New York City commercial construction projects
62,207 commercial and multifamily projects from New York City’s building permit records (11,501 of them permitted in the last 90 days), newest first, each with its address, scope, value and permits. The contractor is named once a project’s first permit is 30 days old (first permit on or before October 9, 2026); Pro shows it, with the phone number, the day the permit is issued.
Source: building permit records from New York City's Socrata open-data portal, checked daily. Data through . How we count
Page 372 of 1245
- 1 Madison Avenue ManhattanLIMITED INTERIOR DEMOLITION OF FINISHES AND INTERIOR PARTITIONS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.commercialBuilding· JRM Construction MGMT LLC$115KMar 26
- 1551 Broadway ManhattanSign structure removal lower tower sign. No change of use, egress or occupancycommercialBuilding· North Shore Neon Sign LLC$295KMar 26
- 277 Park Avenue ManhattanOffice renovation for Charles Bank Includes new offices, open workstations, conference rooms, pantry, Elevator lobby, and core restrooms. Provide VAV system for all areas,…commercialHVAC / Mechanical· JT Magen & Company Inc$904KMar 26
- 277 Park Avenue ManhattanInstallation of non-load bearing partitions, doors, millwork and finishes. No change to use, egress or occupancycommercialBuilding· JT Magen & Company Inc$4MMar 26
- 100 United Nations Plaza ManhattanFISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decolamultifamily· Structual Presv System—Mar 26
- 307 7 Avenue ManhattanAPPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 10TH FL (SUITE 1007) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE,EGRESS,…commercialBuilding· LC Con Inc$126KMar 26
- 501 10 Avenue ManhattanFiling for the removal of the interior partition work, storage units and the finishes. No change in use, egress or occupancy.commercialBuilding· Volk Industrial Services$126KMar 26
- 501 10 Avenue ManhattanFiling for the removal of interior partitions, equipment, package conveyance system, and finishes. No change in use, egress or occupancy.commercialBuilding· Volk Industrial Services$40.5KMar 26
- 1674 Broadway ManhattanInterior demolition and installation of new partitions and finishes on partial 6th floor in the existing office building as per plans filed herewith only. No change to zoning,…commercialBuilding, Fire protection, HVAC / Mechanical· Wharton Smith Const NY$45KJul 7
- 960 5 Avenue ManhattanINSTALL TWO SPLIT HEAT PUMP SYSTEMS. CONDENSER OUTSIDE THE BUILDING AND AIR HANDLERS IN KITCHEN WITH A COIL INSTALLED IN THE EXISTING MAKEUP AIR UNITmultifamilyHVAC / Mechanical· D&E Refrigeration & Air C$140KMar 26
- 1633 Broadway ManhattanReinforcement of existing 16th Floor construction for floor finish, new interior partition walls, etc.commercialBuilding· JT Magen & Company Inc$175KMar 26
- 590 Madison Avenue ManhattanMECHANICAL WORK TAKING PLACE ON THE 21ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.commercialHVAC / Mechanical· RXR Construction Serv LLC$119KMar 26
- 590 Madison Avenue ManhattanGENERAL CONSTRUCTION WORK TAKING PLACE ON THE 21ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.commercialBuilding· RXR Construction Serv LLC$25.4KMar 26
- 1261 Broadway ManhattanAPPLICATION FILED FOR INTERIOR REMOVAL OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 3RD FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.commercialBuilding· 5 K Construction Resource$28.6KMar 26
- 28 Liberty Street ManhattanOPTIONS IT RECEPTION-- REMOVING GLASS WALL AND DOOR FOR RECEPTION AREA REMODEL; PATCH/REPAIR, PAINT, AND CARPET TILE REPLACEMENT. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.commercialBuilding· Concept Construction Serv$29.8KMar 26
