Get ProEvery project in every city · from $79/mo
Get Procommercial project · Washington DC, DC
Commercial General Building work permitted September 12, 2025.
Site of Second Baptist Church Remove old slates on front gable and both front side roof replace with GAF SlateLine singles Antique Slate color. Remove 2 flat roof membrane on small front side roofs and replace with Fibertite roof Membrane off white color. Remove old built in gutter liner on both sides of the front gable and at both sides roofs and replace with copper built in gutter liner. Scaffold will be erected to perform work.
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
1 permit issued Sep 12 – Sep 12, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#B2507779 CONSTRUCTION · ALTERATION AND REPAIR Site of Second Baptist Church Remove old slates on front gable and both front side roof replace with GAF SlateLine singles Antique Slate color. Remove 2 flat roof membrane on small front side roofs and replace with Fibertite roof Membrane off white color. Remove old built in gutter liner on both… Status: Permit Issued |
Commercial and multifamily, biggest first.
| — |