Commercial General Building, Electrical work permitted July 24, 2025, with 7 permits through October 15, 2026.
APPROVED PLAN REVISION TO RFK STADIUM STORM SEWER RELOCATION PLANS (BCIV2500224) THE RFK REDEVELOPMENT PROJECT WILL CATALYZE THE TRANSFORMATION OF THE ENTIRE 180-ACRE CAMPUS, WHICH WILL INCLUDE HOUSING, PARKS, RECREATION FACILITIES, HOTELS, RESTAURANTS, RETAIL SPACES, AND NEIGHBORHOOD AMENITIES. THERE ARE MULTIPLE "DISTRICTS" WITHIN THE 180-ACRE CAMPUS, AND AS SUCH, THE PROJECT WILL BE COMPLETED OVER SEVERAL PHASES. THE FOCUS OF THIS PACKAGE IS ON THE STADIUM DISTRICT (WHICH GENERALLY LIES WITHIN THE BOUNDS OF C ST NE, INDEPENDENCE AVE SE, AND 22ND ST NE). THE FIRST STAGE OF THE PROJECT FOR…
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
7 permits issued Jul 24 – Oct 15, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#BCIV2600134 CONSTRUCTION · CIVIL PLANS APPROVED PLAN REVISION TO RFK STADIUM STORM SEWER RELOCATION PLANS (BCIV2500224) THE RFK REDEVELOPMENT PROJECT WILL CATALYZE THE TRANSFORMATION OF THE ENTIRE 180-ACRE CAMPUS, WHICH WILL INCLUDE HOUSING, PARKS, RECREATION FACILITIES, HOTELS, RESTAURANTS, RETAIL SPACES, AND NEIGHBORHOOD AMENITIES.… |
Commercial and multifamily, biggest first.
Status: Permit Issued
| Not published |
| — |
#SB2600182 CONSTRUCTION · MISCELLANEOUS - SOIL BORING Historic-CFA Perform a total of nineteen (19) 6-inch hollow stem SPT Borings to a maximum depth of 100 feet below current site grades, and a total of twenty-four (24) 2-inch direct push Geoprobe soundings to a maximum depth of 30 feet below current site grades. All work will be performed to obtain… Status: Permit Issued | Not published | — |
#SB2600142 CONSTRUCTION · MISCELLANEOUS - SOIL BORING CFA / H Completion of dewatering wells for placement of a new MS4 sewer line. 85 Borings to be installed along the trench to allow for removal of groundwater to facilitate placement of the sewer. Status: Permit Issued | Not published | — |
#SB2600069 CONSTRUCTION · MISCELLANEOUS - SOIL BORING CFA / H Geotechnical borings for soil sample collection for RFK Stadium Road Project. Borings will be drilled to 10 feet maximum. Backfilled, grouted and Asphalt patched. All cuttings will be contanerized and tetsted for hazardous materials Status: Permit Issued | Not published | — |
#BCIV2500224 CONSTRUCTION · CIVIL PLANS THE RFK REDEVELOPMENT PROJECT WILL CATALYZE THE TRANSFORMATION OF THE ENTIRE 180-ACRE CAMPUS, WHICH WILL INCLUDE HOUSING, PARKS, RECREATION FACILITIES, HOTELS, RESTAURANTS, RETAIL SPACES, AND NEIGHBORHOOD AMENITIES. THERE ARE MULTIPLE "DISTRICTS" WITHIN THE 180-ACRE CAMPUS, AND AS SUCH, THE… Status: Permit Issued | Not published | — |
#SB2600030 CONSTRUCTION · MISCELLANEOUS - SOIL BORING CFA / H Contractor will perform 50 Geoprobe borings to a depth of 50 ft to collect soil samples for testing for RFK Stadium testing. Any spoils on-site will drummed and sent for hazardous testing. All boring holes will be tremie grouted after completion. Status: Permit Issued | Not published | — |
#E2511493 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |