New York City commercial construction projects
62,199 commercial and multifamily projects from New York City’s building permit records (11,165 of them permitted in the last 90 days), newest first, each with its address, scope, value and permits. The contractor is named once a project’s first permit is 30 days old (first permit on or before October 11, 2026); Pro shows it, with the phone number, the day the permit is issued.
Source: building permit records from New York City's Socrata open-data portal, checked daily. Data through . How we count
Page 159 of 1244
- 155-15 78 Street QueensINSTALLATION OF SOLAR PANELS ON ROOF. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.multifamilySolar· Tom Petersen Architect, LLC$41.1KJul 29
- 42-09 28 Street QueensINSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT (MATERIAL HOIST). NO CHANGES IN THE EGRESS.commercial· Elm Suspension Systems—Jul 29
- 38-08 29 Street QueensThis application is filed to install cooking equipment and other plumbing fixtures. No change in use, egress and occupancymultifamilyPlumbing· Premier Flow PLBG And HTG$30KJul 29
- 141-09 78 Avenue QueensAn application is being filed for the expansion of an existing clinic to include 12 examination rooms, infusion bays, and an occupational (OT/PT) suite.multifamilyBuilding· Cavalry GC&P LLC$65.1KJul 29
- 57-00 49 Place QueensINSTALLATION OF 8 TRANE ROOFTOP MOUNTED UNITS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.commercialHVAC / Mechanical· Green Home General Cont$240KJul 29
- 46-11 Queens Boulevard QueensT-Mobile-- General construction for retail build out as per plans filed. No change to use, egress, or occupancy.multifamilyBuilding, HVAC / Mechanical, Plumbing· Ridge Construction Corp$198KJul 30
- 4-12 49 Avenue QueensInstallation of material hoist and suspended scaffold for facade inspection/repair.multifamilyBuilding· WKR Construction Inc—Jul 29
- 33-23 127 Street QueensRepair of exterior wall and create openings on exposure 2 and 3 to correct ECB violations #39182097Z & 39182098K. No change in use, egress or occupancy.commercialBuilding· A&H Empire Construction$46.8KJul 29
- 43-25 Hunter Street QueensSprinkler / Plumbing work as shown on plans submitted herewith. No change to egress, occupancy or use as of right.multifamilyFire protection, Plumbing· Darci Plumbing Co Inc$116KJul 29
- 270-05 76 Avenue QueensNorthwell LIJ Sprinkler Project - Research Wing: minor Architectural scope in conjunction with Sprinkler upgrades throughout building on floors indicated, as per plans filed…commercialBuilding· Hunter Roberts Constructi$176KJul 29
- 43-23 Colden Street QueensGarage repairs as per plans. No change in use, egress, or occupancy.multifamilyBuilding· Skyline Restoration Inc$170KJul 29
- 212-01 26 Avenue QueensModification to Plumbing Systems as per plans filed here with.commercialPlumbing· Par Plumbing Co., Inc$50KJul 29
- 209-90 23 Avenue QueensINTERIOR RENOVATION OF LOBBY AREA AT THE FITNESS CENTER. NO CHANGE IN USE, EGRESS AND OCCUPANCY.multifamilyBuilding· Renu Contracting & Resto$150KJul 29
- 30-15 29 Street QueensCellar Floor Gymnasium Upgrades and Associated Boys and Girls Bathrooms Renovations.commercialBuilding, Plumbing· York Castle Construction$641KAug 3
- 130-31 Northern Boulevard QueensHerewith filing for full demo on existing building related to NYC DOT/DDC projectcommercialDemolition· MPCC Corp$470KJul 29
- 132-14 Liberty Avenue QueensINSTALL NEW SPRINKLER SYSTEM AND RELATED PIPING AS PER DRAWING.commercialFire protection· Case Plumbing LLC$51.8KJul 29
