Issued Jan 21
$7.5M
Water Contract 1408 Substation SS-A/SS-B Replacement at The Montebello Filtration Plant 2: SCOPE OF WORK: ------ GRADING, PAVING AND FENCING (EQUIPMENT) --------- Associated with…
Get ProEvery project in every city · from $79/mo
Get ProMonthly permit report
By declared value.
Issued Jan 21
$7.5M
Water Contract 1408 Substation SS-A/SS-B Replacement at The Montebello Filtration Plant 2: SCOPE OF WORK: ------ GRADING, PAVING AND FENCING (EQUIPMENT) --------- Associated with…
Issued Jan 7 · 2 permits
$3.5M
re-roofing at 2200 broening: Scope of work: exterior alterations to include: Roof replacement on main roof, penthouse, loading dock roof, dormer roofs, *no structural alterations…
Source: building permit records from official city open-data portals, checked daily. Data through . How we count
Issued Jan 23 · 4 permits
$1.9M
Harbor Logistics #1: INSTALL 2,503.22kwDC (4,279 PANEL) SOLAR PV SYSTEM ON EXISTING ROOF TOP USING A BALLAST SYSTEM
Issued Jan 6 · 5 permits
$1.6M
1212 Cathedral - BSO - back of house: Interior only - This project includes the interior renovation of the Basement Level Musician's Lounge as we as the interior renovation of…
Issued Jan 13 · 4 permits
$1.1M
Baltimore Museum of Art - Amend Permit COM2024-03631: ********* Amend Permit COM2024-03631 issued on 4/2/2025 to revise design of 1392 sq ft Textile Center space shown as********…
Issued Jan 8
$450K
St. Athanasius Coffee Bar & ADA Bathroom: NEW ADA ACCESSIBLE TOILET ROOM. NEW COFFEE BAR CASEWORK, SINK, & BEVERAGE FRIDGE. NEW MEP WORK & ACOUSTIC CEILING & LIGHTING IN LOWER…
Issued Jan 16 · 10 permits
$351K
Greenmount: Security cameras and access control 141 devices. Approved For Work only. Subject to the permitted uses and regulations under the provisions of the Zoning Ordinance.
Issued Jan 28
$327K
Park Heights Place: This property is in a Urban Renewal Plan Area and must follow URP guidelines. For more information visit,…
Issued Jan 8 · 2 permits
$321K
Perkins IV Bldg. A: Design and install an NFPA 13/13R sprinkler system for a new 4-story wood framed multi family residential building. System includes 576 new sprinklers and a…
Issued Jan 7 · 3 permits
$319K
OBM Office Cabling: 20 Low Voltage Data drops 150' or less runs
Other months: September 2026 · August 2026 · July 2026 · June 2026 · May 2026 · April 2026