Commercial General Building, Electrical work permitted May 28, 2025, with 11 permits through July 9, 2026.
This soil boring permit comprises up to thirty-six (36) environmental soil borings that will be drilled at five (5) different impacted locations at the Site. The 36 borings will be drilled to a maximum depth of 35 below ground surface (bgs). At up to 11 (eleven) soil boring locations, temporary groundwater monitoring wells will be installed.
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
11 permits issued May 28 – Jul 9, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#SB2600147 CONSTRUCTION · MISCELLANEOUS - SOIL BORING This soil boring permit comprises up to thirty-six (36) environmental soil borings that will be drilled at five (5) different impacted locations at the Site. The 36 borings will be drilled to a maximum depth of 35 below ground surface (bgs). At up to 11 (eleven) soil boring locations, temporary… Status: Permit Issued |
Commercial and multifamily, biggest first.
| Not published |
| — |
#E2609750 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#SB2600139 CONSTRUCTION · MISCELLANEOUS - SOIL BORING In the Kingman Park Historic District In the Commission of Fine Arts jurisdiction area Five monitoring wells will be installed to complete slug testing in support of a dewatering settlement analysis required by the District Department of Transportation (DDOT) as part of the sewer realignment… Status: Permit Issued | Not published | — |
#E2609133 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#E2607527 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#E2606828 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#SB2600026 CONSTRUCTION · MISCELLANEOUS - SOIL BORING CFA / HISTORIC We plan to drill 4 geotechnical borings and perform 2 cone penetration tests (CPT) at the southwest corner of the property to help with geotechnical design of the proposed stadium development. The borings and CPTs will extend to a maximum depth of 100 feet below grade. Soil samples… Status: Permit Issued | Not published | — |
#SB2600028 CONSTRUCTION · MISCELLANEOUS - SOIL BORING CFA / H We will perform 5 geotechnical borings up to 100 feet below existing grade. Select soil samples will be taken for laboratory testing. Drilling and abandonment of borings will be performed in accordance with DOEE requirements. All investigation-derived waste will be containerized and… Status: Permit Issued | Not published | — |
#SB2500261 CONSTRUCTION · MISCELLANEOUS - SOIL BORING Commission of Fine Arts jurisdiction area We will perform a geotechnical investigation consisting of 42 geotechnical borings, 10 cone penetration tests (CPT), and 3 dilatometer tests (DMT) at the site. Five (5) groundwater monitoring wells will be installed in boreholes for groundwater monitoring.… Status: Permit Issued | Not published | — |
#E2509879 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#E2509193 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |