Get ProEvery project in every city · from $79/mo
Get Promultifamily project · Washington DC, DC
Multifamily General Building, Electrical, Plumbing work permitted August 25, 2026, with 3 permits through October 13, 2026.
HISTORIC HIGHER FLAT ROOF SECTION:Removal and replacement of higher elevation flat roof with TPO membraneRemoval and replacement of pipe boots on replacement elevation with TPO pipe bootsRemoval and replacement of wind turbine on the replacement elevationCreating a small curb with 2x4 wood for the new wind turbine to ensure no water intrusionInstalling TPO coated drip edge to the replacement elevations eavesSecure TPO membrane against all brick walls/chimneys with termination barsRemoval and reinstallation of copper parapet wall coppings on top of replacement elevation (Not replacing copper…
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
3 permits issued Aug 25 – Oct 13, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#B2609080 CONSTRUCTION · ALTERATION AND REPAIR |
Commercial and multifamily, biggest first.
HISTORIC HIGHER FLAT ROOF SECTION:Removal and replacement of higher elevation flat roof with TPO membraneRemoval and replacement of pipe boots on replacement elevation with TPO pipe bootsRemoval and replacement of wind turbine on the replacement elevationCreating a small curb with 2x4 wood for the…
Status: Permit Issued
| Not published |
| — |
#P2612249 SUPPLEMENTAL · PLUMBING AND GAS Plumbing trade Permit Status: Permit Issued | Not published | — |
#E2612269 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |