO OF TENANT 53RD FLOOR INCLUDING NON-LOAD BEARING PARTITIONS, INTERIOR FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCYcommercialBuilding· JT Magen & Company Inc$200KMay 21
- 142 East 16 Street ManhattanINTERIOR RENOVATION IN APT 5D FILED IN CONJUNCTION WITH DOB NOW PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.multifamilyBuilding, Plumbing· Bura Construction Corp$103KJun 27
- 595 West 207 Street ManhattanREPLACE OIL BURNER WITH GAS/OIL BURNER ON EXISITNG BOILER. CHANGE GRADE OF FUEL OIL FROM #4 TO #2.multifamilyBuilding, HVAC / Mechanical, Plumbing· E.K. Combustion LLC$172KJul 21
- 114 5 Avenue ManhattanPlumbing modifications to take place on the 8th floor as per drawings filed herewith. No change in use, egress, or occupancy.commercialPlumbing· Par Plumbing Co., Inc$38KMay 21
- 114 5 Avenue ManhattanMechanical modifications to take place on the 17th Construction floor as per plans filed herewith. No change in use, egress, or occupancy. (Listed as 18th Marketing Floor)commercialHVAC / Mechanical· Structure Tone, LLC$35KMay 21
- 114 5 Avenue ManhattanGeneral Construction to take place on the 17th Construction floor as per plans filed herewith. No change in use, egress, or occupancy. (Listed as 18th Marketing floor)commercialBuilding· Structure Tone, LLC$390KMay 21
- 295 Madison Avenue ManhattanTo file PL plumbing work in conjunction with DOB Now Build application job#M01205854. No change in use, egress or occupancy under this application.commercialPlumbing· Headquarters Mech Inc$36KMay 21
- 1211 Avenue Of Americas ManhattanInstallation of new sprinkler heads and 1 relocated fire hose cabinet. No change in use, egress, or occupancy. .commercialFire protection· Abco-Peerless Sprklr Corp$60KMay 21
- 17 Eldridge Street ManhattanINTERIOR RENOVATION OF APT #1 AT 1ST FLOOR AND APT #6 AT 2ND FLOOR. MERGE TWO APARTMENTS AT 1ST FLOOR TO ONE APARTMENT (APT #1). NO CHANGE IN USE, EGRESS, AND OCCUPANCY.multifamilyBuilding, Plumbing· XH&RC Plumbing Heating$150KMay 22
- 7 West 57 Street ManhattanNew installation and modifications to plumbing, sprinkler systems & standpipe systems as per plans filed herewith. Filed in conjunction with DOB now jobs M01198079, M01200476,…multifamilyFire protection, Plumbing· Bedrock PLBG. & HTG., Inc$128KJun 3
- 1251 6 Avenue ManhattanMechanical modifications as per plans filed herewith. No change to use, bulk, egress, or occupancy is proposed.commercialHVAC / Mechanical· JT Magen & Company Inc$1.5MMay 21
- 176 East 71 Street ManhattanRenovation of an existing apartment#3C on the third floor.multifamilyHVAC / Mechanical, Plumbing· BH Design Group LLC$240KJun 5
- 218 First Avenue ManhattanMinor Renovation to existing Commercial Space as per drawings filed. No change in use or egress.multifamilyBuilding, Plumbing· Executive NYC Constr Inc$35.8KMay 30
- 160 Riverside Drive ManhattanINTERIOR RENOVATION OF APARTMENT 2B ON THE 2ND FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.multifamilyBuilding, Plumbing· SJB Interiors Inc$243KJun 10
- 9 West 57 Street ManhattanSPRINKLER MODIFICATIONS TAKING PLACE ON 45TH FL CONSTRUCTION (46TH FL MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.commercialFire protection· Soh Par Sprinkler LLC$50KMay 21
- 9 West 57 Street ManhattanMECHANICAL MODIFICATIONS TAKING PLACE ON 45TH FL CONSTRUCTION (46TH FL MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.commercialHVAC / Mechanical· Structure Tone, LLC$335KMay 21
- 9 West 57 Street ManhattanGENERAL CONSTRUCTION TAKING PLACE ON 45TH FL CONSTRUCTION (46TH MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.commercialBuilding· Structure Tone, LLC$1.2MMay 21
- 322 8 Avenue ManhattanPropose installation of (5) new multizone heat pump units and (1) air cooled packaged unit. No change to use, egress or occupancy.commercialHVAC / Mechanical· North Star Air Condition$78KMay 21
