Issued Feb 3 · 3 permits
$448K
T/I - ORTHODONTIC OFFICE const type: VB occupancy: B 2020 MSBC occupant load: 13 sprinklered: no sac0.84: __ charges0.60 __ credits =0.24 __ net met council letter dated12/04/24…
Get ProEvery project in every city · from $79/mo
Get ProMonthly permit report
By declared value.
Issued Feb 3 · 3 permits
$448K
T/I - ORTHODONTIC OFFICE const type: VB occupancy: B 2020 MSBC occupant load: 13 sprinklered: no sac0.84: __ charges0.60 __ credits =0.24 __ net met council letter dated12/04/24…
Issued Feb 20 · 3 permits
$420K
T/I REMODEL const type: III-A occupancy: A3 2020 MSBC occupant load: 117 sprinklered: yes sac: _4.08_ charges _2.94_ credits = _12/19/24_ net met council letter dated __…
Source: building permit records from official city open-data portals, checked daily. Data through . How we count
Issued Feb 14 · 3 permits
$408K
interior remodeling and bathroom alterations. certificate of occupancy required: no const type: 5b occupancy: A3 2020 MSBC occupant load: 296 sprinklered: no sac: _0_ charges __…
Issued Feb 7
$299K
This application is in addition to permit BLDG1025136 applied for on 10/12/2023 BLDG1100219 emailed applicant on license flag - 2025-02-07 - lea
Issued Feb 7
$247K
Replacing make-up air unit with hydronic coils per approved plan.
Issued Feb 20
$140K
Wrecking former Smith Foundry Co building. Work to be completed in stages- first removing building and then completing testing and removal of footings and foundation. There is no…
Issued Feb 19 · 4 permits
$135K
NON-STRUCTURAL WATER DAMAGE REPAIRS AT BOTH MAIN FLOOR APARTMENTS (UNIT #1 AND UNIT #2). INSTALL NEW FIRE/SOUND RATED FLOOR/CEILING ASSEMBLY AND WALL ASSEMBLY WHERE FINISHES HAVE…
Issued Feb 11 · 2 permits
$130K
8 unit 3 level apartment building.
Issued Feb 27
$129K
Replace (3) packaged cooling only RTUs Review Note: Unless technically unfeasible, new and replacement rooftop equipment shall be provided with insulated curbs as described in…
Issued Feb 7 · 2 permits
$78.3K
HVAC REPLACMENTS FOR APARTMENT BUILDING
Other months: September 2026 · August 2026 · July 2026 · June 2026 · May 2026 · April 2026