New York City commercial construction projects
62,113 commercial and multifamily projects from New York City’s building permit records (11,363 of them permitted in the last 90 days), newest first, each with its address, scope, value and permits. The contractor is named once a project’s first permit is 30 days old (first permit on or before October 8, 2026); Pro shows it, with the phone number, the day the permit is issued.
Source: building permit records from New York City's Socrata open-data portal, checked daily. Data through . How we count
Page 595 of 1243
- 71-14 Austin Street QueensTENANT BUILD OUT FOR A NEW FINE/FAST-CASUAL RESTAURANT WITH DINE-IN AND TAKE-AWAY SERVICES INCLUDING DEMOLITION AND GENERAL CONSTRUCTION WORK OF INTERIOR WALLS AND FINISHES. NO…commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Cooper Works Inc$1MDec 8
- 4 Dartmouth Street QueensSuspended Scaffolding for Facade Restoration as Shown on Plansmultifamily· SPD Construction Corp—Oct 29
- 30-61 Steinway Street QueensINTERIOR RENOVATION FOR A PROPOSED BUBBLE TEA CAFEcommercialBuilding, Plumbing· K-Lash Construction Corp$205KNov 3
- 131-07 40 Road QueensTENANT FIT OUT OF 79,695 SQ FT WITHIN THE SHOPS AT SKYVIEW SHOPPING CENTER WHICH WILL INCLUDE BOWING, REDEMPTION 08-08-25 AV-191 1ST FLOOR CABLE TRAY PLANARCADE, BILLIARDS, PING…multifamilyBuilding, Fire protection, HVAC / Mechanical, Plumbing· Twin Shores Management$16MApr 10
- 33-11 72 Street QueensLEGALIZATION OF FULL DEMOLITION PERFORMED BEFORE 2004 FOR 33-11 72ND ST. THIS BUILDING WAS DEMOLISHED & THE LOT WAS INCLUDED WITH NB CONSTRUCTION UNDER 72-06 NORTHERN BLVD.commercialDemolition· Record Group Inc—Oct 29
- 127-11 Farmers Boulevard QueensInstallation of a new dedicated fire sprinkler water main; replacement and relocation of an existing electric water heater.commercialPlumbing· Par Plumbing Co., Inc$26KOct 29
- 32-33 48 Street QueensFILING FOR REMOVAL AND REPAIR FOR MINOR FIRE, SMOKE AND WATER DAMAGE FROM CELLAR THROUGH 3RD FLOOR AND ROOF OF EXISTING 3 STORY MULTIPLE DWELLING. NO CHANGE TO LAYOUTS,…multifamilyBuilding· 4 Corners Constr Group LL$547KOct 29
- 45-25 Parsons Boulevard QueensINTERIOR RENOVATION IN THE CELLAR AND 1ST FLOOR AS PER THE PLANS FILED HEREWITH. CORRECT ECB VIOLATIONS 39147750Z & 39147751K. NO CHANGE THE USE, EGRESS AND OCCUPANCY.multifamilyBuilding, Plumbing· MPS Plumbing & Heating In$80.6KNov 21
- 260-25 74 Avenue QueensFILING HEREWITH PLANS AND APPLICATION TO PROVIDE EXTENSION OF APP. 196 SQ.FT, FOR SUNROOM AND TOILET ON FIRST FLOOR OF 260-25 74 AVENUE, NO CHANGE IN USE, EGRESS OR OCCUPANCY…multifamilyBuilding, Plumbing· Custombuilt Homes Inc$70KOct 31
- 146-29 South Road QueensREPLACE PLUMBING FIXTURE.multifamilyPlumbing· Infiniti Esc Plumbing Cor$63KOct 29
- 135 West 29 Street ManhattanINTERIOR RENOVATION OF A COMMERCIAL SPACE IN CONJUNCTION WITH ALTCO #M00948674. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.commercialBuilding· Beautiful Consulting$59.3KOct 29
- 220 West 19 Street ManhattanInstallation of new full & partial-height gypsum wall board partitions, pantry millwork & appliances, relocated glass walls & relocation of existing light fixture to facilitate…commercialBuilding· Danna Brothers Contractor$31KOct 29
- 280 Mulberry Street ManhattanTHE PURPOSE OF THIS PROJECT IS TO PROVIDE TEMPORARY SHORING FOR LEANING RETAINING WALL. NO CHANGE TO EGRESS, OCCUPANCY OR USE.multifamilyBuilding· HSK Construction Corp$50KOct 29
- 250 West 57 Street ManhattanMechanical modifications taking place on the 12-14th floor as per plans filed herewith. No change in use, egress or occupancycommercialHVAC / Mechanical· Structure Tone, LLC$50KOct 29
- 29 East 124 Street ManhattanFISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decolamultifamily· Structual Presv System—Oct 29