- 725 Broadway ManhattanHEREWITH FILING FOR INTERIOR PARTITIONS AND DOORS MODIFICATION AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.commercialBuilding· Bern Companies Inc$40KMay 21
- 100 Park Avenue ManhattanInterior demo & reno of non-load bearing partitions, walls, ceiling & finishes as indicated on plans.commercialBuilding· James E Fitzgerald Inc$225KMay 21
- 20 Hudson Yards ManhattanFiling herewith for Interior renovation, removal, and construction of non-load-bearing partitions, floor, ceilings, and doors as per plans.commercialBuilding, Fire protection, HVAC / Mechanical· Michilli Inc$403KMay 29
- 46 Lispenard Street ManhattanInterior renovation of apartment #3E. Modification to kitchen and bathroom fixtures and appliances. No change in use, egress or occupancy. In association with GC application…multifamilyPlumbing· Smart PLBG & HTG Corp$36KMay 21
- 150 East 18 Street ManhattanRenovation of an existing building at 12th floor apt 12G. No change in use, egress or occupancy under this application.multifamilyBuilding· Segundo S. Palchizaca$28.5KMay 21
- 425 Park Avenue ManhattanStructural modifications taking place on the 35th and 36th floor (41st and 42nd floor marketing) as per drawings filed herewith. No change in use, egress or occupancy.commercialBuilding· Clune Construction Co LP$600KMay 21
- 425 Park Avenue ManhattanMechanical modifications taking place on the 35th and 36th floor (41st and 42nd floor marketing) as per drawings filed herewith. No change in use, egress or occupancy.commercialHVAC / Mechanical· Clune Construction Co LP$867KMay 21
- 1 Pier 57 ManhattanCorridor niche renovations to create additional phone rooms on 2nd and 4th floor. No change to use, egress, or occupancy.commercialBuilding· Structure Tone, LLC$1.6MMay 21
- 205 West End Avenue ManhattanRenovation and combination of apartments 27M/N and 27P. Plumbing filed under subsequent filing M01173519-S1. No change to use. egress, or occupancy. Also filing to superseding…multifamilyBuilding, Plumbing· Big Apple Painting And C$150KJun 5
- 15 Charles Street ManhattanRENOVATIONS TO APT 5C AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCYmultifamilyBuilding, Plumbing· JGR Group Inc$183KMay 21
- 1065 Park Avenue ManhattanFacade repairs as per plans, no change to use, egress, or occupancy.multifamilyBuilding· K.E.S Construction Co Inc$110KMay 21
- 67 Park Avenue ManhattanINTERIOR RENOVATION OF AN EXISTING APARTMENT, INCLUDING PARTITION CHANGES AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.multifamilyBuilding· CPM Builders Inc$151KMay 21
- 248 West 35 Street ManhattanCONVERSION OF AN EXIST. COMMERCIAL FLOOR( 16TH. FLOOR) TO RESIDENTIAL USE AS PER ARTICLE 7B OF MDL.commercialBuilding, Plumbing· K&M Management Service In$280KJun 12
- 106 Mott Street ManhattanLift Legalization as per plans filed herewith. There is no change in use, egress or occupancy.multifamilyBuilding· Thomas Maintenance Inc—May 21
- 799 Park Avenue ManhattanMechanical work filed in conjunction with the renovation of an existing dwelling unit as per plans. No change of use, occupancy or egress.multifamilyHVAC / Mechanical· Force Construction LLC$50KMay 21
- 1122 Madison Avenue ManhattanEQUIPMENT USE: DUAL #7000 # CAPACITY PERSONNEL HOIST DURING NB CONST, FILED SEP. HOIST SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS…multifamilyHVAC / Mechanical· Rockledge Scaffold Corp$30KJul 28
- 333 East 34 Street ManhattanPROPOSED LOBBY RENOVATION AS PER PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.multifamilyBuilding· Bruci Construction Servic$450KMay 21
- 219 East 42 Street ManhattanApplication filed for the conversion and enlargement of existing building.multifamilyBuilding, Fire protection, HVAC / Mechanical, Plumbing· Rael Automatic SPR.Co Inc$107MJun 16