Commercial General Building, Elevator work permitted June 29, 2026, with 2 permits through July 22, 2026.
HISTORIC- New controller, new power unit, new jack equipment, new car equipment, new hoistway equipment, new pit equipment, new cab door, new car fixtures, new hall fixtures.
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
2 permits issued Jun 29 – Jul 22, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#EA2602020 SHOP DRAWING · ELEVATOR - ALTERATION HISTORIC- New controller, new power unit, new jack equipment, new car equipment, new hoistway equipment, new pit equipment, new cab door, new car fixtures, new hall fixtures. Status: Permit Issued | Not published | — | |
Commercial and multifamily, biggest first.
#B2606263 CONSTRUCTION · ALTERATION AND REPAIR FOR DIGITAL WALKTHROUGH ***INTERIOR WORK ONLY*** Repair and replace the following items in the elevator machine room. Replacement of existing mainline and cab light disconnect. Replacement of existing machine room lights & outlets. replacement of existing sump pump and lights in elevator pit Status: Permit Issued |
| Not published |
| — |