Commercial General Building work permitted August 26, 2025, with 2 permits through January 30, 2026.
Removal of one (1) suspected 300-gallon underground storage tank from beneath asphalt. Backfill to grade with compacted grade materials to restore the disturbed area. Asphalt replacement to be restored by others.
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
2 permits issued Aug 26 – Jan 30, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#UT2600011 CONSTRUCTION · MISCELLANEOUS - UNDERGROUND STORAGE TANK Removal of one (1) suspected 300-gallon underground storage tank from beneath asphalt. Backfill to grade with compacted grade materials to restore the disturbed area. Asphalt replacement to be restored by others. Status: Permit Issued | Not published | — | |
Commercial and multifamily, biggest first.
#SB2500260 CONSTRUCTION · MISCELLANEOUS - SOIL BORING Advance three borings in the vicinity of the known fuel UST (based on data from the geophysical survey, site observations, and/or historical records) to a terminal depth of 25 feet bgs or groundwater, whichever is shallower, collecting soil samples in 5-foot intervals from 5 feet bgs to the… Status: Permit Issued |