New York City commercial construction projects
62,199 commercial and multifamily projects from New York City’s building permit records (11,165 of them permitted in the last 90 days), newest first, each with its address, scope, value and permits. The contractor is named once a project’s first permit is 30 days old (first permit on or before October 11, 2026); Pro shows it, with the phone number, the day the permit is issued.
Source: building permit records from New York City's Socrata open-data portal, checked daily. Data through . How we count
Page 162 of 1244
- 1330 Avenue Of The Americas ManhattanGeneral construction modifications taking place on the cellar & 1st floor as per plans filed herewith. No change in use, egress or occupancycommercialBuilding, Fire protection, Plumbing· Oak GC LLC$1.1MAug 11
- 924 Madison Avenue ManhattanFILING FOR INTERIOR DEMOLITION OF EXISTING RETAIL SPACE TO INCLUDE REMOVAL OF ALL EXISTING CEILING, WALL AND FLOOR FINISH AS PER PLAN. NO CHANGE TO USE EGRESS OR OCCUPANCY.commercialBuilding· Prime Renovations &$30KJul 28
- 100 Broadway ManhattanReplacement of air conditioning units on 11th Floor. no change in use, egress or occupancy.commercialHVAC / Mechanical· Axis Mechanical Of NY Inc$100KJul 28
- 246 West End Avenue ManhattanINTERIOR RENOVATIONS OF APT 7A AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCYmultifamilyBuilding· Sora LLC$127KJul 28
- 115 Broadway ManhattanGENERAL CONSTRUCTION TAKING PLACE ON 17TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.commercialBuilding· Synergy Construction Inc$283KJul 28
- 150 West 47 Street Manhattaninspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: Brian Barcomultifamily· Streamline Consultants NY—Jul 28
- 222 Park Avenue South ManhattanInterior demolition and construction of non-load bearing partitions as per GC drawings. Replaced and new plumbing fixtures as per PL drawings. No change to occupancy, use, or…multifamilyBuilding, Plumbing· J.F. Hughes Builders Inc$140KAug 7
- 221 East 82 Street ManhattanEXTERIOR RESTORATION PROJECT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.multifamilyBuilding· DK Builders Inc$75KJul 28
- 584 Broadway ManhattanInterior renovation with demolition of existing partition and construction of partition as shown herewith on drawings. No change to use, egress, or occupancy.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Interior Building Service$662KSep 30
- 535 Broadway Manhattansprinkler designcommercialFire protection· Allstate Sprinkler LLC$54KJul 28
- 360 East 88 Street ManhattanINSTALLATION OF NEW SPLIT-SYSTEM HEAT PUMP FOR TENANT GYM. NO CHANGE IN EGRESS OR OCCUPANCY.multifamilyBuilding· Linked Mechanical LLC$43.2KJul 28
- 437 East 9 Street ManhattanINTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE (UG VI) INCLUDING THE REMOVAL & INSTALLATION OF NON-LOAD BEARING PARTITIONS & NEW FLOOR & WALL FINISHES AS PER THE DRAWINGS FILED…multifamilyBuilding, HVAC / Mechanical, Plumbing· Rite Way Constr Group Cor$164KSep 15
- 16 East 48 Street ManhattanHEREWITH FILE TO RENOVATE EXISTING RESTAURANT (C/O 69119). WORK INCLUDES NEW/RELOCATE PLUMBING FIXTURES WITH ASSOCIATED PLUMBING ELEMENTS, AND FIRE-STOPPING IS PROVIDED. NO…commercialPlumbing· MSB Plumbing Contractors$62.5KJul 28
- 440 West 21 Street ManhattanREPLACE TWO (2) DIRECT-VENT GAS-FIRED HOT WATER HEATERS AS PER PLANS. CONNECT TO EXISTING GAS PIPING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.commercialHVAC / Mechanical, Plumbing· Integrated HVAC Sys & SVC$70KAug 7
- 1250 Avenue Of The Americas ManhattanINTERIOR DEMOLITION WORK ON THE 9TH FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.commercialBuilding· Mass Contracting Corp$81.5KJul 28
- 388 West Broadway ManhattanINSTALL NEW CHIMNEY AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.multifamilyHVAC / Mechanical· Dual Fuel Company LLC$30.9KJul 28
- 302 5 Avenue ManhattanAPPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 12TH AND 14TH FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE,…commercialBuilding· Aik Renovation Inc$508KJul 28
- 155 West 60 Street ManhattanMechanical modifications as shown on plans.commercialBuilding, HVAC / Mechanical· Trane U.S. Inc$1MJul 30
- 425 East 13 Street ManhattanREPLACE TWO DOMESTIC WATER STORAGE TANKS WITH INDIRECT WATER HEATERS.multifamilyPlumbing· East Coast Mechnacial LLC$175KJul 28
- 420 Lexington Avenue ManhattanMechanical changes as indicated on plans.commercialFire protection, HVAC / Mechanical, Plumbing· Ashlar Mechanical Corp$73KJul 28
- 1 Tavern On The Green ManhattanSeasonal pergola accessory to Tavern on The Green on the south terrace.commercialBuilding· Winick Productions, LLC$96.3KJul 28
- 608 Fifth Avenue ManhattanArchitectural changes on the 5th floor as indicated on drawings.commercialBuilding· Wharton Smith Const NY$262KJul 28
- 76 Horatio Street ManhattanFACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.multifamilyBuilding· Ideal Roofing & Sheet Me$66.1KJul 28
- 875 Park Avenue ManhattanINTERIOR RENOVATION OF EXISTING BATHROOM IN APARTMENT 5AB ON THE 005 FLOOR. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.multifamilyBuilding· Fine Craftsman Group LLC$45KJul 28
- 445 West 48 Street ManhattanThe scope of work consist of replacing the front and rear parapet walls with new and includes associated facade repairs. No change to use, egress, or occupancy.multifamilyBuilding· Bulado General Contractor$298KSep 1
- 420 Lexington Avenue ManhattanHEREWITH FILING FOR MODIFICATIONS TO THE EXISTING SPRINKLER SYSTEM ON THE 4TH AND 9TH FLOOR AS PER PLANS./ NO CHANGE TO USE, OCCUPANCY OR EGRESS.commercialFire protection· Aggressive Fire Prot LLC$55KJul 28
- 420 Lexington Avenue ManhattanHerewith filing for modification to the existing mechanical systems on the 4th & 9th floor as per plans. no change to use, occupancy or egress under this application.commercialHVAC / Mechanical· Finaly Genl Contr Corp$418KJul 28
- 420 Lexington Avenue ManhattanHEREWITH FILING FOR INTERIOR RENOVATION ON THE 4TH & 9TH FLOOR AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.commercialBuilding· Finaly Genl Contr Corp$1.4MJul 28
- 1125 Park Avenue ManhattanRENOVATION OF 9E FILED IN CONJUNCTION WITH DOB NOW PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.multifamilyBuilding, Plumbing· Edy Restoration Corp$158KJul 30
- 101 West 78 Street ManhattanInterior renovation of existing apartment 5B on the 5th and 6th floor. General Construction. No change in use, occupancy or egress.multifamilyBuilding, Plumbing· L & H General Constructio$176KOct 20
- 562 First Avenue ManhattanMechanical modifications on 4th floor as shown on plans filed herewith. No change in egress, occupancy, or use.commercialBuilding, HVAC / Mechanical· Empire General Contractin$328KJul 29
- 425 Madison Avenue ManhattanDe Janeiro- APPLICATION IS FILED FOR INTERIOR RENOVATION IN EXISTING RETAIL SPACE-REMOVAL & INSTALLATION OF NON-LOAD BEARING PARTITIONS, REMOVAL OF CONVENIENCE STAIR, FINISHES &…commercialBuilding· Beam Enterprises Inc$95KJul 29
- 122 East 103 Street ManhattanHerewith filing to remove and reinstall a retaining wall and adjacent soil in the rear yard. No change to use, egress or occupancy.multifamily· Ajl Builders, Corp$50KJul 28
