New York City commercial construction projects
61,981 commercial and multifamily projects from New York City’s building permit records (11,164 of them permitted in the last 90 days), newest first, each with its address, scope, value and permits. The contractor is named once a project’s first permit is 30 days old (first permit on or before October 7, 2026); Pro shows it, with the phone number, the day the permit is issued.
Source: building permit records from New York City's Socrata open-data portal, checked daily. Data through . How we count
Page 1144 of 1240
- 4074 Victory Boulevard Staten IslandStand alone emergency generator mounted on grade with built in 275 gallon diesel tank.commercialHVAC / Mechanical· Champion Combustion Corp$225KJan 29
- 118-35 Queens Boulevard QueensFiling to modify HVAC system with new AHU and Condensing units as per plans. No change in use, egress, or occupancy under this application.commercialHVAC / Mechanical· Allied MD Construction LL$50KDec 9
- 23-34 30 Avenue QueensMechanical (Generator) application filed as per plans.commercialHVAC / Mechanical· Metro Builders Group LLC$40KJan 22
- 118-18 Union Turnpike QueensEXTERIOR REAR GARAGE REPAIRS AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.multifamilyBuilding· Burewala Construction Inc$68.5KApr 14
- 25-70 32 Street QueensPROPOSED INTERIOR ALTERATIONS AT CELLAR LEVEL BUSINESS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.multifamilyBuilding· Forever New Construction$43.8KDec 9
- 37-67 82 Street QueensGeneral construction modifications to the 1st floor as per plans filed herewith. No change in use, egress or occupancy.commercialBuilding, Plumbing· Pine Street Carpenters In$63KDec 13
- 10-01 162 Street QueensFACADE REPAIRS, WORK TO INCLUDE CONCRETE AND STUCCO REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.multifamilyBuilding· Xinos Construction Corp$45.5KDec 9
- 37-11 Queens Boulevard QueensSCOPE OF WORK UNDER THIS APPLICATIONS INCLUDES NEW PLUMBING FIXTURES AND ASSOCIATED DOMESTIC WATER AND SANITARY PIPING WITHIN THE AREA OF WORK. Scope of work includes new…commercialFire protection· Mac Felder Inc$565KJan 23
- 34-38 31 Street QueensProposed timber roof replacement. No change in use, egress or occupancy.commercialBuilding· Trice Contracting Inc$50KDec 9
- 62-85 Forest Avenue QueensQ071 - CTF ROOM CONVERSION - CONVERT EXISTING 3RD FLOOR CLASSROOMS 306, 308A & 308B INTO A NEW MULTIMEDIA CENTER ROOM #306commercialBuilding· Empire Control Abatement$682KDec 9
- 1720 Village Lane Queensmechanical work as per plans filed herewith. no change to use, egress or occupancy.multifamilyHVAC / Mechanical· Fha Contracting Corp$220KDec 9
- 143-36 37 Avenue QueensPERFORM SPRINKLER WORK FOR PARTIAL BASEMENT COMMERCIAL SPACE OF AN EXISTING MIXED-USE BUILDING. DESIGN INCLUDES THE MODIFICATION AND INSTALLATION OF SPRINKLER SYSTEMS. NO CHANGE…multifamilyFire protection, Plumbing· MPS Plumbing & Heating In$137KJan 2
- 222-15 56 Avenue QueensPROPOSED SUPPORT OF EXCAVATION.commercial· Nagan Construction Inc$150KDec 9
- 147-15 45 Avenue QueensInstall new partitions for proposed Verizon equipment room in basement. Install 2 HVAC in proposed room with condensers located at rear wall. Verizon equipment filed under job #…multifamilyBuilding· Fast Track Electric Corp$65KDec 9
- 110-72 Corona Avenue QueensProposed subsequent filing new grass stairs and glass partitions in cellar, first and second floors professional school in conjunction with primary application number…commercialBuilding· FRSS Group Corp—Dec 9
