Multifamily Electrical, Solar work permitted October 24, 2025, with 3 permits through October 31, 2025.
TO INSTALL A ROOF MOUNTED SOLAR PHOTOVOLTAIC SYSTEM AT THE OWNER RESIDENCE LOCATED AT 4118 EAST CAPITOL ST NE WASHINGTON, DC 20019 THE POWER GENERATED BY THE PV SYSTEM WILL BE INTERCONNECTED WITH THE UTILITY GRID THROUGH THE EXISTING ELECTRICAL SERVICE EQUIPMENT.DC SYSTEM SIZE: 8.360 KW AC SYSTEM SIZE: 7.600 KW
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
3 permits issued Oct 24 – Oct 31, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#E2601282 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — | |
Commercial and multifamily, biggest first.
#E2601002
SUPPLEMENTAL · ELECTRICAL
Status: Permit Issued
| Not published |
| — |
#SOL2504233 CONSTRUCTION · SOLAR SYSTEM TO INSTALL A ROOF MOUNTED SOLAR PHOTOVOLTAIC SYSTEM AT THE OWNER RESIDENCE LOCATED AT 4118 EAST CAPITOL ST NE WASHINGTON, DC 20019 THE POWER GENERATED BY THE PV SYSTEM WILL BE INTERCONNECTED WITH THE UTILITY GRID THROUGH THE EXISTING ELECTRICAL SERVICE EQUIPMENT.DC SYSTEM SIZE: 8.360 KW AC SYSTEM… Status: Permit Issued | Not published | — |