Commercial General Building, Electrical, Plumbing work permitted March 21, 2025, with 5 permits through August 1, 2025.
EXTERIOR RESTROOM ADDITION - INCLUDES THE INSTALLATION OF NEW EXTERIOR WALL ASSEMBLY, PLUMBING FIXTURES, RESTROOM ACCESSORIES, FINISHES, CEILING AND LIGHTING. RESTROOMS ARE TO MEET LOCAL REQUIREMENTS.
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
5 permits issued Mar 21 – Aug 1, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#B2500071 CONSTRUCTION · ADDITION ALTERATION REPAIR EXTERIOR RESTROOM ADDITION - INCLUDES THE INSTALLATION OF NEW EXTERIOR WALL ASSEMBLY, PLUMBING FIXTURES, RESTROOM ACCESSORIES, FINISHES, CEILING AND LIGHTING. RESTROOMS ARE TO MEET LOCAL REQUIREMENTS. Status: Permit Issued | Not published |
Commercial and multifamily, biggest first.
| — |
#P2506613 SUPPLEMENTAL · PLUMBING AND GAS Status: Permit Issued | Not published | — |
#E2507328 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#B2501245 CONSTRUCTION · ALTERATION AND REPAIR LIKE FOR LIKE REPLACEMENT OF FIXTURES AND FINISHES OF EXISTING MEMBERS RESTROOM. REPLACEMENT OF EXISTING CART RAIL FROM ENTRANCE TO FAR WALL OF BUILDING Status: Permit Issued | Not published | — |
#B2407133 CONSTRUCTION · ALTERATION AND REPAIR THE CONSTRUCTION CONSISTS OF THE DEMOLITION OF A PORTION OF EXISTING EXTERIOR WALL AT THE VESTIBULE FOR THE INSTALLATION OF A NEW OVERHEAD SECTIONAL DOOR AND A NEW MANUAL DOOR IN AN EXISTING 160,638 SQUARE FOOT FULLY SPRINKLERED BUILDING. THE WORK INCLUDES, BUT IS NOT LIMITED TO, STRUCTURAL WORK… Status: Permit Issued | Not published | — |