Commercial General Building, Plumbing work permitted September 22, 2025, with 2 permits through September 17, 2026.
A masonry block stem wall rebuild on one side of the church is proposed for installation at the above referenced project. The support system is intended to stabilize and provide longevity to the existing structure. Load requirements for the masonry block stem wall and concrete footing were calculated at areas identified by the contractor. Engineer performed design for this project - see page 2 for engineering notes and results. See page 3 for details of the masonry block stem wall and concrete footing. See page 4 for a layout of the repair on a footprint of the structure.
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
2 permits issued Sep 22 – Sep 17, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#P2611969 SUPPLEMENTAL · PLUMBING AND GAS Status: Permit Issued | Not published | — |
Commercial and multifamily, biggest first.
#B2508063 CONSTRUCTION · ALTERATION AND REPAIR A masonry block stem wall rebuild on one side of the church is proposed for installation at the above referenced project. The support system is intended to stabilize and provide longevity to the existing structure. Load requirements for the masonry block stem wall and concrete footing were… Status: Permit Issued | Not published | — |