- 225 West 86 Street ManhattanINTERIOR RENOVATION OF EXISTING APARTMENT 512. RENOVATION WORK WILL INCLUDE ADJUSTMENTS TO INTERIOR LAYOUT, NEW FIXTURES AND FINISHES. NO CHANGE IN USE, EGRESS OR OCCUPANCY.multifamilyBuilding, HVAC / Mechanical· Building Code Partners In$216KAug 4
- 310 East 70 Street ManhattanINTERIOR RENOVATION OF UNIT 1M INCLUDING REMOVAL AND INSTALLATION OF PARTITIONS AS PER PLANS AND INSTALLATION OF HEAT PUMP AND AIR HANDLERS. NO CHANGE IN USE, EGRESS, OR OCCUPANCYmultifamilyHVAC / Mechanical· Teka Enterprises Inc$124KJul 28
- 106 Pinehurst Avenue ManhattanREPAIR EXISTING RETAINING WALLS AS PER PLANS FILED HEREWITHmultifamilyBuilding· Mand Restoration Corp$155KJul 28
- 333 7 Avenue ManhattanMechanical modifications as per plans filed herewith. No change in use, egress or occupancy.commercialHVAC / Mechanical, Plumbing· Arista Electric Corp$200KJul 30
- 99 Hillside Avenue ManhattanHereby filing for roof and facade repairs. No change in use, egress or occupancy.multifamilyBuilding· C.C.C. Renovation Inc$575KJul 28
- 500 West 33 Street ManhattanRemoval and construction of non-structural partitions, ceilings and casework for RU312 as shown on drawings. No change in use, egress or occupancy.commercialBuilding, Fire protection, HVAC / Mechanical· A. Bonaduce, Inc$1.4MSep 22
- 1133 Lexington Avenue Manhattanfull demolition of four story structure, using hand held with mechanical assistmultifamilyDemolition, HVAC / Mechanical· Volk Industrial Services$1MSep 18
- 1135 Lexington Avenue Manhattanfull demolition of two story structure using hand held with mechanical to assistcommercialDemolition, HVAC / Mechanical· Volk Industrial Services$1MSep 22
- 150 East 79 Street Manhattanfull demolition of four story structure using hand held with mechanical to assist on grade.commercialDemolition, HVAC / Mechanical· Volk Industrial Services$1MSep 22
- 152 East 79 Street Manhattanfull demolition of four story structure using hand held with mechanical to assist.commercialDemolition, HVAC / Mechanical· Volk Industrial Services$1MSep 21
- 148 West 67 Street ManhattanReplacement and repointing of the damaged bricks, stone patching.multifamilyBuilding· Rapid Masonry Restoration$31.8KJul 28
- 154 East 79 Street Manhattanfull demolition of four story structure, by hand held equipment only.commercialDemolition, HVAC / Mechanical· Volk Industrial Services$1MSep 14
- 730 3 Avenue ManhattanINTERIOR RENOVATION WORK TO INCLUDE DEMO OF EXISTING AND CONSTRUCTION OF NEW PARTITIONS, DOORS, FINISHES, CEILING AND RELATED CONSTRUCTION AS SHOW ON PLANS FILED HEREWITH…commercialBuilding, Fire protection, HVAC / Mechanical· Par Fire Protection LLC$472KJul 28
- 19 East 72 Street ManhattanRENOVATION OF EXISTING APARTMENT NUMBER 9/10C TO INCLUDE INSTALLATION OF NEW, NON-LOAD-BEARING WALLSAND PARTITIONS, INTERIOR FINISHES, PLUMBING FIXTURES, LIGHTING FIXTURES, AND…multifamilyBuilding· Elite Style Contracting$185KJul 28
- 111 Worth Street ManhattanMECHANICAL SYSTEM INSTALLATION ALTER EXISTING DUCTWORK, PROVIDE NEW HOOD AND EXHAUST SYSTEM.multifamilyHVAC / Mechanical· PSP NY Construction, Inc$400KJul 28
- 31 East 72 Street ManhattanGENERAL CONSTRUCTION FOR THE RENOVATION AND COMBINATION OF APARTMENTS #6B & #6C ON THE 6TH FLOOR. PER TPPN 3/97. AS PER PLANS FILED. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.multifamilyBuilding, HVAC / Mechanical, Plumbing· M Construction NYC Corp$346KJul 31
- 54 Riverside Drive ManhattanEXTERIOR RESTORATION: TERRA COTTA REPLACEMENT, TERRA COTTA REPAIRS, BRICK REPLACEMENT, POINTING, LINTEL REPLACEMENT, STUCCO REPLACEMENT, MARBLE PATCHING ETC. AS PER PLANS. NO…multifamilyBuilding· Prat Enterprises Corp$553KJul 28