Get ProEvery project in every city · from $79/mo
Get Promultifamily project · Washington DC, DC
Multifamily General Building, Elevator work permitted March 20, 2025, with 3 permits through September 16, 2025.
On existing building, swap 9 antennas, add 3 antennas, swap 12 radios, and remove 6 radios. There will be no structure height increase and no ground disturbance.
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
3 permits issued Mar 20 – Sep 16, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#AN2500112 CONSTRUCTION · MISCELLANEOUS - ANTENNA On existing building, swap 9 antennas, add 3 antennas, swap 12 radios, and remove 6 radios. There will be no structure height increase and no ground disturbance. Status: Permit Issued | Not published | — | |
Commercial and multifamily, biggest first.
#ER2502662 SHOP DRAWING · ELEVATOR - REPAIR Repair/ replace existing cab interiors to include panels, reveals, handrails, and T-bar ceilings Status: Permit Issued |
| Not published |
| — |
#B2310461 CONSTRUCTION · ALTERATION AND REPAIR Revision to Permit #B2303877: Architectural, Structural, and MEP plans have been partially modified. Some interior walls will be demolished to create a new pathway for trash removal, directing it to the exterior of the building instead of using the interior residential corridor. Status: Permit Issued | Not published | — |