- 179 Grand Street ManhattanPENTHOUSE ROOF TERRACE WATERPROOFING REPAIR. INSTALL NEW WATERPROOFING MEMBRANE OVER EXISTING ROOF MEMBRANE. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.multifamilyBuilding· Skyway Restoration & Con$30KJul 29
- 514 West 36 Street ManhattanInstallation and use of climbing formwork as per plans filed herewith. This application is filed in conjunction with NB M08018629-I1.commercialHVAC / Mechanical· Cross Country Construct$100KJul 29
- 67 Perry Street ManhattanGeneral construction related to the renovation of apartment #5 on the fifth floor.multifamilyBuilding, Plumbing· No Limit Contracting Inc$162KOct 1
- 25 West 43 Street ManhattanPROPOSED INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE FOR AN EATING & DRINKING ESTABLISHMENT AT THE FIRST FLOOR LEVEL. NO CHANGE IN USE, EGRESS OR OCCUPANCY.commercialBuilding· Wali Construction Inc$87.3KJul 29
- 446 West 50 Street ManhattanREPLACE ONE (1) GAS-FIRED STEAM BOILER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.multifamilyHVAC / Mechanical, Plumbing· Bell Fuel Oil, LLC$121KJul 29
- 104 East 25 Street ManhattanInterior renovation to include demolition of existing and construction of new partitions. no change in use, egress, or occupancy.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Atlas Supreme Service Inc$333KSep 9
- 726 Broadway ManhattanHEREWITH FILING FOR GENERAL CONSTRUCTION TO INSTAL TURNSTILES ON 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.commercialBuilding· Brosna Construction Corpo$200KJul 29
- 20 West 22 Street ManhattanPropose to perform renovation of existing commercial floor with new plumbing fixtures and modification of existing sprinkler system. No change in use, egress or occupancy.commercialFire protection· G. C. PLBG & HTG Inc$102KJul 29
- 1131 Lexington Avenue ManhattanTHE PLANS ENCLOSED DEPICT THE EXTENT, SEQUENCE, MEANS& METHODS FOR THE PROPOSED INTERIOR ALTERATION OF THE 4 STORY BUILDING(S) LOCATED AT 1131 LEXINGTON AVENUE, 10075.commercialBuilding· Volk Industrial Services$30KJul 29
- 657 West 161 Street ManhattanFACADE REPAIR AS SHOWN ON PLANS.multifamilyBuilding· Paragon General Contracto$55KJul 29
- 401 West 23 Street ManhattanREMOVE AND REPLACE EXISTING (2) BOILERS AND ASSOCIATED BURNERS. EXISTING FLUE BREECHING TO BE UTILIZED. NO CHANGE IN EGRESS, OCCUPANCY, OR USE.multifamilyHVAC / Mechanical, Plumbing· C C Controlled Combustion$825KJul 30
- 601 Lexington Avenue ManhattanInstallation of suspended scaffold for facade work or inspection.commercial· Superstars Contracting In—Jul 29
- 148 Lafayette Street Manhattan(GENERAL CATALYST 12TH FL WEALTH) Filing herewith architectural plans to include interior renovation and general construction work on the 12th floor. There will be no change of…commercialBuilding, HVAC / Mechanical· Structure Tone, LLC$120KJul 29
- 100 West 39 Street ManhattanInstallation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancymultifamilyBuilding· Prat Enterpise, Corp—Jul 29
- 404 Lafayette Street ManhattanINSTALLATION OF (1) 3 TON AC UNIT WITH CONDENSER ON EXTERIOR WALLcommercialHVAC / Mechanical· Penguin Maintenance & Ser$67.6KJul 29
- 38 West 21 Street ManhattanREMOVAL OF BOILER, FUEL TANK & ALL RELATED PIPING IN BOILER ROOMcommercialPlumbing· Ethos Plumbing Corp$50KJul 29
- 885 Third Avenue ManhattanInterior demo & reno of non-load bearing partitions, walls, doors, ceiling and finishes as indicated on plans.commercialBuilding· Synergy Construction Inc$707KJul 29
- 20 Hudson Yards ManhattanInterior renovation of existing commercial space, new eating and drinking establishment, new walls, floors and ceiling finishes.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Pa Builders, Inc$396KOct 28
