Multifamily General Building work permitted March 5, 2026, with 4 permits through September 28, 2026.
FOUNDATION FOR ADDITION OF AN ENCLOSED AQUATIC CENTER TO AN EXISTING RECREATION CENTER.
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
4 permits issued Mar 5 – Sep 28, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#FD2600012 CONSTRUCTION · FOUNDATION ONLY FOUNDATION FOR ADDITION OF AN ENCLOSED AQUATIC CENTER TO AN EXISTING RECREATION CENTER. Status: Permit Issued | Not published | — | |
#BCIV2600130 CONSTRUCTION · CIVIL PLANS Phase 1 of 3 for Hillcrest Aquatic Center Project. Includes exterior demolition to prepare for future work along with the installation of the geothermal systems. |
Commercial and multifamily, biggest first.
Status: Permit Issued
| Not published |
| — |
#SB2600150 CONSTRUCTION · MISCELLANEOUS - SOIL BORING Drilling 1 closed loop geothermal well at 400 feet. Status: Permit Issued | Not published | — |
#SB2600063 CONSTRUCTION · MISCELLANEOUS - SOIL BORING All the borings are performed outside. The work includes 3 Soil Test borings to a depth of 40 feet (26B-1 to 26B-3), 1 Soil Test Boring to a depth of 15 feet (26B-4), and 1 auger probe for infiltration testing to a depth of 10 feet (26IT-1). Status: Permit Issued | Not published | — |