Get ProEvery project in every city · from $79/mo
Get Promultifamily project · Washington DC, DC
Multifamily Electrical, Solar work permitted August 25, 2025, with 2 permits through August 26, 2025.
Installation of 6.88 kW roof-mounted solar system with (16) SEG SOLAR INC. SEG-430-BTD-BG MODULES (430W) and (16) ENPHASE ENERGY INC. IQ8PLUS-72-M-US [240V] MICROINVERTERS. Load side interconnection via PV breaker at the opposite end of the main breaker. #DCSEUSolarForAll2025
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
2 permits issued Aug 25 – Aug 26, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#E2512851 SUPPLEMENTAL · ELECTRICAL Status: Completed | Not published | — | |
#SOL2503815 |
Commercial and multifamily, biggest first.
CONSTRUCTION · SOLAR SYSTEM
Installation of 6.88 kW roof-mounted solar system with (16) SEG SOLAR INC. SEG-430-BTD-BG MODULES (430W) and (16) ENPHASE ENERGY INC. IQ8PLUS-72-M-US [240V] MICROINVERTERS. Load side interconnection via PV breaker at the opposite end of the main breaker. #DCSEUSolarForAll2025
Status: Completed
| Not published |
| — |