- 20 East 74 Street ManhattanINTERIOR RENOVATION OF APARTMENT16-B AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS AND OCCUPANCY.multifamilyBuilding, Plumbing· Lewis Construction NYC In$306KMar 27
- 633 West 44 Street ManhattanAPPLICATION FILED FOR LL 11/87 FACADE REPAIRS AS PER PLANS HERE WITHIN. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.commercialBuilding· Tower Services Inc$151KMar 26
- 28 Second Avenue ManhattanAPPLICATION FILED FOR LL 87 FACADE REPAIRS AS PER PLANS HERE WITHIN. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.commercialBuilding· Tower Services Inc$34.5KMar 26
- 108 West 107 Street ManhattanAPPLICATION FOR LL11/87 FACADE REPAIRS AS PER PLANS HERE WITHIN. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.commercialBuilding· Tower Services Inc$128KMar 26
- 51 West 52 Street ManhattanStructural modification on the 17-18 floor as per plans. No change to use egress or occupancy.commercialBuilding· JRM Construction MGMT LLC$75.2KMar 26
- 51 West 52 Street ManhattanModification the existing mechanical system as per plans. No change to use, egress or occupancycommercialHVAC / Mechanical· JRM Construction MGMT LLC$320KMar 26
- 350 Fifth Avenue ManhattanGeneral Construction taking place on the 40th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.commercialBuilding· Folor Inc$2.5MMar 26
- 233 East 70 Street ManhattanPROPOSED MINOR RENOVATION TO EXISTING BATHROOM IN DWELLING UNIT 11U. PLUMBING WORK TO BE FILED UNDER LAA APPLICATION. NO CHANGE TO OCCUPANCY USE OR EGRESS.multifamilyBuilding· Freedom GS Inc$42KMar 26
- 173 Perry Street ManhattanInterior renovation to existing apt. 11N. Work to include non-structural demolition, general construction, and related finishes. No change in use, egress, or occupancy.multifamilyBuilding, Fire protection, HVAC / Mechanical, Plumbing· Hobbs, Inc$359KMar 27
- 150 Broadway ManhattanReplacement of (3) rooftop air conditioning units on the lower setback roof. All existing ductwork to remain. No change in use egress and occupancy.commercialHVAC / Mechanical· Emcor Services NY/NJ Inc$135KMar 26
- 201 West 34 Street ManhattanILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - CITIBANK. NO CHANGE OF USE, EGRESS OR OCCUPANCY.commercialSigns· Mad Signs Inc—Mar 26
- 522 5 Avenue ManhattanRemoval of interior non-load bearing partitions and related finishes on subcellar one floor through roof level. There is no change in use, egress or occupancy as part of this…commercialBuilding, Fire protection, HVAC / Mechanical· L&K Partners, Inc$5.9MApr 16
- 800 Third Avenue ManhattanInterior demo & construction of non-load bearing partitions, walls, doors, frames, ceiling and finishes as indicated on plans.commercialBuilding· Versatile Services LLC$117KMar 26
- 9 Times Square ManhattanINSTALL ILLUMINATED LED ADVERTISING SIGN (SIGN C) ON WALL STRUCTURE FILED UNDER SEPARATE APPLICATION # M01349543. (CHANGEABLE COPY)commercialSigns· North Shore Neon Sign LLC$30.2KMar 26
- 9 Times Square ManhattanINSTALL ILLUMINATED LED ADVERTISING SIGN (SIGN A) ON WALL STRUCTURE FILED UNDER SEPARATE APPLICATION # M01349543. (CHANGEABLE COPY)commercialSigns· North Shore Neon Sign LLC$47KMar 26
- 201 West 77 Street ManhattanExtending existing capped commercial kitchen exhaust riser on the exterior of the building from the second-floor setback roof to the main roof. No interior work. Total…multifamilyHVAC / Mechanical· JCK Contracting Corp$45KMar 26
- 1411 Broadway ManhattanMinor interior demolition. Installation of interior partitions, doors, suspended ceilings, flooring and finishes on the 30th Floor as per plans (Hines - Demo, Whitebox &…commercialBuilding· Nycan Builders LLC$391KMar 26
- 151 West 34 Street ManhattanMechanical modifications taking place on the 13th & 16th floors as per plans filed herewith. No change in use, egress or occupancycommercialHVAC / Mechanical· J. Phelan Construction Co$204KMar 26