- 91-09 Corona Avenue QueensPROPOSED HORIZONTAL AND VERTICAL ENLARGEMENT OF EXISTING 2 1/2 STORY BRICK BUILDING, AND COVERT TO 3 STORY MIXED USE BRICK BUILDING. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.multifamilyBuilding· TLS Construction Group I$842KDec 9
- 1212 Seagirt Boulevard Queensapplication filed in conjunction with NB application for Mechanical workcommercialHVAC / Mechanical· Windstar Cooling Inc$500KDec 9
- 19-19 Cornaga Avenue QueensSPRINKLER/STANDPIPE WORK FILED IN CONJUNCTION WITH NB 420667264multifamilyFire protection· Flint Mechanical Corp$504KDec 10
- 2931 8 Avenue ManhattanFILING FOR STRUCTURAL WORK IN CONJUNCTION WITH MODIFICATIONS TO EXISTING COMPACTOR ROOM FOR THE INSTALLATION OF A PNEUMATIC WASTESYSTEM AND COLLECTION ROOM. NO CHANGE TO USE…multifamilyBuilding· Navillus Tile Inc$50KDec 9
- 51 West 89 Street ManhattanWSUR BLDG36_Roof Roofing Replacement and Rooftop Structure Renovation.multifamilyBuilding· Zoria Housing, LLC$558KDec 9
- 49 West 89 Street ManhattanWSUR BLDG35_Roof Roofing Replacement and Rooftop Structure Renovation.multifamilyBuilding· Zoria Housing, LLC$523KDec 9
- 250 West 55 Street ManhattanInterior fit out, partitions, ceilings, doors and finishes as shown on plans filed herewith. No change in use, egress or occupancy.commercialBuilding· Mass Contracting Corp$600KDec 9
- 1175 York Avenue ManhattanApplication for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.multifamily· Quality BLDG Construction—Dec 9
- 131 West 80 Street ManhattanINTERIOR RENOVATION OF BASEMENT LEVEL APARTMENT. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.multifamilyBuilding, Plumbing· S & B Construction Of NY$126KApr 9
- 749 Fdr Drive ManhattanFISP INSPECTION (Facade Inspection Safety Program)INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODSSEE ATTACHED PLANSDesignated Primary Site supervisor: Jesus Decolamultifamily· Structual Presv System—Dec 9
- 765 Fdr Drive ManhattanFISP INSPECTION (Facade Inspection Safety Program)INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODSSEE ATTACHED PLANSDesignated Primary Site supervisor: Jesus Decolamultifamily· Structual Presv System—Dec 9
- 108 Avenue D ManhattanFISP INSPECTION (Facade Inspection Safety Program)INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODSSEE ATTACHED PLANSDesignated Primary Site supervisor: Jesus Decolamultifamily· Structual Presv System—Dec 9
- 511 5 Avenue ManhattanStructural work as shown on plans filed herewith. No change in use, egress of occupancycommercialBuilding· MJM Associates Constr LLC$600KDec 23
- 950 3 Avenue ManhattanInstall Air Conditioning Ductwork, Supply Air Diffusers, Return Air Grilles, Transfer Air Ducts & Grilles, Exhaust & Toilet Exhaust Fans, Ductwork & Grilles, Dampers, Shut-off…commercialBuilding· Unity Construction Group$120KDec 9
- 950 3 Avenue ManhattanInstall Partitions, Doors, Suspended Ceiling, Millwork, Floor & Wall Finishes on 21st Floor Including Renovation of Existing Mens & Womens Restrooms and Install (2) All Gender…commercialBuilding· Unity Construction Group$480KDec 9
- 66 West 94 Street ManhattanOutriggers system installation for facade repairs and or inspection, NO CHANGE IN USE, EGRESS, OR OCCUPANCY.multifamilyBuilding· Xinos Construction Corp—Dec 9
- 319 East 25 Street ManhattanReplacement of front and west side parapet walls. no change in use, egress or occupancy.multifamilyBuilding· Allpro General Cntrting C$41.4KDec 9
