Multifamily General Building, Electrical, Elevator, Hvac/Mechanical, Plumbing, Sign work permitted February 12, 2025, with 13 permits through May 7, 2026.
Install two (2) monument signs for Thomas Elementary School
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
13 permits issued Feb 12 – May 7, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#SG2600129 CONSTRUCTION · SIGN Install two (2) monument signs for Thomas Elementary School |
Commercial and multifamily, biggest first.
Status: Completed
| Not published |
| — |
#E2602763 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#E2512919 SUPPLEMENTAL · ELECTRICAL Status: Completed | Not published | — |
#E2512794 SUPPLEMENTAL · ELECTRICAL Status: Completed | Not published | — |
#EN2502042 SHOP DRAWING · ELEVATOR - NEW INSTALLING A PASSENGER MRL AT THOMAS ELEMENTARY SCHOOL, CAPACITY 3500, 200 FPM, 3 STOPS TRAVEL 26'-8" Status: Permit Issued | Not published | — |
#P2508930 SUPPLEMENTAL · PLUMBING AND GAS Status: Completed | Not published | — |
#M2503549 SUPPLEMENTAL · MECHANICAL Status: Completed | Not published | — |
#B2404974 CONSTRUCTION · ADDITION ALTERATION REPAIR THE PROJECT INVOLVES THE MODERNIZATION AND EXPANSION OF THOMAS ELEMENTARY SCHOOL IN THE MAYFAIR NEIGHBORHOOD IN WARD 7. THE ORIGINAL WING OF THE SCHOOL, BUILT IN 1946, WILL BE RESTORED AND MODERNIZED, WHILE THE WING ADDED IN 1967 WILL BE DEMOLISHED AND REPLACED WITH A NEW THREE-STORY ADDITION WITH… Status: Completed | Not published | — |
#E2506909 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#UP2500061 SUPPLEMENTAL · BOILER - UNFIRED PRESSURE VESSEL Status: Permit Issued | Not published | — |
#P2505247 SUPPLEMENTAL · PLUMBING AND GAS Status: Completed | Not published | — |
#P2504340 SUPPLEMENTAL · PLUMBING AND GAS Status: Completed | Not published | — |
#B2407683 CONSTRUCTION · ALTERATION AND REPAIR THE SCOPE OF THE FOUNDATION TO GRADE PHASE INCLUDES CONTINUED SITE DEMOLITION, INITIAL EXCAVATION, AND FOUNDATION CONSTRUCTION OF THE NEW BUILDING ADDITION. THE FOUNDATION TO GRADE PHASE ALSO INCLUDES PROPOSED WATER, SEWER, GAS, ELECTRIC, AND TELECOM SERVICE CONNECTIONS TO THE EXISTING 1940'S WING… Status: Completed | Not published | — |