61,981 commercial and multifamily projects from New York City’s building permit records (11,164 of them permitted in the last 90 days), newest first, each with its address, scope, value and permits. The contractor is named once a project’s first permit is 30 days old (first permit on or before October 7, 2026); Pro shows it, with the phone number, the day the permit is issued.
Source: building permit records from New York City's Socrata open-data portal, checked daily. Data through . How we count
Page 1146 of 1240
- 330 7 Avenue ManhattanSUBSEQUENT APPLICATION FOR MODIFICATION OF PLUMBING AND SPRINKLER FIXTURES AS PER PLAN. NEW HOT WATER HEATERS. THERE IS NO CHANGE TO USE, EGRESS, OR OCCUPANCY FILED UNDER THIS…commercialFire protection, HVAC / Mechanical, Plumbing· Anesis Services Corp$302KAug 25
- 1114 Avenue Of The Americas ManhattanFiling herewith modification to the existing sprinkler system in the Cellar (Concourse Level.) as per plans filed herewith. No change to use, egress or occupancy.commercialFire protection· Aggressive Fire Prot LLC$30KDec 9
- 99 Park Avenue ManhattanStructural Modifications at Lobby Temporary Egress as per plans filed herewith. No change to occupancy, use, or means of egress.commercialBuilding· Tri-Star Construction Cor$47.9KDec 9
- 222 Central Park South ManhattanFacade and roof restoration no changes to use, occupancy or egress.multifamilyBuilding· Preserv BLD Restor MGT In$875KDec 9
- 530 First Avenue ManhattanHEREWITH FILING FOR SPRINKLER AND STANDPIPE MODIFICATION FOR THE FIT OUT AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCYcommercialFire protection· Sirina Fire Prot Corp$500KDec 9
- 560 Riverside Drive ManhattanTHE PROJECT CONSISTS OF REPLACING AN AIR HANDLING UNIT AND FAN COIL UNITS IN KIND DUE TO AGE OF EQUIPMENT. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.multifamilyHVAC / Mechanical· Ideal Interiors Group LLC$80KDec 9
- 95 Greene Street ManhattanSUBSEQUENT PLUMBING WORK IN CONJUCTION WITH INTERIOR RENOVATION OF APT 4A.multifamilyHVAC / Mechanical, Plumbing· Best Plumbing & HVAC Inc$40.5KOct 15
- 119 5 Avenue ManhattanModifications to existing plumbing system. No change in use occupancy or egresscommercialPlumbing· Skinner Plumbing & Heatin$60KDec 9
- 76 Franklin Street ManhattanPLUMBING FOR THE RENOVATION OF APARTMENT #2 ON THE EXISTING 2ND FLOOR AND MEZZANINE (MZ2). AS PER PLANS FILED. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.multifamilyBuilding, HVAC / Mechanical, Plumbing· Level Up Plumbing Corp$89KJan 30
- 388 Greenwich Street ManhattanFloor 7, Adding B- Business occupancy to 511 persons and decreasing F-2 Data Center/Mech to 76 persons. Installation of interior non-bearing partitions and related finishes as…commercialBuilding· James E Fitzgerald Inc$55KDec 9
- 541 East 13 Street ManhattanFacade Repair Project. No changes in use, egress, or occupancy.multifamilyBuilding· Pna Contracting Corp$298KDec 9
- 90 Park Avenue ManhattanProposing to renovation existing retail space - new soffit, new finishes, casework, equipment, minor mechanical work, wall treatments, furniture and graphics. All work as per…commercialBuilding, Plumbing· Schumacher & Farley P&H C$174KDec 11
- 345 East 102 Street ManhattanMODIFY HAVC SYSTEM IN A MEDICAL CLINICAL OFFICE AT PART OF 4TH FLOOR , REMOVE PART OF THE EXISTING A/C UNIT AND ASSOCIATES DUCT WORK. IN ADDITION PROVIDE NEW DUCT WORK NEW TOILET…multifamilyHVAC / Mechanical· Glenwood Management Corp$200KDec 9
- 956 Fifth Avenue ManhattanMechanical work filed in conjunction apartment #14A renovation as per work filed herewith. No Change to use, egress or occupancy.multifamilyHVAC / Mechanical· Xhema Of N.Y. Inc$120KDec 9
- 125 East 29 Street ManhattanProposed eight (8) story mixed-use building as per plans filed.commercialBuilding, Plumbing· 345 Management Group Inc—Sep 21
- 785 Fifth Avenue ManhattanGENERAL CONSTRUCTION EXTERIOR WORK FOR DRYER VENT, LOUVER, EXTERIOR RENOVATIONS & WINDOW REPLACEMENTS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.multifamilyBuilding· D Reis Contracting Corp$300KDec 9
- 717 Fifth Avenue ManhattanSTRUCTURAL MODIFICATIONS TAKING PLACE ON THE 1ST FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.commercialBuilding· Elysium Construction Inc$100KDec 9
- 150 West 121 Street ManhattanRENOVATION OF A 4-STORY+CELLAR+BASEMENT, LANDMARK BROWNSTONE BUILDING, BUILT IN 1910; THE SCOPE INCLUDES NEW PARTITIONS FOR NEW APARTMENT LAYOUTS, NEW JOISTS, NEW FINISHES &…multifamilyBuilding· Avante Contracting Corp$2.2MDec 9
- 600a West 125 Street ManhattanMinor structural work filed for proposed McDonalds restaurant. No change to use, egress, or occupancy.multifamilyBuilding· Tom Rectenwald Constructi$50KDec 9
- 228 Lenox Avenue ManhattanSCOPE OF WORK: STRUCTURAL WORK CONVERT FUNERAL PARLOR WITH TWO (2 ) DWELLING UNITS TO TWO (2) FAMILY WITHIN EXISTING 5 STORY WITH CELLAR BROWNSTONE. INCLUDES INTERIOR STEEL & LVL…commercialBuilding, Fire protection, HVAC / Mechanical· Rightway PLBG And HTG Inc$343KAug 28
- 2850 Frederick Douglass Boulevard ManhattanSTRUCTURAL SCOPE DOCUMENTED HEREIN IS FOCUSED ENTRY UPGRADES TO EXISTING MULTIFAMILY BUILDING; INCLUDING NEW CONCRETE ENTRY STAIR & RAMP AND NEW STRUCTURAL STEEL ENTRY CANOPY…multifamilyBuilding, HVAC / Mechanical, Plumbing· Tradeline Plumbing Inc$4.4MSep 23
- 219 Scholes Street BrooklynInterior renovations to include demo & replacement of existing PL fixtures & kitchen appliances, millwork & windows. Partition removal & construction to meet UFAS requirements.…multifamilyBuilding· MDG Design & Constr LLC$55KDec 9
- 200 Ten Eyck Walk BrooklynInterior renovation to include demo & replacement of existing PL fixtures and kitchen appliances, millwork & windows. Partition removal & construction to meet UFAS requirements.…multifamilyBuilding· MDG Design & Constr LLC$55KDec 9
- 196 Maujer Street BrooklynInterior renovations to include demo & replacement of existing PL fixtures, kitchen appliances, millwork & windows. Partition removal & construction to meet UFAS requirements.…multifamilyBuilding· MDG Design & Constr LLC$55KDec 9
- 291 Livingston Street BrooklynSUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR RESTORATION WORK AT 291 LIVINGSTON STREET, BROOKLYN 11217.commercial· S&N Builders, Inc—Dec 9
- 570 Jamaica Avenue BrooklynINSTALLATION OF OUTRIGGERS FOR FACADE REPAIR AND INSPECTIONcommercialBuilding· Kay Waterproofing Corp.—Dec 9
- 286 Eastern Parkway Brooklyninstallation of outrigger for facade repair.multifamilyBuilding· Capital Construction & Pa—Dec 9
- 108 7 Avenue BrooklynINTERIOR RENOVATION EXISTING COMMERCIAL SPACE WITH PARTITION AND MECHANINCAL WORK ON THE 1ST FLOOR AND OPEN SPACRE. NO CHANGE IN USE, EGERSS OR OCCUPANCY.multifamilyBuilding· NY Building Associates In$40KDec 9
- 1483 Dekalb Avenue BrooklynPROPOSED INTERIOR RENOVATION OF EXISTING 1ST FLOOR. CONSTRUCTION WORK AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.multifamilyBuilding, Plumbing· Superservice Inc$52.5KFeb 10
- 4116 3 Avenue BrooklynProposed partial storefront enlargement and replacement with finish work as per plan. No change in use, egress, or occupancy.commercialBuilding· Dazong HVAC & R, Inc$28KDec 9
- 1 Boerum Place BrooklynINTERIOR ILLUMINATED NON-ADVERTISING ACCESSORY SIGN - IN PROPERTY LINES - BLANK STREET COFFEE. NO CHANGE OF USE, EGRESS OR OCCUPANCY.multifamilySigns· City Signs Inc—Dec 9