- 867 Madison Avenue ManhattanMinor interior renovation in existing commercial space occupied by Ralph Lauren. Work to include new cashwrap/non load bearing partitions, floorings, ceilings, flooring and…commercialBuilding· Steadfast Development And$28.8KDec 9
- 920 Park Avenue ManhattanREPLACE FLOORING AND FINISHES. PROVIDE NEW PLUMBING AND LIGHT FIXTURES.multifamilyBuilding· Magnus GS Inc$40KDec 9
- 147 West 36 Street ManhattanInstallation of suspended scaffold for facade inspection/repair.commercialBuilding· Summit Development Corp—Dec 9
- 1095 Sixth Avenue ManhattanMinor interior demo of interior partitions, doors, suspended ceilings, office front system, flooring and finishes on the 36th & 37th Floors as per plans (SCB-36hth & 37th Floor…commercialBuilding· JT Magen & Company Inc$600KDec 9
- 579 Fort Washington Avenue ManhattanRestoration of basement apartment due to fire damage to rescind HPD vacate order #257603; installation of new slab-on-grade, partitions, windows, lighting fixtures and plumbing…multifamilyBuilding· Adonis General Contracto$67.5KDec 9
- 55 Hudson Yards ManhattanHEREWITH FILING FOR INTERIOR ARCHITECTURAL RENOVATIONS ON THE 48TH FLR (MARKETING FLR 49) PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Tri-Star Construction Cor$2MJan 14
- 140 West 79 Street ManhattanFACADE RESTORATION, INSPECTIONSmultifamily· Bulado General Contractor—Dec 9
- 337 East 17 Street ManhattanInstallation of suspended scaffold for facade work or inspectioncommercial· New J.D. Gen. Const. Inc—Dec 9
- 141 East 88 Street ManhattanApplication for the installation and use of material hoistmultifamily· Skytrac Access Group LLC—Dec 9
- 307 Grand Street ManhattanMechanical changes as indicated on plans; including Roof work to remove the existing roof top cooling tower, dunnage, all water-source piping, and the existing air handler in the…commercialBuilding, HVAC / Mechanical· Par Plumbing Co., Inc$350KMar 5
- 337 East 17 Street Manhattanfacade repairs to correct FISP swarmp conditionscommercialBuilding· G.R.&J Hub Home Improve$150KDec 9
- 687 Columbus Avenue ManhattanOutriggers system installation for facade repairs and or inspection, NO CHANGE IN USE, EGRESS, OR OCCUPANCY.multifamilyBuilding· Xinos Construction Corp—Dec 9
- 441 Columbus Avenue ManhattanMODIFICATIONS TO EXISTING MECHANICAL SYSTEMS TO INCLUDE HVAC REPLACEMENT. NO CHANGE OF USE, OCCUPANCY OR EGRESSmultifamilyHVAC / Mechanical· Metropolitan Mechanical C$271KDec 9
- 100 11 Avenue ManhattanTEMPORARY INSTALLATION OF ADJUSTABLE SUSPENDED SCAFFOLD. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. Designated Primary Site Supervisor: Dariusz Janczakmultifamily· Structual Presv System—Dec 9
- 1333 Broadway ManhattanGENERAL CONSTRUCTION ON THE 6TH FLOOR AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.commercialBuilding· Rinnovo Construction, LLC$385KDec 9
- 1633 Broadway ManhattanADDITION OF NEW INTERIOR NONBEARING PARTITION. NEW CEILING & FINISHES AS PER PLANS FILED HEREWITHIN. NO CHANGE IN USE, EGRESS, OR OCCUPANCYcommercialBuilding· JT Magen & Company Inc$70KDec 9
- 1370 Avenue Of The Americas ManhattanMECHANICAL MODIFICATIONS TAKING PLACE ON THE 4TH, 5TH, 7TH, 11TH AND 12TH FLOORS AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.commercialHVAC / Mechanical· Finaly Genl Contr Corp$95.1KDec 9
- 349 West 71 Street ManhattanRenovations of 1st and 2nd floor only. no change in use, egress or occupancy.multifamilyBuilding, Plumbing· Solomon Contracting Inc$100KDec 20