New York City commercial construction projects
62,207 commercial and multifamily projects from New York City’s building permit records (11,501 of them permitted in the last 90 days), newest first, each with its address, scope, value and permits. The contractor is named once a project’s first permit is 30 days old (first permit on or before October 9, 2026); Pro shows it, with the phone number, the day the permit is issued.
Source: building permit records from New York City's Socrata open-data portal, checked daily. Data through . How we count
Page 374 of 1245
- 2400 Marion Avenue BronxRenovation of Auditorium on First Floor. Replace existing seating, flooring and selective painting. Signage on Basement, First and Second Floors.commercialBuilding, Plumbing· Spencer Contracting, LLC$594KMar 26
- 2300 Southern Boulevard BronxDEMOLISH EXISTING SPLIT UNIT, AND PROVIDE NEW VRF STSTEM TO EXISTING OFFICE SPACE.commercialHVAC / Mechanical· Lane Refrigeration Co.,In$379KMar 25
- 150 Nelson Avenue Staten IslandAPPLICATION IS FILED FOR THE MECHANICAL WORK AT ROOF OF EXISTING SCHOOL, TO REPLACE FOUR ROOF TOP UNITS AND ONE CONDENSER UNIT AT ROOF. ALL WORK AS PER PLANS SUBMITTED HEREWITH.…commercialHVAC / Mechanical· Eddy's General Construct$48KMar 25
- 136-17 39 Avenue QueensProposed work for Citizens - Relocate (20), Remove (22) and install new (20) sprinkler heads for commercial tenant fit-out. All Work as per plans.commercialFire protection· Soh Par Sprinkler LLC$29.6KMar 25
- 35-24 78 Street QueensFILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION.multifamily· Tribute Restoration Inc—Mar 25
- 77-12 35 Avenue QueensFILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION.multifamily· Tribute Restoration Inc—Mar 25
- 35-25 77 Street QueensFILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION.multifamily· Tribute Restoration Inc—Mar 25
- 36-21 Prince Street QueensPROPOSED INTERIOR RENOVATION ON CELLAR, 1ST FLOOR & 2ND FLOOR. CEILING, FLOORING, PARTITION WORKS AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.commercialBuilding· Winway Development LLC$100KMar 25
- 108-25 Horace Harding Expressway QueensSuspended Scaffold for Facade Restoration as Shown on Planscommercial· KNS BLDG Restoration Inc—Mar 25
- 160-13 Northern Boulevard QueensMINOR INTERIOR RENOVATION FOR EXISTING STORE ON CELLAR. NO CHANGE IN USE, OCCUPANCY AND EGRESS UNDER THIS APPLICATION.commercialBuilding· C Plus Design Group Inc$56.5KMar 25
- 23-70 Waters Edge Drive QueensCHUTE INSTALLATION FOR DEBRIS REMOVALS.commercialHVAC / Mechanical· PJP Installers Inc$30KMar 25
- 68-20 Rockaway Beach Boulevard QueensRENOVATION OF EXT'G DUNKIN'/BASKIN ROBINS STORE. REPLACE EXT'G FLOOR, CL'G, & WALL FINISHES AS NEEDED. UPDATE LIT'G FIX'T W/ NEW AS NEEDED. INSTALL NEW MILLWORK AS NEEDED. NO…commercialBuilding· Btu Delta Construction$115KMar 25
- 35-59 11 Street QueensINTERIOR RENOVATION OF EXIST. 1-STORY GARAGE. WORK ONLY AT CELLAR, 1ST FLOOR.multifamilyBuilding· Jaya Contracting Inc$91KMar 25
- 99-01 Queens Boulevard QueensFILING HEREWITH AN ALTERATION 1 APPLICATION TO REVISE SCHEDULE OF OCCUPANCY.commercialBuilding· Sema Contracting LLC$1.1MMar 25
- 788 Riverside Drive ManhattanINITIAL ROPE ACCESS CD5 FISP. INSPECTIONmultifamily· Sato Construction Co. Inc—Mar 25
- 45 Broadway ManhattanRELOCATE AND PROVIDE NEW SPRINKLER HEADS ON EXISTING SYSTEM IN EXISTING OFFICE SPACE ON 12 FL IN CONJUNCTION WITH ALT #M01360220 AS PER PLANS FILED NO CHANGE IN USE OCCUPANCY OR…commercialFire protection· Firequest Corp$114KMar 25
- 360 East 4 Street ManhattanINSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENTmultifamily· Central Construction MGMT—Mar 25