- 1036 Park Avenue ManhattanInterior renovation on the third floor for the combination of apartment #3DA. No change of use, egress or occupancy.multifamilyBuilding, Plumbing· Demo Custom Cabinets,Inc$250KAug 10
- 150 Fifth Avenue ManhattanModifications to the existing HVAC system on the 3rd floor as per plans. No change to use, egress or occupancy.commercialHVAC / Mechanical· JT Magen & Company Inc$123KJul 29
- 425 East 51 Street ManhattanInstallation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.multifamilyBuilding· J&S Waterproofing LLC—Jul 29
- 10 East 39 Street ManhattanAPPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 9TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR…commercialBuilding, HVAC / Mechanical, Plumbing· E And G Modica Contractin$177KAug 5
- 303 West 80 Street ManhattanRespectfully request file Post Approval Amendment to legalize the installation of (3) split ducted central A/C system. No drawing changes required. No change in use, egress, or…multifamilyHVAC / Mechanical· All Makes HTG & A/C Corp$41.1KJul 29
- 743 6 Avenue ManhattanRenovation of store on first floor. Work includes new storefront and removal of partitions. patchwork for where partitions are being removed.multifamilyBuilding· An American Company, Inc$47.5KJul 29
- 2008 Broadway ManhattanInterior tenant clean-out. Modifications of existing non-load-bearing partitions, doors, ceilings, lighting, soffits, interior roll-up door, bollards and raised platform.…multifamilyBuilding· Coastal Building Maintain$85KJul 29
- 880 Third Avenue ManhattanSprinkler work during buildout on 13th floorcommercialFire protection· Capitol Fire Sprinkler Co$33KJul 29
- 5 East 81 Street ManhattanAlteration filed to replace ex cooling tower and RTU in ex location, add 1 heat pump, repair step cracks in rear masonry wall & re-coat with masonry coating.multifamilyBuilding, HVAC / Mechanical· Scordio Construction Inc$205KJul 29
- 2 Cornelia Street ManhattanInterior renovation of apt. 404. Minor removal and construction of partitions and finishes. No change to use egress or occupancy.multifamilyBuilding· Matador Enterprise Inc$180KJul 29
- 411 Pearl Street ManhattanM520, INSTALLATION OF A TEMPORARY EMERGENCY MOBILE CHILLER TRAILER AND GENERATOR CONNECTED TO EXISTING BUILDING CHILLER SYSTEM AT THE SIXTH FLOOR ON BEHALF OF THE CONTRACTOR. NO…commercialHVAC / Mechanical· Maric PLBG & HTG Inc$190KSep 25
- 222 East 34 Street ManhattanFACADE RESTORATION AS PER PLANS. NO CHANGE TO USE EGRESS OR OCCUPANCY.multifamilyBuilding· Annex Enterprise, Inc$150KJul 29
- 255 East 77 Street ManhattanInterior demolition and construction of partitions, and renovation of Master Bathroom in existing apartment #4B. PL is filed under the subsequent app. No change in use, occupancy…multifamilyBuilding, Plumbing· Structure Ventures LLC$446KSep 21
- 130 West 12 Street ManhattanINTERIOR RENOVATION OF EXISTING RESIDENTIAL UNIT ON THE 1ST FLOOR APT 1A, AS PER DRAWINGS HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.multifamilyBuilding, Plumbing· Happy Carpenters Inc$123KAug 7
- 52 Broadway ManhattanInterior renovation to existing cellar commercial space. No change of use, occupancy or egress. Renovation includes new finishes, fixtures and equipment.commercialBuilding· Pa Builders, Inc$275KJul 29
- 50 Riverside Boulevard ManhattanTHE PARTIAL RENOVATION OF APARTMENT 26B CONSISTING OF BATHROOM RENOVATIONS AND ADJUSTMENTS TO NON-LOAD BEARING INTERIOR PARTITIONS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.multifamilyBuilding, HVAC / Mechanical, Plumbing· RDM Renovation Corp$240KAug 24