Commercial General Building work permitted August 11, 2025.
EXISTING ROOF PREPARATIONS ? Gravel vac the existing ballast rock and dispose at an offsite location. ? Slice the existing EPDM membrane in a 10 x 10 grid pattern and leave in place. ? Remove and dispose of existing base flashings, as needed, and dispose of all debris at an offsite location. ? Existing leader heads and downspouts to remain in place and be reused. INSTALLATION OF NEW ROOF ? Provide and mechanically attach ? per Foot Slope, Polyiso tapered crickets between roof scuppers to promote positive drainage. ? On Sections 1-4, provide and mechanically attach a ? Fan Fold Coverboard…
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
1 permit issued Aug 11 – Aug 11, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#B2506534 CONSTRUCTION · ALTERATION AND REPAIR EXISTING ROOF PREPARATIONS ? Gravel vac the existing ballast rock and dispose at an offsite location. ? Slice the existing EPDM membrane in a 10 x 10 grid pattern and leave in place. ? Remove and dispose of existing base flashings, as needed, and dispose of all debris at an offsite location. ?… |
Commercial and multifamily, biggest first.
Status: Completed
| Not published |
| — |