Get ProEvery project in every city · from $79/mo
Get Promultifamily project · Washington DC, DC
Multifamily General Building, Electrical, Elevator work permitted February 4, 2025, with 3 permits through May 12, 2025.
installing a passenger hydro elevator. Capacity 950,spped 40 FPM, 4 stops, 1 phase, 60 hertz
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
3 permits issued Feb 4 – May 12, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#EN2501768 SHOP DRAWING · ELEVATOR - NEW installing a passenger hydro elevator. Capacity 950,spped 40 FPM, 4 stops, 1 phase, 60 hertz Status: Permit Issued | Not published | — | |
Commercial and multifamily, biggest first.
#E2506495 SUPPLEMENTAL · ELECTRICAL Electrical Trade Permit Status: Permit Issued |
| Not published |
| — |
#B2501682 CONSTRUCTION · ALTERATION AND REPAIR Demolition of concrete pad area 3' x 3', pour recessed concrete elevator pit, partial floor joist and subfloor in closet area, install structural beams to support floor joist, install elevator rail blocking, drywall, new doors, drywall, paint Status: Permit Issued | Not published | — |