Get ProEvery project in every city · from $79/mo
Get Procommercial project · Washington DC, DC
Commercial General Building, Sign work permitted March 11, 2025, with 7 permits through October 23, 2026.
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
7 permits issued Mar 11 – Oct 23, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#SS2600010 CONSTRUCTION · SPECIAL SIGN changing out ad on sign COPY CHANGE ONLY Status: Permit Issued | Not published | — | |
#SS2600008 CONSTRUCTION · SPECIAL SIGN Change out banner ad only, no structural changes, just ad copy. |
Commercial and multifamily, biggest first.
Status: Permit Issued
| Not published |
| — |
#SS2600007 CONSTRUCTION · SPECIAL SIGN changing out banner ad. Status: Permit Issued | Not published | — |
#SS2600006 CONSTRUCTION · SPECIAL SIGN change out artwork on special sign Status: Permit Issued | Not published | — |
#SB2600074 CONSTRUCTION · MISCELLANEOUS - SOIL BORING GSI plans to drill eight (8) soil test borings to confirm soil strength with a hollow-stem auger equipped with a split spoon sampler for the SPT N-value tests down to planned depths of 25 to 80 feet below existing grades. All borings will be drilled to the maximum planned depth or auger refusal,… Status: Permit Issued | Not published | — |
#SS2500003 CONSTRUCTION · SPECIAL SIGN Revise Special Sign Permit SS2400002 issued 02/14/25 reflecting the change on pages 3 and 4 of the drawings and 2nd page of the calculations to show the footer depth change has increased to 112. Status: Permit Issued | Not published | — |
#SS2400002 CONSTRUCTION · SPECIAL SIGN Special Sign location change from 607 New York Avenue NW to 25 Potomac Avenue SE Status: Permit Issued | Not published | — |