Issued Mar 25
$777K
HIGH OAK PARK RENOVATIONS TO INCLUDE ELECTRICAL AND PLUMBING. 2021 iCodes/ 2020 NEC *The following will require separate permits: Irrigation
Get ProEvery project in every city · from $79/mo
Get ProMonthly permit report
By declared value.
Issued Mar 25
$777K
HIGH OAK PARK RENOVATIONS TO INCLUDE ELECTRICAL AND PLUMBING. 2021 iCodes/ 2020 NEC *The following will require separate permits: Irrigation
Issued Mar 20
$450K
New construction - Shell to include electrical REV01 - Move plumbing and deferred CFSF and awning details (09/25/26) ***Separate interior finish permits required for each suite…
Issued Mar 12
Source: building permit records from official city open-data portals, checked daily. Data through . How we count
$250K
INFS-OFFICE/WAREHOUSE LEASE SPACE to include M.E.P. 2021 iCodes/ 2020 NEC *The following will require separate permits: Pallet Racks/High Pile Storage Racks, Signs, Fire…
Issued Mar 19
$160K
Interior Finish - to include MEPs 2021 I Codes / 2020 NEC Fire alarms/sprinklers/locking systems, signage, racking, retaining walls, paint booths, generators, fences, pools,…
Issued Mar 14
$63.6K
Expanding lease space - Suite 400 (take over space previously 402) - To include Mechanical and Electrical 2021 I Codes / 2020 NEC Fire alarms/sprinklers/locking systems, signage,…
Issued Mar 18
$63K
Retaining wall only 2021 I Codes
Issued Mar 3
$49K
RMDL-CONVERTING PERGOLA AREA INTO STORAGE AREA to include Electrical. 2021 iCodes/ 2020 NEC
Issued Mar 25
$45K
Expanding suite (200 and 210 combined) - To include electrical 2021 I Codes / 2020 NEC Fire alarms/sprinklers/locking systems, signage, racking, retaining walls, paint booths,…
Issued Mar 14
$44.1K
2021 IBC Foundation Repair only **Must Call for a Final Inspection** Stamped engineer letter required at final inspection.
Issued Mar 21
$40K
Interior finish - to include MEPs (Fully Sprinklered) REV01 - mechanical changes REV02 - furniture/fixture and remove storage area 2021 I Codes / 2020 NEC Fire…
Email me next month’s report
Free: Arlington’s October 2026 report when it’s out, and the week’s new commercial permits every Monday.