- 100 East End Avenue ManhattanApplication for the installation and use of suspended scaffold and material hoist as per plans filed herein. No change in egress, use, or occupancy.commercial· Skytrac Access Group LLC—Oct 29
- 27 West 23 Street ManhattanGeneral construction modifications taking place on the 5th & 6th floor as per plans filed herewith. No change in use, egress or occupancycommercialBuilding· Benchmark Builders LLC$219KOct 29
- 30 Rockefeller Plaza ManhattanRestore floor construction at the 26' Floor after removal of 25' fl. communicating stair.commercialBuilding· Coyle Contracting Corp$25KOct 29
- 573 West 207 Street ManhattanNO CHANGES TO USE, EGRESS, OR OCCUPANCY. PROPOSED IS INTERIOR RENOVATION OF EXISTING RETAIL STORE AT 1ST FLOOR: PARTITIONS FINISHES, CEILING AND LIGHTS IN PART OF THE BUILDING AS…multifamilyBuilding· Kostyantyn Garkusha$41.9KOct 29
- 1827 1 Avenue ManhattanSURFACE PREP AND PATCHING OF EXISTING CONCRETE FLOOR SLAB AND UNDERSIDE OF EXISTING PRECAST CONCRETE ROOF PLANKS, CRACK REPAIRS AT EXISTING CONCRETE MASONRY WALLS. NO CHANGE IN…commercialBuilding· A.G.S Improvements Inc$309KOct 29
- 350 Hudson Street ManhattanMinor interior demo. Installation of new interior partitions, doors, suspended ceilings, flooring, millwork and finishes on the 1st Floor retail space as per plans (Tenant Work -…commercialBuilding· Creative Installations In$179KOct 29
- 1700 Broadway ManhattanHEREWITH FILING FOR INTERIOR MS DEMO WORK AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Quest Builders Group Inc$60.5KOct 31
- 24 West 25 Street ManhattanGeneral construction modifications to the 7th & 10th floor as per plans filed herewith. No change in use, egress or occupancy.commercialBuilding· Dycon Enterprises Inc$225KOct 29
- 24 West 25 Street ManhattanMechanical modifications to the 7th and 10th floor as per plans filed herewith. No change in use, egress, or occupancy.commercialHVAC / Mechanical· Dycon Enterprises Inc$33KOct 29
- 10 Post Avenue ManhattanSuspended Scaffold for Facade Restoration as shown on Plansmultifamily· Safetech Enterprises Corp—Oct 29
- 235 West 102 Street ManhattanJob filed to show renovation to Apt 9T on 9th floor as per plans filed herewith. No change in use, egress and occupancy.multifamilyBuilding, Plumbing· O&L Expert Contracting In$48.5KNov 5
- 45 Rockefeller Plaza ManhattanAPPLICATION FILED FOR INTERIOR REMOVAL OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 23RD FLOOR (SUITE 2310 & 2325) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE,…commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Core Four Construction In$125KNov 14
- 146 West 57 Street ManhattanINTERIOR RENOVATION OF APT. 60D INCLUDING GENERAL CONSTRUCTION, REMOVAL AND INSTALLATION OF NON-LOAD BEARING PARTITIONS.multifamilyBuilding· Uberto, LTD$120KOct 29
- 10 Bond Street ManhattanInterior courtyard renovation as part of the 1st floor apartment. No change in use, egress or occupancy. All as per plans and applications.multifamilyBuilding· JC Consulting & Manageme$174KOct 29
- 245 Park Avenue ManhattanMinor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 36th & 40th floors (Ares- Buildout Phase) as per plans. No change to use,…commercialBuilding· JT Magen & Company Inc$19.6MOct 29
- 144 West 80 Street ManhattanDEFERRED MAINTENANCE OF THE EXISTING DWELLING UNITS INCLUDING NEW FLOOR & WALL FINISHES AS PER THE DRAWINGS FILED HEREIN. NO CHANGE IN THE USE, OCCUPANCY OR EGRESS UNDER THIS…multifamilyBuilding· Volk Industrial Services$472KSep 17
- 240 East 35 Street ManhattanGARAGE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.multifamilyBuilding· JRR Contracting Inc$126KOct 29
- 1900 Broadway ManhattanMechanical systems filing related to associated ducts and piping. There is no change in occupancy, use or egress.multifamilyHVAC / Mechanical· Structure Tone, LLC$130KOct 29
