Commercial General Building, Electrical, Elevator, Hvac/Mechanical, Plumbing work permitted February 25, 2025, with 58 permits through September 24, 2026.
A PRIVATE BALCONY IS BEING CREATED AT THE 10TH FLOOR ON THE SOUTH SIDE BY CUTTING BACK THE SLAB ON THE 11TH FLOOR AND ROOF AND RECONFIGURING THE EXTERIOR WALL. A PRIVATE BALCONY IS BEING CREATED ON THE 11TH FLOOR ON THE NORTH SIDE BY CUTTING BACK THE ROOF AND RECONFIGURING THE EXTERIOR WALL ON THE 11TH FLOOR. FLOORS 10 AND 11 WILL NOT BE OCCUPIED AT THE TIME OF THE CONSTRUCTION. A FUTURE TI WILL SUBMIT A PERMIT SET FOR FUTURE FLOOR LAYOUT.
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
58 permits issued Feb 25 – Sep 24, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
Commercial and multifamily, biggest first.
#E2613279
SUPPLEMENTAL · ELECTRICAL
Status: Permit Issued
| Not published |
| — |
#E2612583 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#P2610664 SUPPLEMENTAL · PLUMBING AND GAS Status: Permit Issued | Not published | — |
#P2610663 SUPPLEMENTAL · PLUMBING AND GAS Status: Permit Issued | Not published | — |
#P2610630 SUPPLEMENTAL · PLUMBING AND GAS Status: Permit Issued | Not published | — |
#E2611554 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#E2611555 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#E2611343 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#B2605223 CONSTRUCTION · ALTERATION AND REPAIR INTERIOR RENOVATION OF THE PARTIAL 4TH FLOOR. THE WORK CONSISTS OF NON STRUCTURAL DEMOLITION, AND NEW GENERAL PLUMBING, ELECTRICAL, AND MECHANICAL WORK. NO STRUCTRUAL WORK IS REQUIRED. FURNITURE PERMIT WILL BE RUN SEPARATELY. THERE IS NO CHANGE OF USE. Status: Permit Issued | Not published | — |
#E2610894 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#P2609711 SUPPLEMENTAL · PLUMBING AND GAS Status: Permit Issued | Not published | — |
#B2605291 CONSTRUCTION · ALTERATION AND REPAIR INTERIOR RENOVATION OF THE PARTIAL 4TH FLOOR. THE WORK CONSISTS OF NON STRUCTURAL DEMOLITION, AND NEW GENERAL PLUMBING, ELECTRICAL, AND MECHANICAL WORK. NO STRUCTRUAL WORK IS REQUIRED. FURNITURE PERMIT WILL BE RUN SEPARATELY. THERE IS NO CHANGE OF USE. Status: Permit Issued | Not published | — |
#E2608990 SUPPLEMENTAL · ELECTRICAL Status: Completed | Not published | — |
#P2607733 SUPPLEMENTAL · PLUMBING AND GAS Status: Completed | Not published | — |
#M2603034 SUPPLEMENTAL · MECHANICAL Status: Completed | Not published | — |
#P2607676 SUPPLEMENTAL · PLUMBING AND GAS Plumbing trade Permit Status: Completed | Not published | — |
#E2608526 SUPPLEMENTAL · ELECTRICAL Status: Completed | Not published | — |
#E2608486 SUPPLEMENTAL · ELECTRICAL Status: Completed | Not published | — |
#B2604434 CONSTRUCTION · ALTERATION AND REPAIR An interior build-out for a 9,322 SF office tenant on the 5th floor. Scope includes A/E modifications as required, systems furniture and new finishes. No change in use group, structural or egress. Status: Completed | Not published | — |
#P2606770 SUPPLEMENTAL · PLUMBING AND GAS Status: Permit Issued | Not published | — |
#E2607193 SUPPLEMENTAL · ELECTRICAL Status: Completed | Not published | — |
#B2602601 CONSTRUCTION · ALTERATION AND REPAIR Install (6) car chargers on P1 and P4 levels of existing parking garage. Status: Completed | Not published | — |
#P2605706 SUPPLEMENTAL · PLUMBING AND GAS Status: Permit Issued | Not published | — |
#E2606638 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#E2605450 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#B2601367 CONSTRUCTION · ALTERATION AND REPAIR *NO STRUCTURAL WORK* Interior renovation of existing office space on 3rd floor. No change in egress, use, or occupancy. Status: Permit Issued | Not published | — |
#P2603980 SUPPLEMENTAL · PLUMBING AND GAS Status: Permit Issued | Not published | — |
#P2603341 SUPPLEMENTAL · PLUMBING AND GAS Status: Completed | Not published | — |
#B2600092 CONSTRUCTION · ALTERATION AND REPAIR INTERIOR BUILDOUT FOR 370 SF MAILROOM ON LEVEL 1 Status: Permit Issued | Not published | — |