- 151 West 34 Street ManhattanGeneral construction modifications taking place on the 13th & 16th floors as per plans filed herewith. No change in use, egress or occupancycommercialBuilding· J. Phelan Construction Co$270KMar 26
- 780 West End Avenue ManhattanInstall thru-wall AC units, associated GC work and components, as per plans filed herewith. No change to use, egress or occupancy.multifamilyHVAC / Mechanical· Hamilton Air Company, Inc$30KMar 26
- 270 1 Avenue ManhattanFiling for the installation of a new accessible ramp within the property line. Replace and relevel existing concrete walkway within the property line. No change to use, egress or…multifamilyBuilding· Kama Construction Corp$132KMar 26
- 50 East 125 Street ManhattanINTERIOR RENOVATION (PLUMBING WORK) TO REMOVED (2)ECB VIOLATIONS #(39154717M,39154716K) IN THE EXISTING COMMERCIAL STORE. ADDRESS ON THE VIOLATION IS WRONG (50 EAST 125STREET IS…commercialBuilding, Plumbing· Advanced Plumbing Mech$55KApr 21
- 1700 Broadway ManhattanMECHANICAL SYSTEMS WORK ON THE 42ND MARKETING FLOOR(41ST CONSTRUCTION FLOOR) AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.commercialBuilding, Fire protection, HVAC / Mechanical· CJS Industries Inc$27KApr 15
- 200 Liberty Street ManhattanGeneral Construction as shown on plans filed herewith for BPCA space. No change to use, egress or occupancy.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Wolf Construction Corp 20$2.5MMay 20
- 20 East 76 Street ManhattanInterior renovation of an existing apartment, including partition changes. No change of use, egress or occupancy under this application.multifamilyBuilding, Fire protection, HVAC / Mechanical, Plumbing· S. Donadic Inc$1.3MJun 5
- 204 Elizabeth Street Manhattan6th floor office renovation as shown on the drawings filed herewith. No change in use, egress, or occupancy.commercialBuilding, Fire protection, HVAC / Mechanical· A.W. & S. Construction Co$169KJun 11
- 66 Leonard Street ManhattanPLEASE ASSIGN TO HUB CDU. FILING TO CREATE NEW OCCUPANCY FOR ACCESSORY PASSIVE RECREATION TERRACE ON ROOF (OG R-2, UG II). REPLACE EXISTING ROOFTOP PAVERS. NO CHANGE TO USE, BULK…multifamilyBuilding, Plumbing· Preserv BLD Restor MGT In$36KMay 19
- 20 East 9 Street Manhattaninterior renovation in apt 25CmultifamilyBuilding· Orchid Construction Corp$291KMar 26
- 205 East 14 Street ManhattanLegalization of work done without permits and remove partial vacate. violations 35690750H; 35690299M; 35690298K. 35332920LmultifamilyBuilding· David Turner Architect,PC$25KMar 26
- 202 Broome Street ManhattanFILING HEREWITH CONSTRUCTION WORK FOR INTERIOR RENOVATION OF MUSEUM SPACE AS PER PLANS.multifamilyBuilding, Fire protection, HVAC / Mechanical, Plumbing· Nucor Construction Corp$3.3MAug 17
- 641 Avenue Of The Americas ManhattanConstruction work on the cellar and 1st floor (landlord retail/lower level work) as indicated on drawings.commercialBuilding· JRM Construction MGMT LLC$2.9MMar 26
- 505 8 Avenue ManhattanPropose to file for mechanical work for two (2) air-cooled packaged units with ductwork. No change to use, egress or occupancy.commercialHVAC / Mechanical· North Star Air Condition$44.5KMar 26
- 7 West 18 Street ManhattanFacade repaircommercialBuilding· Colgate Restoration Corp$83.7KMar 26
- 590 Madison Avenue ManhattanModifications to the existing sprinkler system on the Sub-cellar level 4, 10th & 11th floors (Apollo Global Management) as per plans. No change to use, egress or occupancy.commercialFire protection· Par Fire Protection LLC$360KMar 26
- 1470 Madison Avenue ManhattanMount Sinai - Hess Data Center Chilled Water Expansion Project Phase 2 - Mechanical modifications on 1st, 3rd, 9th, 11th, and 11th Floor Mezzanine as shown on plans filed…commercialHVAC / Mechanical, Plumbing· Amf Mechanical Systems Co$6MMay 20