Commercial General Building, Hvac/Mechanical work permitted March 31, 2025, with 7 permits through October 20, 2026.
THE PROJECT SCOPE IS THE RAZE OF AN EXISTING UNOCCUPIED ACCESSORY BUILDING, USED TO HOUSE COMMUNICATION EQUIPMENT, DOWN TO THE FOUNDATION WITHOUT DISTURBING THE SUBSURFACE.
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
7 permits issued Mar 31 – Oct 20, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#R2400137 CONSTRUCTION · RAZE THE PROJECT SCOPE IS THE RAZE OF AN EXISTING UNOCCUPIED ACCESSORY BUILDING, USED TO HOUSE COMMUNICATION EQUIPMENT, DOWN TO THE FOUNDATION WITHOUT DISTURBING THE SUBSURFACE. Status: Permit Issued | Not published | — | |
Commercial and multifamily, biggest first.
#B2605344 CONSTRUCTION · ALTERATION AND REPAIR DGS Project. Install new generator and associated electrical equipment exterior to the existing building. Install underground ductbank, connecting new equipment to existing building electrical room. Status: Permit Issued |
| Not published |
| — |
#B2604225 CONSTRUCTION · ALTERATION AND REPAIR THIS IS A REVISON TO APPROVED PERMIT B2506450. - Install the new RTU and connect it to the existing ductwork in the building - Installation of new inline duct heat coil unit - Install a new electrical feed to power the new unit - Install of new BAS system. Status: Permit Issued | Not published | — |
#B2409473 CONSTRUCTION · ALTERATION AND REPAIR The new work includes the alteration and repair to the main police stations two (2) exterior communication towers (700 and 400) to be demolished and replaced with one (1) new 500 tower, electrical upgrades to the panelboards in main buildings basement, new temporary exterior guard booth, and… Status: Permit Issued | Not published | — |
#M2504959 SUPPLEMENTAL · MECHANICAL Status: Permit Issued | Not published | — |
#B2506450 CONSTRUCTION · ALTERATION AND REPAIR REMOVE EXISITING VARIABLE AIR VOLUME UNITS. REMOVE SECTION OF HOT WATER SUPPLY AND HOT WATER RETURN PIPING FOR NEW UNIT CONNECTION. -REMOVE SECTION OF SUPPLY/RETURN DUCTWORK FOR NEW UNIT CONNECTION. -PROVIDE AND INSTALL NEW VARIABLE VOLUME UNITS. INSTALL NEW PIPING AS NECESSARY. -INSTALL NEW… Status: Permit Issued | Not published | — |
#B2500658 CONSTRUCTION · ALTERATION AND REPAIR THE PROJECT IS A LEVEL 1 ALTERATION TO THE METROPOLITAN FOURTH DISTRICT POLICE DEPARTMENT CELL BLOCK FACILITY. THE EXISTING HOLDING CELL BLOCK IS TO BE UPGRADED WITH NEW CELLS, DOORS, AND FINISHES. MISCELLANEOUS UPGRADES ARE TO TAKE PLACE IN THE CORRIDOR 107 AND PROCESSING ROOM 106 TO MEET THE… Status: Permit Issued | Not published | — |