#E2602163 SUPPLEMENTAL · ELECTRICAL Status: Completed | Not published | — |
#ER2600143 SHOP DRAWING · ELEVATOR - REPAIR 9 Passenger Cars - Furnish and Install New Side Wall Panels Construction of Recon Veneer on FR Substrate, Backwalls constructed of FR Aluminum Honeycomb faced with Porcelenosa tile and FR Substrate faced with Recon Veneer 2 Parking Garage Passenger Cars - Side wall Panels constructed of FR… Status: Permit Issued | Not published | — |
#E2513712 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#B2508110 CONSTRUCTION · ALTERATION AND REPAIR Demo and white box of vacant spaces on 5th floor east and west towers. Status: Completed | Not published | — |
#E2513548 SUPPLEMENTAL · ELECTRICAL Electrical Trade Permit Status: Permit Issued | Not published | — |
#E2513480 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#E2513439 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#P2511103 SUPPLEMENTAL · PLUMBING AND GAS Status: Permit Issued | Not published | — |
#E2512637 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#P2510387 SUPPLEMENTAL · PLUMBING AND GAS Status: Permit Issued | Not published | — |
#E2512537 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#E2512163 SUPPLEMENTAL · ELECTRICAL Status: Completed | Not published | — |
#B2506739 CONSTRUCTION · ALTERATION AND REPAIR INTERIOR RENOVATION TO 10TH & 11TH FLOOR OFFICE SPACE. PARTITIONS, DOORS, CEILINGS, FURNITURE, FINISHES, MEP, LIFE SAFETY AND NEW STRUCTURAL CONVENIENCE STAIR. 42,000 SQUARE FEET. FINNEGAN, HENDERSON. ACCELERATED REVIEW REQUEST. Status: Permit Issued | Not published | — |
#E2511072 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#E2510595 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#P2508531 SUPPLEMENTAL · PLUMBING AND GAS Status: Completed | Not published | — |
#P2508331 SUPPLEMENTAL · PLUMBING AND GAS Status: Completed | Not published | — |
#P2508235 SUPPLEMENTAL · PLUMBING AND GAS Status: Permit Issued | Not published | — |
#P2508234 SUPPLEMENTAL · PLUMBING AND GAS Status: Permit Issued | Not published | — |
#B2504708 CONSTRUCTION · ALTERATION AND REPAIR INTERIOR DEMOLITION TO TENANT CONVENIENCE STAIR FROM 9TH TO 10TH FLOORS. STRUCTURAL INFILL OF THE 10TH FLOOR SLAB. 500 SQUARE FEET. Status: Permit Issued | Not published | — |
#E2508727 SUPPLEMENTAL · ELECTRICAL Status: Completed | Not published | — |
#E2508728 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#E2508726 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#B2502448 CONSTRUCTION · ALTERATION AND REPAIR RENOVATION OF THE LEVEL P2. APPLYING NEW FINISHES AT THE INTERIOR. Status: Permit Issued | Not published | — |
#P2505834 SUPPLEMENTAL · PLUMBING AND GAS Status: Permit Issued | Not published | — |
#B2502447 CONSTRUCTION · ALTERATION AND REPAIR RENOVATION OF THE BUILDINGS MAIN LOBBY AND ENTRANCES ON LEVEL 1. DEMOLITION OF DECORATIVE ARCHES, DECORATIVE BALCONIES AND FINISHES. APPLYING NEW FINISHES AT THE LOBBY INTERIOR AND EXTERIOR. REPLACEMENT OF THE ENTRANCES CANOPIES WITH NEW CONSTRUCTION AND PATCHING THE IMPACTED PRECAST CONCRETE… Status: Permit Issued | Not published | — |
#BP2502425 POST CARD · BUILDING Status: Permit Issued | Not published | — |
#B2502451 CONSTRUCTION · ALTERATION AND REPAIR RENOVATION OF THE LEVEL P1. DEMOLITION OF INTERIOR PARTITIONS AND FINISHES. CONVERTING THE SPACE TO MEETING ROOMS AND KITCHEN AREA. APPLYING NEW FINISHES AT THE INTERIOR. RELOCATING THE EXTERIOR WALL TO THE PARKING AREA AND PROVIDING ADDITIONAL PARKING SPACES ON P1. Status: Completed | Not published | — |
#B2500174 CONSTRUCTION · ALTERATION AND REPAIR A PRIVATE BALCONY IS BEING CREATED AT THE 10TH FLOOR ON THE SOUTH SIDE BY CUTTING BACK THE SLAB ON THE 11TH FLOOR AND ROOF AND RECONFIGURING THE EXTERIOR WALL. A PRIVATE BALCONY IS BEING CREATED ON THE 11TH FLOOR ON THE NORTH SIDE BY CUTTING BACK THE ROOF AND RECONFIGURING THE EXTERIOR WALL ON THE… Status: Permit Issued | Not published | — |