Issued Aug 31 · 3 permits
$228M
Loews Arlington III 2021 I-Codes / 2020 NEC New construction type I-A hotel, 22 stories above grade(23 occupiable levels), 507 guest rooms. To include MEP. *NO FINAL INSPECTION…
Get ProEvery project in every city · from $79/mo
Get ProMonthly permit report
By declared value.
Issued Aug 31 · 3 permits
$228M
Loews Arlington III 2021 I-Codes / 2020 NEC New construction type I-A hotel, 22 stories above grade(23 occupiable levels), 507 guest rooms. To include MEP. *NO FINAL INSPECTION…
Issued Aug 20 · 4 permits
$43.9M
Building 1 (R-2/U/A-3) 13 Sprinkler 2021 I Codes /2020 NEC ***TRUSSES AND CARPORTS DEFERRED. NOT PERMITTED TO BE CONSTRUCTED OR ON SITE UNTIL REVISION IS SUMBITTED, REVIEWED, AND…
Source: building permit records from official city open-data portals, checked daily. Data through . How we count
Issued Aug 25 · 4 permits
$4M
2015 I-Codes / 2017 NEC New Construction 2-story type II-B multi-tenant structure. to include MEP. Interior finish-out will require separate permits per tenant space. REV. 01 -…
Issued Aug 28 · 7 permits
$3.8M
RMDL-EXISTING CROWNE PLAZA HOTEL TO INCLUDE M.E.P. 2021 iCodes/ 2020 NEC The following will require separate permits: Fire Sprinkler, Fire Alarm, Fire Suppression, Access…
Issued Aug 3 · 3 permits
$3.8M
New Construction - to include MEPs ***Separate IF permit required prior to occupancy*** REV01 - Remove insulation from wall details (warehouse) REV02 - Mechanical changes only…
Issued Aug 10 · 3 permits
$3.1M
NEWC-SHELL BUILDING ONLY TO INCLUDE ELECTRICAL AND PLUMBING. 2021 iCodes/ 2020 NEC The following will require separate permits: Fence and gates, Irrigation, Signs, Menu boards,…
Issued Aug 12
$2.7M
Remodel - To include MEPs Lighting and ceiling tiles throughout, bathroom remodel, window replacement 2021 I Codes / 2020 NEC SEPARATE FIRE PERMIT REQUIRED. FIRE PLANS FOR…
Issued Aug 28 · 7 permits
$2.5M
Tesla Collision Center 2021 I-Codes / 2020 NEC Construction of new collision center for Tesla, Inc. To include MEP. *Paint booth installation will require a separate permit…
137 Merchants Row Suite 125 Arlington
Issued Aug 31
$2.5M
RMDL-INTERIOR REMODEL FOR PROPOSED EOS FITNESS WITHOUT OUTDOOR EXERCISE AREA, TO INCLUDE M.E.P. 2021 iCodes/ 2020 NEC *The following require separate permits: Fire Sprinkler,…
Issued Aug 6 · 6 permits
$2.4M
Addition - to include mechanical and electrical F-1 Occ, 2060 sq ft 2021 I Codes / 2020 NEC Fire alarms/sprinklers/locking systems, signage, racking, retaining walls, paint…
Email me next month’s report
Free: Arlington’s October 2026 report when it’s out, and the week’s new commercial permits every Monday.
Get new Arlington projects the day they’re permitted
Same-day email alerts, filters and CSV export.
See plansOther months: September 2026 · July 2026 · June 2026 · May 2026 · April 2026 · March 2026