Issued Oct 10
$10M
Addition of storm shelter/library - to include all MEPs ***ACCESS LADDER AND CANOPY DEFERRED. NOT PERMITTED ON SITE, OR TO BE CONSTRUCTED UNTIL REVISION IS SUBMITTED, REVIEWED,…
Get ProEvery project in every city · from $33/mo
Get ProMonthly permit report
By declared value.
Issued Oct 10
$10M
Addition of storm shelter/library - to include all MEPs ***ACCESS LADDER AND CANOPY DEFERRED. NOT PERMITTED ON SITE, OR TO BE CONSTRUCTED UNTIL REVISION IS SUBMITTED, REVIEWED,…
Issued Oct 29 · 2 permits
$3M
Sign Footing Permit/ 2021 I-Codes / 2020 NEC The approval of the building permit is limited to the footing/ base of the sign. Separate permits are required : 1) ROW permit 2)…
Source: building permit records from official city open-data portals, checked daily. Data through . How we count
Issued Oct 29 · 2 permits
$3M
Sign Footing Permit/ 2021 I-Codes / 2020 NEC The approval of the building permit is limited to the footing/ base of the sign. A separate permits are required : ROW permit Sign…
Issued Oct 31
$3M
RMDL- CSL PLASMA CENTER to include M.E.P. 2021 iCodes/ 2020 NEC *The following will require separate permits: Fence and gates. Irrigation, Dumpster Enclosures, Signs, Fire…
Issued Oct 10
$2M
E-Space 2021 I-Codes / 2020 NEC Interior finish-out of existing space to create several clean room and processing operations. To include MEP. *Separate permits: fire alarm, fire…
Issued Oct 2
$1.8M
Victory Terrace Townhome Development 2021 I-Codes / 2020 NEC New Construction 4-story, 6-unit townhome development. To include MEP.
Issued Oct 14 · 8 permits
$1.7M
Interior Remodel/Interior Finish - To include MEPs 2021 I Codes / 2020 NEC Fire alarms/sprinklers/locking systems, signage, racking, retaining walls, paint booths, generators,…
Issued Oct 8
$1.5M
NEWC SHELL BUILDING ONLY to include M.E.P. 2021 iCodes/ 2020 NEC **No FINAL inspection shall be granted until deferred submittals of Trusses are reviewed and approved by COA.**…
Issued Oct 7 · 3 permits
$810K
Interior Finish - To include MEPs (change of use from M to A-3), Sprinklered w/1 hour demising walls REV01 - Eng letter for foundation REV02 - Play equipment engineering…
Issued Oct 17
$771K
Remodel - to include MEPs 2021 I Codes / 2020 NEC Fire alarms/sprinklers/locking systems, signage, racking, retaining walls, paint booths, generators, fences, pools, irrigation,…