Commercial General Building, Hvac/Mechanical work permitted January 28, 2025, with 3 permits through May 11, 2026.
Advance three soil borings using direct-push drilling methodology to a maximum depth of 15 feet below ground surface. The three borings will be converted into temporary monitoring wells. After receipt of the groundwater analytical results and discussion of the results with DOEE, the driller will remobilize to abandon the monitoring wells. The wells will be abandoned using bentonite grout composed of two parts bentonite to one part water.
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
3 permits issued Jan 28 – May 11, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#SB2600106 CONSTRUCTION · MISCELLANEOUS - SOIL BORING Advance three soil borings using direct-push drilling methodology to a maximum depth of 15 feet below ground surface. The three borings will be converted into temporary monitoring wells. After receipt of the groundwater analytical results and discussion of the results with DOEE, the driller will… |
Commercial and multifamily, biggest first.
Status: Permit Issued
| Not published |
| — |
#RW2600012 CONSTRUCTION · RETAINING WALL THIS PACKAGE IS FOR PERMIT OF RETAINING WALL AT PRIVATELY OWNED VEHICLE (POV) RAMP. Status: Permit Issued | Not published | — |
#FB2500053 SUPPLEMENTAL · BOILER - FUEL BURNING Status: Permit Issued | Not published | — |