Commercial General Building, Electrical, Hvac/Mechanical, Plumbing, Solar work permitted March 19, 2025, with 19 permits through July 17, 2026.
REVISION TO THE SCOPE PREVIOUSLY APPROVED UNDER B2601861 INCLUDES, BUT IS NOT LIMITED TO: REMOVAL OF THE FUTURE GENERATOR ROOM AND ASSOCIATED ELECTRICAL, REMOVAL OF BREAK ROOM 104 WALLS, CEILING AND ASSOCIATED ELEMENTS, ELIMINATION OF ROOM SIDELITES AND WALL COVERINGS AT MEETING SPACES, REMOVAL OF NEW EXTERIOR GLASS (AND MAINTAIN EXISTING OVERHEAD DOOR), REVISION TO MAINTAIN EXISTING RESTROOMS, UPDATED DOOR SCHEDULE, LIGHTING, MECHANICAL, COMCHECK CALCULATIONS, AND PHOTOMETRIC UPDATES DUE TO THE ABOVE CHANGES.
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
19 permits issued Mar 19 – Jul 17, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
Commercial and multifamily, biggest first.
#B2606372 CONSTRUCTION · ALTERATION AND REPAIR REVISION TO THE SCOPE PREVIOUSLY APPROVED UNDER B2601861 INCLUDES, BUT IS NOT LIMITED TO: REMOVAL OF THE FUTURE GENERATOR ROOM AND ASSOCIATED ELECTRICAL, REMOVAL OF BREAK ROOM 104 WALLS, CEILING AND ASSOCIATED ELEMENTS, ELIMINATION OF ROOM SIDELITES AND WALL COVERINGS AT MEETING SPACES, REMOVAL OF… Status: Completed |
| Not published |
| — |
#E2610906 SUPPLEMENTAL · ELECTRICAL Status: Completed | Not published | — |
#E2610905 SUPPLEMENTAL · ELECTRICAL Status: Completed | Not published | — |
#E2610480 SUPPLEMENTAL · ELECTRICAL Status: Completed | Not published | — |
#P2609315 SUPPLEMENTAL · PLUMBING AND GAS Status: Completed | Not published | — |
#E2610122 SUPPLEMENTAL · ELECTRICAL Status: Completed | Not published | — |
#E2610123 SUPPLEMENTAL · ELECTRICAL Status: Completed | Not published | — |
#P2608873 SUPPLEMENTAL · PLUMBING AND GAS Status: Completed | Not published | — |
#M2603086 SUPPLEMENTAL · MECHANICAL Mechanical trade Permit Status: Completed | Not published | — |
#E2608348 SUPPLEMENTAL · ELECTRICAL Status: Completed | Not published | — |
#E2607375 SUPPLEMENTAL · ELECTRICAL Status: Completed | Not published | — |
#B2601861 CONSTRUCTION · ALTERATION AND REPAIR INTERIOR SCOPE OF WORK: INSTALLATION OF IT ROOM VESTIBULE, NEW IDF ROOM AT REAR OF SPACE AND NEW AIR COMPRESSOR ROOM. INSTALLATION OF NEW FOOTINGS AND FREE-STANDING VEHICLE LIFTS WITHIN EXISTING WAREHOUSE SPACE. NO CHANGE TO BUILDING STRUCTURE. MINOR RENOVATION OF EXISTING ADMINISTRATIVE OFFICE… Status: Completed | Not published | — |
#B2602214 CONSTRUCTION · ALTERATION AND REPAIR NEW PERIMETER SITE FENCING, VEHICULAR ACCESS GATE, PEDESTRIAN ACCESS GATE AND PRE-ENGINEERED SECURITY GUARD BOOTH ON EXISTING SITE. NO CHANGE TO PARKING, INGRESS OR EGRESS FROM THE EXISTING BUILDING. NO CHANGE TO ACCESSIBILITY. AREA AFFECTED 2078 SF Status: Completed | Not published | — |
#P2601847 SUPPLEMENTAL · PLUMBING AND GAS Status: Completed | Not published | — |
#BP2600383 POST CARD · BUILDING Status: Completed | Not published | — |
#SOL2503005 CONSTRUCTION · SOLAR SYSTEM Revision to SOL2403356 E01: drawing index updated G10: module layout change G20: module layout change G30: module layout change E10: module layout change, inverter location change E11: equipment location change E20: stringing change E30: line diagram change E50: labels update E60: grounding… Status: Completed | Not published | — |
#E2511335 SUPPLEMENTAL · ELECTRICAL Status: Completed | Not published | — |
#E2508808 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#E2506426 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |