Multifamily General Building, Electrical, Plumbing work permitted July 1, 2025, with 3 permits through August 7, 2025.
Carefully remove and dispose of the existing flooring in the dining/office area on the northeast side of the unit.Remove the existing subfloor to expose structural framing below.Inspect all exposed joists for damage or looseness.Secure loose joists using new, galvanized steel joist hangers.Replace any rotted joists only in this specific area as needed, using framing lumber matching the size and grade of existing joists.
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
3 permits issued Jul 1 – Aug 7, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#E2512048 SUPPLEMENTAL · ELECTRICAL Status: Completed | Not published |
Commercial and multifamily, biggest first.
| — |
#P2509940 SUPPLEMENTAL · PLUMBING AND GAS Status: Completed | Not published | — |
#B2507051 CONSTRUCTION · ALTERATION AND REPAIR Carefully remove and dispose of the existing flooring in the dining/office area on the northeast side of the unit.Remove the existing subfloor to expose structural framing below.Inspect all exposed joists for damage or looseness.Secure loose joists using new, galvanized steel joist… Status: Completed | Not published | — |