Multifamily General Building, Electrical, Plumbing, Solar work permitted April 24, 2025, with 4 permits through March 9, 2026.
PROPOSED FLAT: THIS PERMIT IS FOR CERTIFICATE OF OCCUPANCY ONLY. ALL CONDITIONS ARE EXISTING. PERMIT REQUIRED TO SCHEDULE AND OBTAIN INSPECTIONS.
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
4 permits issued Apr 24 – Mar 9, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#E2606320 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — | |
Commercial and multifamily, biggest first.
#SOL2601371 CONSTRUCTION · SOLAR SYSTEM INSTALLATION OF A PV ROOF MOUNTED SOLAR SYSTEM WITH A CAPACITY OF 10.8 kW DC / 7.6 kW AC. THE POWER GENERATED BY THE PV SYSTEM WILL BE INTERCONNECTED WITH THE UTILITY GRID THROUGH THE EXISTING ELECTRICAL SERVICE EQUIPMENT (PEPCO). THE SYSTEM CONSISTS OF 24 TALESUN BIPRO PANELS, MODEL TM7G54M-450W,… Status: Permit Issued |
| Not published |
| — |
#P2508112 SUPPLEMENTAL · PLUMBING AND GAS Plumbing trade Permit Status: Permit Issued | Not published | — |
#B2503103 CONSTRUCTION · ALTERATION AND REPAIR PROPOSED FLAT: THIS PERMIT IS FOR CERTIFICATE OF OCCUPANCY ONLY. ALL CONDITIONS ARE EXISTING. PERMIT REQUIRED TO SCHEDULE AND OBTAIN INSPECTIONS. Status: Permit Issued | Not published | — |