- 1 Boerum Place BrooklynNON-ILLUMINATED NON-ADVERTISING DOUBLE-FACE PROJECTING ACCESSORY SIGN - BLANK STREET COFFEE. NO CHANGE OF USE, EGRESS OR OCCUPANCY.multifamilySigns· City Signs Inc—Dec 9
- 820 54 Street BrooklynRENOVATION OF BEAUTY SALON ON 1ST FLOOR WITH, REPAIR/REPLACE/NEW PARTITION, FLOOR, CEILING, DOOR, PAINTING AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.multifamilyBuilding, Plumbing· High Quality Construction$57KDec 12
- 535 Dean Street BrooklynEXTERIOR ROOF TERRACE RENOVATION. INSTALLATION OF SOLAR ENERGY SYSTEM & GREEN ROOF. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.multifamilyBuilding· Future Green Studio Corp$437KDec 9
- 140a 58 Street BrooklynINSTALLATION OF NEW COMMERCIAL DISHWASHER WITH ASSOCIATED PLUMBING SYSTEMS AS PER PLANScommercialPlumbing· Liquid PLBG & HTNG SCS In$50KDec 9
- 720 East New York Avenue BrooklynWORK SHALL INCLUDE REMOVAL OF PARTITIONS, REPLACEMENT OF FINISHES & FIXTURES, INSTALLATION OF PARTITIONS, AS PER PLANS.multifamilyBuilding· FSC D&C LLC$1MDec 9
- 930 Flushing Avenue BrooklynRepair existing wall panel above garage doorcommercialBuilding· Dm80 Solutions LLC$65KDec 9
- 359a 14 Street BrooklynINTERIOR RENOVATIONS ONLY OF CELLAR THROUGH THIRD FLOOR AND ALSO TO OBTAIN NEW CERTIFICATE OF OCCUPANCYmultifamilyBuilding, HVAC / Mechanical, Plumbing· Dunrite Design Group$378KFeb 6
- 720 East New York Avenue BrooklynWORK SHALL INCLUDE REMOVAL OF PARTITIONS, REPLACEMENT OF FINISHES & FIXTURES, INSTALLATION OF PARTITIONS, AS PER PLANS.multifamilyBuilding· FSC D&C LLC$883KDec 9
- 176 Dikeman Street BrooklynStructural work related to construction of 6-story New BuildingcommercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Urban Atelier Group LLC—Jun 16
- 518 Thatford Avenue BrooklynPROPOSED THREE STORY, THREE FAMILY DWELLING.multifamilyBuilding, Fire protection, HVAC / Mechanical, Plumbing· Kaieteur Construction Inc—Sep 16
- 141 Flushing Avenue BrooklynMECHANICAL WORK ASSOCIATED WITH INTERIOR RENOVATION AT 3RD FLOOR AS PER PLANS FILED HEREWITH.commercialBuilding, Fire protection, HVAC / Mechanical· Hunter Roberts Constructi$3.2MJan 21
- 450 63 Street BrooklynCONVERT CELLAR AND BASEMENT OF AN EXISTING 3-FAMILY BUILDING TO MEDICAL OFFICE. GENERAL CONSTRUCTION WORK AS PER PLAN. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.multifamilyBuilding· High Quality Construction$248KDec 9
- 106 Lefferts Place BrooklynCONVERSION OF 1 FAMILY & 6 SRO HOUSE TO 4 FAMILY HOUSE AS PER PLAN AND OBTAIN A NEW C OF OmultifamilyBuilding· The Demar Gen'l Constr LT$39.6KDec 9
- 181 North 6 Street BrooklynTHIS APPLICATION IS FILED FOR A 1 FAMILY 4 STORY RESIDENCE.multifamilyBuilding, Fire protection, HVAC / Mechanical· Yafe Meod Corp$1.2MJan 6
- 110 Boerum Place BrooklynUnderground Plumbing work for new 6 story residential buildingmultifamilyFire protection, Plumbing· A & M Warshaw PLBG & HTG—Jul 14
- 1505 Emmons Avenue BrooklynFoundation in conjunction with NB GC # B00969850-I1multifamilyBuilding, Fire protection, HVAC / Mechanical, Plumbing· Royal Home Improvements I—Sep 11
- 2738 Atlantic Avenue BrooklynHerewith filing for hydraulically designed sprinkler system, with booster pump, for proposed 4-story mixed use building.multifamilyFire protection, Plumbing· T.N.T PLBG & HTG Inc—Dec 10
- 328 12 Street BrooklynPropose Foundation Underpinning work in conjunction with Alt-CO # B00562773-I1.multifamilyBuilding· Harry's Design Inc$59KDec 9
- 2344 Eastchester Road BronxINSTALLATION OF MECHANICAL SYSTEMS, EQUIPMENT AND DUCTWORK. FILED IN CONJUNCTION WITH ALT APPLICATION DOB NOW #X00668280.commercialHVAC / Mechanical· Dasr Corp$87.5KDec 6