Commercial General Building work permitted December 15, 2025, with 2 permits through May 18, 2026.
The purpose of this investigation will be to delineate the vertical and horizontal LPH plume and other subsurface petroleum impacts in the vicinity of the in-ground bus lifts and conduct LPH recovery efforts. This Subsurface Investigation will include the installation of four borings using hollow stem auger (HSA) drilling techniques. Two borings will be converted to groundwater recovery wells. AEC will also collect soil samples from each boring for laboratory analysis. Groundwater samples will only be collected in a boring that does not contain LPH. AEC will utilize the two recovery wells to…
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
2 permits issued Dec 15 – May 18, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#SB2600121 CONSTRUCTION · MISCELLANEOUS - SOIL BORING The purpose of this investigation will be to delineate the vertical and horizontal LPH plume and other subsurface petroleum impacts in the vicinity of the in-ground bus lifts and conduct LPH recovery efforts. This Subsurface Investigation will include the installation of four borings using hollow… |
Commercial and multifamily, biggest first.
Status: Permit Issued
| Not published |
| — |
#SB2600023 CONSTRUCTION · MISCELLANEOUS - SOIL BORING 9 borings will be advanced at the Site over a one day period. The borings will be advanced using a track-mounted, direct-push Geoprobe drilling device to a depth of approximately 30 feet. Bore holes will be filled in accordance with DC Department of Energy and the Environment (DOEE) regulations… Status: Permit Issued | Not published | — |