- 3 Bryant Park ManhattanRemove (32) sprinkler heads, Install (33) new sprinkler heads, Relocate (1) sprinkler head and (1) FHC and associated SP/SD piping on the 3rd Floor; Relocate (2) sprinkler heads…commercialFire protection· Preferred Spklr And Mech$42.3KOct 29
- 1245 Broadway ManhattanInterior Renovation of the 4th floor, No change in use , egress or occupancy.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Triton Construction Co.,$1.4MDec 2
- 31 West 27 Street ManhattanMechanical modifications taking place on 11th floor as per plans filed herewith. No change in use, egress or occupancy.commercialHVAC / Mechanical· Trademark Services LLC$230KOct 29
- 536 East 5 Street ManhattanHEREWITH FILE TO RENOVATE EAT-IN & TO-GO STORE. WORK INCLUDES NEW NON-LOAD BEARING WALL, NEW PLUMBING FIXTURES, NEW FLOOR COVERING, GENERAL CONSTRUCTION. NEW EXHAUST SYSTEM FOR…multifamilyHVAC / Mechanical, Plumbing· CK Plumbing & Mech Inc$165KDec 8
- 200 Park Avenue ManhattanHEREBY FILING INTERIOR FITOUT RENOVATION, INCLUDING INSTALLATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES FOR LOBBY AMENITY SPACE AS SHOWN ON PLANS FILEDHEREWITH.…commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Abco-Peerless Sprklr Corp$4.1MOct 29
- 200 Park Avenue ManhattanHereby filing removal of restroom and Installation of interior non-load bearing partitions, doors, ceilings, and related finishes as per plans filed herewith for 7FL. No change…commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Par Fire Protection LLC$2.6MOct 30
- 76 Crosby Street ManhattanINTERIOR RENOVATIONS OF APT. 29 AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCYmultifamilyBuilding· Coleman Contracting Corp$255KOct 29
- 30 Orchard Street ManhattanLIMITED EXTERIOR REPAIRS AS INDICATED ON PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.multifamilyBuilding· Ajp Contracting Corp$40KOct 29
- 88 Lexington Avenue ManhattanInterior renovation to apartment 402. New floor and ceiling finishes, doors, interior partition and cabinets, tile.multifamilyBuilding· Emprise Construction Inc$40KOct 29
- 635 Madison Avenue ManhattanHEREBY FILING FOR THE INSTALLATION OF MECHANICAL EQUIPMENT. NO CHANGE TO USE OCCUPANCY OR EGRESS.commercialHVAC / Mechanical· Art + 1, Inc$100KOct 29
- 601 Lexington Avenue ManhattanDemolition of existing ductwork, VAVs, AC units, air outlets, and piping on the 45th floor except where noted. Full fit out of the floor with new VAVs, AC units, ductwork, air…commercialHVAC / Mechanical· JT Magen & Company Inc$3MOct 29
- 114 5 Avenue ManhattanMechanical modifications to take place on the 13th & 14th Construction Floor (Listed as 14th & 15th Marketing floor) as per plans filed herewith. No change in use, egress, or…commercialHVAC / Mechanical· Structure Tone, LLC$455KOct 29
- 271 First Avenue ManhattanPROPOSED RENOVATION OF AN EXISTING COMMERCIAL SPACE FOR AN EATING & DRINKING ESTABLISHMENT AT THE FIRST FLOOR LEVEL. NO CHANGE IN USE, EGRESS AND OCCUPANCY.multifamilyBuilding, Plumbing· Safepipe Plumbing Inc$176KOct 29
- 595 Madison Avenue ManhattanPlumbing work on part of the 18th floor (Tom Ford) as indicated on drawings.commercialPlumbing· S.B.A. Plumbing Corp$26KOct 29
- 900 Third Avenue ManhattanModification to mechanical system as per plans filed herewith.commercialHVAC / Mechanical· Henick-Lane Service Corp$404KOct 29
- 130 West 25 Street Manhattanminor renovation for partial first floor. install new door, flooring, painting and finishes. plumbing work to be filed under separate application. new lighting install at…commercialBuilding, Plumbing· Vici Interiors Inc$82.8KNov 13
- 1185 Avenue Of The Americas ManhattanModifications to the existing HVAC system and associated ducts and piping on the 19th & 20th Floors interior office renovation (Lockton) as per plans. No change to use, egress or…commercialHVAC / Mechanical· Americon Construction Inc$132KOct 29