Get ProEvery project in every city · from $79/mo
Get Procommercial project · Washington DC, DC
Commercial General Building, Electrical, Hvac/Mechanical, Plumbing work permitted May 4, 2026, with 4 permits through June 4, 2026.
Change of use from residential (R-2) to mixed-use (R-2 and B), incorporating a cafeteria located in the basement of the existing building. The work includes the installation of a new electrical system, modifications to selected plumbing fixtures, and interior renovations such as painting, tile finishing, and general aesthetic improvements. No structural or mechanical changes are proposed under this scope of work.
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
4 permits issued May 4 – Jun 4, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#P2608351 SUPPLEMENTAL · PLUMBING AND GAS Status: Permit Issued |
Commercial and multifamily, biggest first.
| Not published |
| — |
#E2608967 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#M2603056 SUPPLEMENTAL · MECHANICAL Status: Permit Issued | Not published | — |
#B2503467 CONSTRUCTION · ALTERATION AND REPAIR Change of use from residential (R-2) to mixed-use (R-2 and B), incorporating a cafeteria located in the basement of the existing building. The work includes the installation of a new electrical system, modifications to selected plumbing fixtures, and interior renovations such as painting, tile… Status: Permit Issued | Not published | — |