Get ProEvery project in every city · from $79/mo
Get Procommercial project · Washington DC, DC
Commercial General Building, Elevator work permitted October 30, 2025, with 2 permits through January 26, 2026.
Repair/replace part for Mod to include: retian jack/cylinder, new power unit, new oilm new controller, new battery lowering, new two way communication, new cartop fan, retain slide guides, new inserts for car guides, new travel cable, new door operator, new door detector, new car door, new hoistway door equipment, new COP, new hall stations, new jamb braille, new hall PI/lantern, retain cab shell, new cab interior, clad cab fronts, new oil line, retain cab fan, new hoistway doors and headers, new entrance frame, new front returns/transoms, and new car sill.
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
2 permits issued Oct 30 – Jan 26, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#EA2600592 SHOP DRAWING · ELEVATOR - ALTERATION Repair/replace part for Mod to include: retian jack/cylinder, new power unit, new oilm new controller, new battery lowering, new two way communication, new cartop fan, retain slide guides, new inserts for car guides, new travel cable, new door operator, new door detector, new car door, new… |
Commercial and multifamily, biggest first.
Status: Permit Issued
| Not published |
| — |
#B2509582 CONSTRUCTION · ALTERATION AND REPAIR Historic Districts: FOR DIGITAL WALKTHORUGH ***Interior Work Only*** Repair and replace the following items in the elevator machine room only. Replacement of existing mainline and cab light disconnect. Replacement of existing machine room lights & outlets. Replacement of existing sump pump and… Status: Permit Issued | Not published | — |