Multifamily Elevator work permitted September 24, 2025, with 3 permits through July 14, 2026.
The removal of the existing escalator and replacement like-for-like in the entirety with an escalator in the existing well way. Foggy Bottom C04X01 & C04X06
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
3 permits issued Sep 24 – Jul 14, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#EA2601931 SHOP DRAWING · ELEVATOR - ALTERATION The removal of the existing escalator and replacement like-for-like in the entirety with an escalator in the existing well way. Foggy Bottom C04X01 & C04X06 Status: Permit Issued | Not published | — | |
#EA2600857 |
Commercial and multifamily, biggest first.
SHOP DRAWING · ELEVATOR - ALTERATION
The removal of two existing escalator and replacement like-for-like in the entirety with an escalator in the existing well way. Foggy Bottom C04X02 & C04X05
Status: Permit Issued
| Not published |
| — |
#EA2502566 SHOP DRAWING · ELEVATOR - ALTERATION The removal of the existing escalator and replacement like-for-like in the entirety with an escalator in the existing well way. Foggy Bottom C04X03 & C04X04 Status: Permit Issued | Not published | — |