Get ProEvery project in every city · from $79/mo
Get Promultifamily project · Washington DC, DC
Multifamily General Building work permitted November 3, 2025.
Furnish labor and materials to replace obsolete existing ELLENCO NV hardwire Fire alarm control panel with a new addressable Notifier N16E fire alarm control panel. All existing field devices shall be replaced with a new addressable field devices for compatibility purposes. The existing 12-volt AC series bells shall be replaced with 24-volt DC bells and visual notification appliances wo be installed adjacent to each bells. Unless otherwise noted, our intent is to use all existing device locations, back box, and wire. The existing level of protection shall be maintained and the existing…
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
1 permit issued Nov 3 – Nov 3, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#B2508929 CONSTRUCTION · ALTERATION AND REPAIR Furnish labor and materials to replace obsolete existing ELLENCO NV hardwire Fire alarm control panel with a new addressable Notifier N16E fire alarm control panel. All existing field devices shall be replaced with a new addressable field devices for compatibility purposes. The existing 12-volt AC… |
Commercial and multifamily, biggest first.
Status: Permit Issued
| Not published |
| — |