Get ProEvery project in every city · from $79/mo
Get Promultifamily project · Washington DC, DC
Multifamily General Building work permitted March 27, 2026.
The project proposes resurfacing and re-grading the existing asphalt pavement within the site to improve surface runoff and eliminate ponding. The project includes new surface course and full depth asphalt pavement, new curb and gutter and storm drainage utilities. Theis project is exempt from stormwater management under SW exemption 517.2. New connections to existing DC Water infrastructure are not required by the scope of work for this project.
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
1 permit issued Mar 27 – Mar 27, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#B2510303 CONSTRUCTION · ALTERATION AND REPAIR The project proposes resurfacing and re-grading the existing asphalt pavement within the site to improve surface runoff and eliminate ponding. The project includes new surface course and full depth asphalt pavement, new curb and gutter and storm drainage utilities. Theis project is exempt from… Status: Permit Issued |
Commercial and multifamily, biggest first.
| Not published |
| — |