- 182 East 86 Street ManhattanINTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE INVOLVED IN PLUMBING & GENERAL CONSTRUTION WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY & EGRESS.multifamilyBuilding, Plumbing· Kale Construction Inc$57.9KMar 25
- 400 East 84 Street ManhattanRENOVATION TO EXISTING UNITS 28A, 29A, 30A, 35A, 36A, 40A, 40B AS PER PLANS FILED HEREWITH. ALL ENERGY CALCULATIONS FOR LIGHTING FILED UNDER M01092673-I1. NO CHANGE TO USE,…multifamilyBuilding, HVAC / Mechanical, Plumbing· Keystone Builders Group$350KMay 15
- 50 East 72 Street ManhattanInstallation of suspended scaffold for facade work or inspection.multifamily· Preserv Building Restorat—Mar 25
- 210 West 19 Street ManhattanERIOR RENOVATION OF UNIT 2E INCLUDING REMOVAL OF NON-LOAD-BEARING INTERIOR PARTITIONS IN THE KITCHEN AREA AND INSTALLATION OF NEW STEPS LEADING TO THE SUNKEN LIVING ROOM,…multifamilyHVAC / Mechanical· E-Group Inc$33.3KMar 25
- 287 Park Avenue South ManhattanMECHANICAL MODIFICATIONS TO INCULDE INTERIOR RENOVATION ON THE 8TH FLOOR, AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.commercialHVAC / Mechanical· Icon Interiors Inc$334KMar 25
- 220 West 19 Street ManhattanAPPLICATION IS FILED FOR INTERIOR DEMOLITION ANDRENOVATION IN CELLAR THAT DOESN'T AFFECT USE, EGRESS OROCCUPANCY OF THE SPACE, AND THEREFORE, NO NEW OR AMENDEDCERTIFICATE OF…commercialBuilding· Heavy Duty Builders LLC$84.4KMar 25
- 287 Park Avenue South ManhattanGENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 8TH,9TH FLOORS AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.commercialBuilding· Icon Interiors Inc$2.6MMar 25
- 240 West 35 Street ManhattanMinor partition and lighting work in suite 301. No change to use, egress or occupancy.commercialBuilding· DK Construction One, Corp$101KMar 25
- 199 Water Street ManhattanPlumbing work for lobby renovationcommercialPlumbing· Real Plumbing Corp$48KMar 25
- 256 West 38 Street ManhattanInstallation of suspended scaffold for facade work and/or inspection. Amend #1, change in tieback and added outrigger beam detailcommercial· Atlas Constr Of NY , Inc—Mar 25
- 599 Lexington Avenue ManhattanRemoval and instillation of interior non load bearing partitions and related finishes of existing business offices. No change in use, egress or occupancy.commercialBuilding· Structure Tone, LLC$1.6MMar 25
- 510 Madison Avenue ManhattanRemoval and construction of interior partitions, doors and ceilings as shown on drawings. No change in use, egress or occupancy.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Icon Interiors Inc$6.7MApr 3
- 909 Third Avenue ManhattanInterior demolition of non load bearing partitions on the 17th floor as indicated on drawings.commercialBuilding· Clune Construction Co LP$275KMar 25
- 412 West 15 Street ManhattanILLUMINATED NON-ADVERTISING DOUBLE-FACE PROJECTING ACCESSORY SIGN - STK STEAKHOUSE. NO CHANGE OF USE, EGRESS OR OCCUPANCY.commercialSigns· National Sign & Lighting—Mar 25
- 1301 Avenue Of The Americas ManhattanModifications to the existing HVAC system on the the 34th floor as per plans. No changes to Use, Egress, or occupancy.commercialHVAC / Mechanical· JT Magen & Company Inc$1.3MMar 25
- 1540 Broadway ManhattanConstruction modifications taking place on the 6th floor (8th floor Marketing) as indicated on the drawings.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· BSM Maintenance Corp$79.3KMar 26
- 420 5 Avenue ManhattanSuspended Scaffold for Facade Restoration as Shown on Planscommercial· M & L Signs, Inc—Mar 25
