Commercial General Building, Plumbing work permitted January 10, 2025, with 16 permits through October 13, 2026.
Pepco to remove the existing GDS Blue building from the north side of the Benning Facility.
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
16 permits issued Jan 10 – Oct 13, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#R2600020 CONSTRUCTION · RAZE Pepco to remove the existing GDS Blue building from the north side of the Benning Facility. Status: Permit Issued | Not published | — | |
#P2611871 |
Commercial and multifamily, biggest first.
SUPPLEMENTAL · PLUMBING AND GAS
Status: Permit Issued
| Not published |
| — |
#SB2600187 CONSTRUCTION · MISCELLANEOUS - SOIL BORING Construction of four soil borings to 12 feet below ground surface (bgs) using geoprobe/direct push drilling methods to obtain soil samples for analytical testing used to determine appropriate soil disposal options. Construction of three groundwater monitoring wells (two 2-diameter and one… Status: Permit Issued | Not published | — |
#SB2600189 CONSTRUCTION · MISCELLANEOUS - SOIL BORING Geotechnical Soil Borings Status: Permit Issued | Not published | — |
#B2601028 CONSTRUCTION · NEW BUILDING Pepco to install a new premanufactured Fire Pump House (40-7 x 16-7 and 14-1 in height) at the northwest corner of their existing Benning Road facility. Status: Permit Issued | Not published | — |
#BCIV2500220 CONSTRUCTION · CIVIL PLANS Pepco to upgrade the existing substation 041 within their property at 3400 Benning Road NE. Site improvements include the installation of one bioretention facility, new substation electrical equipment and electric lines, a new driveway, new storm drain connections, site grading, and relocation of… Status: Permit Issued | Not published | — |
#B2603096 CONSTRUCTION · ALTERATION AND REPAIR REPLACE THE EXISTING 660 GALLON BACKUP GENERATOR FUEL SUPPLY ABOVEGROUND STORAGE TANK (AST) SYSTEM INCLUDING: TANK AND ACCESS STAIRS, FUEL PIPING, DAY TANK, MONITORING AND OVERFILL ALARM SYSTEMS. AFFECTED WORK AREA 990 SF. Status: Permit Issued | Not published | — |
#B2507699 CONSTRUCTION · ADDITION ALTERATION REPAIR Pepco to install upgraded security measures and replace the existing fence for Sub 7 within their Benning Facility Status: Permit Issued | Not published | — |
#B2500636 CONSTRUCTION · ALTERATION AND REPAIR Pepco to upgrade their fence and security around their substation #45 within their Benning Facility. Status: Permit Issued | Not published | — |
#BCIV2500139 CONSTRUCTION · CIVIL PLANS Pepco to relocate one transmission feeder, one distribution duct bank, and remove and reinstall two (2) electrical transformers in the northwest portion of their substation facility at 3400 Benning Road NE. Status: Permit Issued | Not published | — |
#BCIV2500056 CONSTRUCTION · CIVIL PLANS Abandonment/removal/cut/cap/grout five crossings at inlet structures, reconnect two existing structures to the existing outfall with associated new piping and an additional new manhole and inlet, installing and maintaining erosion and sediment control measures, and pavement/site restoration. All… Status: Permit Issued | Not published | — |
#SB2500135 CONSTRUCTION · MISCELLANEOUS - SOIL BORING Geotechnical soil boring Status: Permit Issued | Not published | — |
#SB2500049 CONSTRUCTION · MISCELLANEOUS - SOIL BORING AECOM proposes to install soil borings at five locations using a Geoprobe? DPT. Boring will be attempted to be advanced to 20 ft. bgs or refusal, whichever comes first. Four soil boring locations (TB-7, TB-8, TB- 9, and TB-10) are proposed within a 10-15 feet radius of the TB-2 sampling location… Status: Permit Issued | Not published | — |
#SB2500087 CONSTRUCTION · MISCELLANEOUS - SOIL BORING We will drill fifteen geotechnical borings to 75 feet below grade and seven borings to 15 feet below grade for a total of twenty-two borings. Borings will be advanced to the depths indicated or to refusal, whichever occurs first. The borings will be drilled using hollow-stem auger or mud-rotary… Status: Permit Issued | Not published | — |
#SB2500063 CONSTRUCTION · MISCELLANEOUS - SOIL BORING Installation of two monitoring well for assessment of groundwater. Status: Permit Issued | Not published | — |
#P2502889 SUPPLEMENTAL · PLUMBING AND GAS Plumbing trade Permit Status: Permit Issued | Not published | — |