- 435 Hudson Street ManhattanMinor interior construction, patching and repair of finishes in tenant spaces on the Cellar-9th and Roof as per plans (Hines Fire Alarm System Upgrade.) No change to use, egress…commercialBuilding· Clune Construction Co LP$400KMar 25
- 66 Hudson Boulevard ManhattanHereby filing to construct interior partitions, ceilings and doors for for lobby fit out as shown on plans filed herewith. No change to use, occupancy or egress.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· JRM Construction MGMT LLC$814KSep 14
- 180 West End Avenue ManhattanINTERIOR RENOVATION OF APARTMENT 29A. INCLUDING MINORLAYOUT MODIFICATIONS, REPLACE OF PLUMBING FIXTURES, NEWELECTRICAL WORK, NEW LIGHTING, NEW FINISHES. NO CHANGE INUSE, EGRESS…multifamilyBuilding, Plumbing· Budget PLBG & HTG LLC$213KMar 26
- 66 Hudson Boulevard ManhattanHereby filing to construct interior partitions, ceilings and doors for for office fit out as shown on plans filed herewith. No change to use, occupancy or egress.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· JRM Construction MGMT LLC$13.2MSep 11
- 66 Hudson Boulevard ManhattanHereby filing to construct interior partitions, ceilings and doors for for office fit out as shown on plans filed herewith. No change to use, occupancy or egress.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· JRM Construction MGMT LLC$13MJul 17
- 66 Hudson Boulevard ManhattanHereby filing to construct interior partitions, ceilings and doors for for office fit out as shown on plans filed herewith. No change to use, occupancy or egress.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· JRM Construction MGMT LLC$20MSep 10
- 131 1 Avenue ManhattanPLUMBING WORK TO REMOVE EXISTING FIXTURES AND INSTALL NEW PLUMBING FIXTURES, SPRINKLER HEADS AND ASSOCIATED PIPING OFF THE DOMESTIC IN EXISTING RESTAURANT SPACE AS PER PLANS…commercialPlumbing· VMC Plumbing & Heating In$25KMar 25
- 200 West Street ManhattanInstallation of new non-load bearing partition and door. No change in use, egress or occupancy. (Executive Office Security Upgrades).commercialBuilding· Structure Tone, LLC$115KMar 25
- 161 Prince Street ManhattanMinor partition work with general carpentry in apt 7. No change to use , bulk or egressmultifamilyBuilding· NYC Best Remodeling Inc$35.4KMar 25
- 220 Riverside Boulevard ManhattanINTERIOR RENOVATION OF APT. 35D ON THE 35TH FLOOR. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.multifamilyBuilding, Plumbing· Prime Construction & Rest$224KMar 26
- 201 West 34 Street ManhattanILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - CITIBANK. NO CHANGE OF USE, EGRESS OR OCCUPANCY.commercialSigns· Mad Signs Inc—Mar 25
- 550 Washington Street ManhattanGeneral construction modifications taking place on the 2nd floor as per plans filed herewith. No change in use, egress or occupancymultifamilyBuilding, Fire protection, HVAC / Mechanical, Plumbing· Structure Tone, LLC$38.4MMay 8
- 1133 6 Avenue ManhattanMechanical work for ING Financial on 10th and 11th floorcommercialHVAC / Mechanical· Marlin Mechanical Inc$740KMar 25
- 701 7 Avenue ManhattanInstallation of suspended scaffold for facade work or inspection.commercial· Skyline Restoration Inc—Mar 25
- 37 West 93 Street ManhattanFACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.multifamilyBuilding· Bay Restoration Corp$344KMar 25
- 114 East 1 Street ManhattanProposed work @ Exposure 2/west and north elevation, crack running throughout exterior wall, Rebuild parapet & exposure 2, west elevation as per plans. Address DOB Violation…multifamilyBuilding· Core Renovation LLC$75KMar 25